Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-47679
Well Classification: OW Status: PR - 5/1/2019
Well Name/No:Cosslett #1A-22H-B168
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2019
FacilityID:456856LocationID:332117
Municipality/County:ERIE / WELD #123Location:NWNE 22 1N68W 6
Field:WATTENBERG - #90750Elevation:5173 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:925FNL  2250 FELLat/Long: 40.041391 / -104.988083Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.041380 / -104.988090Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/21/2019
End Date: 4/7/2019
Reported: 6/7/2019
Days to report: 61
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/1/2019             Measured TD: 17546 ft.    Vertical TD: 8031 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/1/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:8/23/2020
Proposed Top PZ Location:Sec:22 Twp: 1N 68W Footage: 490 FNL  2676 FEL
Bottom Hole Location:Sec:27 Twp: 1N 68W Footage: 466 FSL  2646 FEL
Proposed Depth/Form:17654 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBFHC , Formation: NIOBRARA-FT HAYS-CODELL , Order: , Unit Acreage: 640, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 500 ft., Weight: 54.5 , Citings Type: PLANNED
Cement:Sacks: 538, Top: 0 ft., Bottom: 500 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2475 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 171, Top: 0 ft., Bottom: 5475 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17654 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2541, Top: , Bottom: 17654 ft.

Wellbore Completed
Completion Date:2/22/2019
Spud Date:10/25/2018Spud Date Is:ACTUAL
Measured TD:17546 ft.Measured PB depth:17521 ft.
True Vertical TD:8031 ft.True Vertical PB depth:8031 ft.
Top PZ Location:Sec:22 Twp: 1N 68WFootage: 490 FNL  2676 FEL
Bottom Hole Location:Sec:27 Twp: 1N 68WFootage: 466 FSL  2646 FEL
Log Types:Deep Conductor CBL, Surface CBL, CBL, MWD/LWD, Mud Log, (DIL in 123-21857)
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 510 ft., Weight: 78.67 , Citings Type: ACTUAL
Cement:Sacks: 125, Top: 410 ft., Bottom: 510 ft., Determination Method: CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2443 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 675, Top: 70 ft., Bottom: 2210 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 17535 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2620, Top: 5100 ft., Bottom: 17546 ft., Determination Method: CBL
Additional Cement:String Type: CONDUCTOR , Top: 40 ft., Depth: 320 ft., Bottom: 410 ft., Sacks: 343, Method: DV TOOL
Additional Cement:String Type: CONDUCTOR , Top: 0 ft., Depth: 40 ft., Bottom: 40 ft., Sacks: 29, Method: 1 INCH
Additional Cement:String Type: SURF , Top: 0 ft., Depth: 70 ft., Bottom: 70 ft., Sacks: 20, Method: 1 INCH
FormationInterval TopLog BottomCoredDSTs
SUSSEX4723 ft.NN
SHANNON5365 ft.NN
SHARON SPRINGS7559 ft.NN
NIOBRARA7591 ft.NN
FORT HAYS8334 ft.NN
CODELL9878 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 9/10/2019                 Interval Top: 8907 ft.    Interval Bottom: 11906 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:9/10/2019Treatment End Date:N/A
Treatment Summary:Codell: 9908-11906
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8907 ft.# Of Holes:991
Interval Bottom:11906 ft.Hole Size:

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 9/10/2019                 Interval Top: 8334 ft.    Interval Bottom: 17507 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:9/10/2019Treatment End Date:N/A
Treatment Summary:Ft Hays: 8334-8539, 11907-12382, 12740-12865, 13070-17507
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8334 ft.# Of Holes:991
Interval Bottom:17507 ft.Hole Size:

Formation NBFHC                   Formation Classification:  OW                   Status:  PR - 5/28/2019                 Interval Top: 7879 ft.    Interval Bottom: 17507 ft.

 Completed Information for Formation NIOBRARA-FT HAYS-CODELL
1st Production Date:6/5/2019Choke Size: 
Formation Name:NIOBRARA-FT HAYS-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/21/2019Treatment End Date:4/7/2019
Treatment Summary:229006 bbls of water, 235 bbls of additives (FRP-4CS, SAFE-BFH-2, XLS-3Z,BHL-68W, ACI-97, ASF-67, LGA-3J) and 18 bbl HCL in a 43 stage frac with 5812290 lbs of silica quartz proppant
Total fluid used in treatment (bbls):229259Max pressure during treatment (psi):8715
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:43
Total acid used in treatment (bbls):18Min frac gradient (psi/ft):0.84
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):9404
Fresh water used in treatment (bbls):229241Disposition method For flowback:DISPOSAL
Total proppant used (lbs):5812290Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8028 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/28/2019Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 686
BBLS_OIL 713
BTU_GAS 1297
CALC_BBLS_H2O 686
CALC_BBLS_OIL 713
CALC_GOR 2526
CALC_MCF_GAS 1801
CASING_PRESS 3000
GRAVITY_OIL 42
MCF_GAS 1801
TUBING_PRESS 2275
Perforation Data:
Interval Top:7879 ft.# Of Holes:991
Interval Bottom:17507 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 9/10/2019                 Interval Top: 7879 ft.    Interval Bottom: 13031 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/10/2019Treatment End Date:N/A
Treatment Summary:Nio: 7879-8291, 8540 -9866, 12383-12701, 12905-13031
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7879 ft.# Of Holes:991
Interval Bottom:13031 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)13594
Total Gas Produced (MCF)157680
GOR11599
GOR DeterminationBOE
Average BOE per Day111.689
Average MCFE per Day647.798

 Federal Financial Assurance  i 

 Tribal Well  i No