Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-47439
Well Classification: OW Status: PR - 8/23/2024
Well Name/No:Flaherty #13-8-3
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:BAYSWATER EXPLORATION & PRODUCTION LLC - 10261
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/23/2024
FacilityID:456222LocationID:442024
County:WELD #123Location:SESW 18 4N62W 6
Field:WATTENBERG - #90750Elevation:4563 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:413FSL  1693 FWLLat/Long: 40.306310 / -104.370480Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.306310 / -104.370480Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/19/2024
End Date: 4/28/2024
Reported: 7/8/2024
Days to report: 71
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/23/2024             Measured TD: 11888 ft.    Vertical TD: 6385 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/23/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/7/2025
Proposed Top PZ Location:Sec:13 Twp: 4N 63W Footage: 2577 FSL  470 FEL
Bottom Hole Location:Sec:13 Twp: 4N 63W Footage: 2577 FSL  470 FWL
Proposed Depth/Form:11805 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-2372 , Unit Acreage: 640, Drill Unit: T4N R63W Sec. 13: Al
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 43 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1650 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 674, Top: 0 ft., Bottom: 1650 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 11805 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1057, Top: , Bottom: 11805 ft.

Wellbore Completed
Completion Date:8/10/2022
Spud Date:6/19/2022Spud Date Is:ACTUAL
Measured TD:11888 ft.Measured PB depth:11849 ft.
True Vertical TD:6385 ft.True Vertical PB depth:6385 ft.
Top PZ Location:Sec:13 Twp: 4N 63WFootage: 2574 FSL  482 FEL
Bottom Hole Location:Sec:13 Twp: 4N 63WFootage: 2577 FSL  409 FWL
Log Types:GR/RES on 05-123-47444. CBL, MWD, Mud Log.
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 43 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1719 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 638, Top: 0 ft., Bottom: 1730 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 11876 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1395, Top: 2146 ft., Bottom: 11888 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PIERRE1544 ft.NN
PARKMAN3605 ft.NN
SUSSEX4252 ft.NN
SHANNON5057 ft.NN
SHARON SPRINGS6723 ft.NN
NIOBRARA6876 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 8/23/2024                 Interval Top: 7431 ft.    Interval Bottom: 11791 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/23/2024Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:4/19/2024Treatment End Date:4/28/2024
Treatment Summary:209575 bbls total; 6749832 # sand total(0 200/mesh 703448 100/mesh 40/70 6046384 30/50); 33936 gals HCL
Total fluid used in treatment (bbls):209575Max pressure during treatment (psi):9138
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:22
Total acid used in treatment (bbls):808Min frac gradient (psi/ft):1.04
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):467
Fresh water used in treatment (bbls):208767Disposition method For flowback:DISPOSAL
Total proppant used (lbs):6749832Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7000 ft.
Tubing Packer Depth:7008 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/23/2024Test Method:Flowing
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 275
BBLS_OIL 191
BTU_GAS 1405
CALC_BBLS_H2O 275
CALC_BBLS_OIL 191
CALC_GOR 749
CALC_MCF_GAS 143
GRAVITY_OIL 41
MCF_GAS 143
TUBING_PRESS 730
Perforation Data:
Interval Top:7431 ft.# Of Holes:594
Interval Bottom:11791 ft.Hole Size:0.433 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)30325
Total Gas Produced (MCF)119695
GOR3947
GOR DeterminationBOE
Average BOE per Day139.959
Average MCFE per Day811.748

 Federal Financial Assurance  i 

 Tribal Well  i No