Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-47674
Well Classification: OW Status: PR - 5/23/2019
Well Name/No:Cosslett #1L-22H-B168
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/23/2019
FacilityID:456851LocationID:332117
Municipality/County:ERIE / WELD #123Location:NWNE 22 1N68W 6
Field:WATTENBERG - #90750Elevation:5174 ft.
Planned Location:926FNL  2140 FELLat/Long: 40.041389 / -104.987690Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.041370 / -104.987670Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/25/2019
End Date: 4/19/2019
Reported: 6/7/2019
Days to report: 49
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/23/2019             Measured TD: 17826 ft.    Vertical TD: 7869 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/23/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:8/23/2020
Prop Depth/Form:17900 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-2533 , Unit Acreage: 1920, Drill Unit: S22&27:E2;S23&26:ALL
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 500 ft., Weight: 54.5 , Citings Type: PLANNED
Cement:Sacks: 538, Top: 0 ft., Bottom: 500 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2536 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 641, Top: 0 ft., Bottom: 2536 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17900 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2579, Top: , Bottom: 17900 ft.

Wellbore Completed
Completion Date:11/24/2018
Spud Date:11/10/2018Spud Date Is:ACTUAL
Measured TD:17826 ft.Measured PB depth:17801 ft.
True Vertical TD:7869 ft.True Vertical PB depth:7869 ft.
Top PZ Location:Sec:22 Twp: 1N 68WFootage: 486 FNL  291 FELDepth
Bottom Hole Location:Sec:27 Twp: 1N 68WFootage: 465 FSL  188 FELDepth
Log Types:Deep Conductor CBL, Production CBL, MWD, MUD (DIL in API 123-21857)
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 518 ft., Weight: 54.5 , Citings Type: ACTUAL
Cement:Sacks: 176, Top: 330 ft., Bottom: 518 ft., Determination Method: CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2579 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 665, Top: 0 ft., Bottom: 2579 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17815 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2418, Top: 1210 ft., Bottom: 17826 ft., Determination Method: CBL
Additional Cement:String Type: CONDUCTOR , Top: 0 ft., Depth: 322 ft., Bottom: 330 ft., Sacks: 450, Method: DV TOOL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4919 ft.NN
SHANNON5554 ft.NN
SHARON SPRINGS7836 ft.NN
NIOBRARA7875 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 5/23/2019                 Interval Top: 8177 ft.    Interval Bottom: 17788 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:6/5/2019Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/25/2019Treatment End Date:4/19/2019
Treatment Summary:385001 bbls of water, 646 bbls of additives (FRP-4CS, SAFE-BFH-2, XLS-3Z,BHL-68W, ACI-97, ASF-67, LGA-3J) and 114 bbl HCL in a 60 stage frac with 8317333 lbs of silica quartz proppant
Total fluid used in treatment (bbls):385761Max pressure during treatment (psi):8995
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:60
Total acid used in treatment (bbls):114Min frac gradient (psi/ft):0.85
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):26132
Fresh water used in treatment (bbls):385647Disposition method For flowback:DISPOSAL
Total proppant used (lbs):8317333Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8119 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/23/2019Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 904
BBLS_OIL 552
BTU_GAS 1289
CALC_BBLS_H2O 904
CALC_BBLS_OIL 552
CALC_GOR 2400
CALC_MCF_GAS 1325
CASING_PRESS 2650
GRAVITY_OIL 42
MCF_GAS 1325
TUBING_PRESS 2150
Perforation Data:
Interval Top:8177 ft.# Of Holes:1418
Interval Bottom:17788 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
September 2023 - August 2024i
Total Oil Produced (Barrels)5999
Total Gas Produced (MCF)18909
GOR3152
GOR DeterminationBOE
Average BOE per Day25.278
Average MCFE per Day146.617

 Federal Financial Assurance  i 

 Tribal Well  i No