Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-47462
Well Classification: OW Status: PR - 8/31/2024
Well Name/No:Flaherty #13-14-3
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:BAYSWATER EXPLORATION & PRODUCTION LLC - 10261
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/31/2024
FacilityID:456245LocationID:442024
County:WELD #123Location:SESW 18 4N62W 6
Field:WATTENBERG - #90750Elevation:4563 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:295FSL  1784 FWLLat/Long: 40.305990 / -104.370150Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.305990 / -104.370150Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/29/2024
End Date: 5/6/2024
Reported: 7/8/2024
Days to report: 63
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/31/2024             Measured TD: 11490 ft.    Vertical TD: 6371 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/31/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/7/2025
Proposed Top PZ Location:Sec:13 Twp: 4N 63W Footage: 495 FSL  470 FEL
Bottom Hole Location:Sec:13 Twp: 4N 63W Footage: 495 FSL  470 FWL
Proposed Depth/Form:11435 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-2372 , Unit Acreage: 640, Drill Unit: T4N R63W Sec. 13: Al
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 43 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1650 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 674, Top: 0 ft., Bottom: 1650 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 11435 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1002, Top: , Bottom: 11435 ft.

Wellbore Completed
Completion Date:7/11/2022
Spud Date:6/25/2022Spud Date Is:ACTUAL
Measured TD:11490 ft.Measured PB depth:11466 ft.
True Vertical TD:6371 ft.True Vertical PB depth:6371 ft.
Top PZ Location:Sec:13 Twp: 4N 63WFootage: 516 FSL  470 FEL
Bottom Hole Location:Sec:13 Twp: 4N 63WFootage: 492 FSL  462 FWL
Log Types:GR/RES on 05-123-47444. CBL, MWD, Mud Log (GR/RES in API 123-47444)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 43 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1713 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 638, Top: 0 ft., Bottom: 1723 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 11480 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1335, Top: 1675 ft., Bottom: 11490 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PIERRE1577 ft.3560 ft.NN
PARKMAN3560 ft.4188 ft.NN
SUSSEX4188 ft.4836 ft.NN
SHANNON4836 ft.6138 ft.NN
SHARON SPRINGS6138 ft.6530 ft.NN
NIOBRARA6530 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 8/31/2024                 Interval Top: 7062 ft.    Interval Bottom: 11422 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/31/2024Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:4/29/2024Treatment End Date:5/6/2024
Treatment Summary:222887 bbls total; 6708040 # sand total(64180 200/mesh 720224 100/mesh 40/70 5923636 30/50); 42336 gals HCL
Total fluid used in treatment (bbls):222888Max pressure during treatment (psi):8916
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:22
Total acid used in treatment (bbls):1008Min frac gradient (psi/ft):1.10
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):1357
Fresh water used in treatment (bbls):221880Disposition method For flowback:DISPOSAL
Total proppant used (lbs):6708040Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6635 ft.
Tubing Packer Depth:6644 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/31/2024Test Method:Flowing
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 512
BBLS_OIL 189
BTU_GAS 1405
CALC_BBLS_H2O 512
CALC_BBLS_OIL 189
CALC_GOR 794
CALC_MCF_GAS 150
GRAVITY_OIL 41
MCF_GAS 150
TUBING_PRESS 1017
Perforation Data:
Interval Top:7062 ft.# Of Holes:594
Interval Bottom:11422 ft.Hole Size:0.433 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)32845
Total Gas Produced (MCF)105650
GOR3216
GOR DeterminationBOE
Average BOE per Day140.324
Average MCFE per Day813.895

 Federal Financial Assurance  i 

 Tribal Well  i No