Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-47592
Well Classification: OW Status: PR - 1/1/2021
Well Name/No:70 Ranch #10-4-4L
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CONFLUENCE DJ LLC - 10518
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/1/2021
FacilityID:456636LocationID:454560
County:WELD #123Location:SWSW 3 4N63W 6
Field:DJ HORIZONTAL CODELL - #16948Elevation:4598 ft.
Planned Location:260FSL  1286 FWLLat/Long: 40.334770 / -104.429230Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.334770 / -104.429230Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/13/2019
End Date: 9/28/2019
Reported: 11/4/2019
Days to report: 37
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 1/1/2021             Measured TD: 16676 ft.    Vertical TD: 6534 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 1/1/2021
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:8/15/2020
Prop Depth/Form:16623 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-2308 , Unit Acreage: 640, Drill Unit: Sec 10 & 15:W/2
Formation And Spacing:Code: FTHYS , Formation: FORT HAYS , Order: 407-2308 , Unit Acreage: 640, Drill Unit: SEC. 10 & 15: W/2
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 43 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 787, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 16623 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2234, Top: , Bottom: 16623 ft.

Wellbore Completed
Completion Date:6/23/2019
Spud Date:5/26/2019Spud Date Is:ACTUAL
Measured TD:16676 ft.Measured PB depth:16663 ft.
True Vertical TD:6534 ft.True Vertical PB depth:6534 ft.
Top PZ Location:Sec:10 Twp: 4N 63WFootage: 469 FNL  2249 FWLDepth
Bottom Hole Location:Sec:15 Twp: 4N 63WFootage: 471 FSL  2245 FWLDepth
Log Types:CBL, Mud Log, MWD/LWD, RES on API 05-123-46619
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 43 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1574 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 480, Top: 0 ft., Bottom: 1582 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16667 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2005, Top: 4690 ft., Bottom: 16676 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3371 ft.NN
SUSSEX4032 ft.NN
SHANNON4965 ft.NN
SHARON SPRINGS6236 ft.NN
NIOBRARA6388 ft.NN
FORT HAYS6725 ft.NN
CODELL6958 ft.NN

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 6/25/2020                 Interval Top: 15053 ft.    Interval Bottom: 15192 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:2/15/2020Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/13/2019Treatment End Date:9/28/2019
Treatment Summary:Completed Ft. Hays from 15053' to 15192' MD
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:15053 ft.# Of Holes:32
Interval Bottom:15192 ft.Hole Size:0.32 in.

Formation CD-FH                   Formation Classification:  OW                   Status:  PR - 2/14/2020                 Interval Top: 7001 ft.    Interval Bottom: 16641 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:2/15/2020Choke Size:0.000 in.
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/13/2019Treatment End Date:9/28/2019
Treatment Summary:Perf Codell from 7001' to 15053' and 15192' to 16641' MD Perf Ft Hays from 15053' to 15192' MD Frac Codell and Ft. Hays with 9,375,464 gallons of FR Water (FightR EC-1), 909,489 gallons of Treated Water, 34,874 gallons of HCl, 38,740 pounds of 100 Mesh, and 15,619,980 pounds of 30/50
Total fluid used in treatment (bbls):244880Max pressure during treatment (psi):9581
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:60
Total acid used in treatment (bbls):830Min frac gradient (psi/ft):0.86
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):35463
Fresh water used in treatment (bbls):223225Disposition method For flowback:DISPOSAL
Total proppant used (lbs):15658720Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6353 ft.
Tubing Packer Depth:6360 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/14/2020Test Method:Flowing
Hours Tested:1Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 16
BBLS_OIL 20
BTU_GAS 1301
CALC_BBLS_H2O 384
CALC_BBLS_OIL 480
CALC_GOR 955
CALC_MCF_GAS 458
GRAVITY_OIL 43
MCF_GAS 19
TUBING_PRESS 1040
Perforation Data:
Interval Top:7001 ft.# Of Holes:1920
Interval Bottom:16641 ft.Hole Size:0.32 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 6/25/2020                 Interval Top: 7001 ft.    Interval Bottom: 16641 ft.

 Completed Information for Formation CODELL
1st Production Date:2/15/2020Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/13/2019Treatment End Date:9/28/2019
Treatment Summary:Completed Codell from 7001' to 15053' MD and 15192' to 16641' MD
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7001 ft.# Of Holes:1728
Interval Bottom:16641 ft.Hole Size:0.32 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
September 2023 - August 2024i
Total Oil Produced (Barrels)10798
Total Gas Produced (MCF)99731
GOR9236
GOR DeterminationBOE
Average BOE per Day76.445
Average MCFE per Day443.395

 Federal Financial Assurance  i 

 Tribal Well  i No