Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-47382
Well Classification: OW Status: PR - 4/1/2025
Well Name/No:Postle IC #09-142HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/1/2025
FacilityID:456141LocationID:433857
Municipality/County:MEAD / WELD #123Location:SWNW 11 3N68W 6
Field:WATTENBERG - #90750Elevation:4977 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1452FNL  611 FWLLat/Long: 40.243989 / -104.977594Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.243989 / -104.977596Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/2/2020
End Date: 12/8/2020
Reported: 12/22/2020
Days to report: 14
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 4/1/2025             Measured TD: 18341 ft.    Vertical TD: 7241 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 4/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:7/21/2020
Proposed Top PZ Location:Sec:11 Twp: 3N 68W Footage: 1875 FNL  310 FWL
Bottom Hole Location:Sec:9 Twp: 3N 68W Footage: 1887 FNL  370 FWL
Proposed Depth/Form:18246 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 1440, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 624, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18246 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2361, Top: , Bottom: 18246 ft.

Wellbore Completed
Completion Date:5/12/2020
Spud Date:2/2/2020Spud Date Is:ACTUAL
Measured TD:18341 ft.Measured PB depth:18324 ft.
True Vertical TD:7241 ft.True Vertical PB depth:7240 ft.
Top PZ Location:Sec:11 Twp: 3N 68WFootage: 1875 FNL  310 FWL
Bottom Hole Location:Sec:9 Twp: 3N 68WFootage: 1884 FNL  286 FWL
Log Types:Mud log, Composite, MWD/LWD, CBL, (IND/GR in 123-39322)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1552 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 710, Top: 0 ft., Bottom: 1552 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18341 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2560, Top: 1634 ft., Bottom: 18341 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3654 ft.3700 ft.NN
SUSSEX4111 ft.4254 ft.NN
SHANNON4625 ft.4656 ft.NN
SHARON SPRINGS7031 ft.NN
NIOBRARA7126 ft.NN
FORT HAYS7586 ft.NN
CODELL7715 ft.NN
CARLILE9856 ft.NN

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 10/3/2024                 Interval Top: 14481 ft.    Interval Bottom: 18101 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:1/22/2021Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/3/2024Treatment End Date:N/A
Treatment Summary:Fort Hays Perf Interval; 14481' - 14940'; 17918' - 18101'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:14481 ft.# Of Holes:414
Interval Bottom:18101 ft.Hole Size:0.34 in.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 10/3/2024                 Interval Top: 9856 ft.    Interval Bottom: 15540 ft.

 Completed Information for Formation CARLILE
1st Production Date:1/22/2021Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/3/2024Treatment End Date:N/A
Treatment Summary:Carlile Perf Interval; 9856' - 10144'; 10968' - 10981'; 15350' - 15540'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:9856 ft.# Of Holes:414
Interval Bottom:15540 ft.Hole Size:0.34 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 4/1/2025                  Interval Top: 7799 ft.    Interval Bottom: 18101 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:1/22/2021Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:12/2/2020Treatment End Date:12/8/2020
Treatment Summary:24 bbls 15% HCL Acid; 621,620# 100 Mesh Sand; 7,137,346 # 20/40 Sand; 156,781 bbls Gelled Fluid; Flowback determined from well test separator
Total fluid used in treatment (bbls):156805Max pressure during treatment (psi):4409
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:30
Total acid used in treatment (bbls):24Min frac gradient (psi/ft):0.94
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):37901
Fresh water used in treatment (bbls):156781Disposition method For flowback:DISPOSAL
Total proppant used (lbs):7758966Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7204 ft.
Tubing Packer Depth:7186 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/24/2021Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 506
BBLS_OIL 383
BTU_GAS 1352
CALC_BBLS_H2O 506
CALC_BBLS_OIL 383
CALC_GOR 1697
CALC_MCF_GAS 650
CASING_PRESS 1
GRAVITY_OIL 46
MCF_GAS 650
TUBING_PRESS 1616
Perforation Data:
Interval Top:7799 ft.# Of Holes:414
Interval Bottom:18101 ft.Hole Size:0.34 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 10/3/2024                 Interval Top: 7799 ft.    Interval Bottom: 17917 ft.

 Completed Information for Formation CODELL
1st Production Date:1/22/2021Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/3/2024Treatment End Date:N/A
Treatment Summary:Codell Perf Interval; 7799' - 9855'; 10145' - 10967'; 10982' - 14480'; 14941' - 15349'; 15541' - 17917'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7799 ft.# Of Holes:414
Interval Bottom:17917 ft.Hole Size:0.34 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)15
Total Gas Produced (MCF)461
GOR30733
GOR DeterminationMCFE
Average BOE per Day0.259
Average MCFE per Day1.498

 Federal Financial Assurance  i 

 Tribal Well  i No