Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-46617
Well Classification: OW Status: PR - 1/1/2019
Well Name/No:70 Ranch #10-8-4L
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CONFLUENCE DJ LLC - 10518
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/1/2019
FacilityID:454561LocationID:454560
County:WELD #123Location:SWSW 3 4N63W 6
Field:DJ HORIZONTAL CODELL - #16948Elevation:4592 ft.
Planned Location:260FSL  1037 FWLLat/Long: 40.334730 / -104.430120Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.334730 / -104.430120Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/27/2018
End Date: 1/8/2019
Reported: 1/25/2019
Days to report: 17
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 11/1/2019             Measured TD: 16585 ft.    Vertical TD: 6529 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 11/1/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:8/15/2020
Prop Depth/Form:16512 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-2308 , Unit Acreage: 640, Drill Unit: Sec 10 & 15:W/2
Formation And Spacing:Code: FTHYS , Formation: FORT HAYS , Order: 407-2308 , Unit Acreage: 640, Drill Unit: SEC 10 & 15: W/2
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 43 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 787, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16512 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2217, Top: , Bottom: 16512 ft.

Wellbore Completed
Completion Date:10/17/2018
Spud Date:9/30/2018Spud Date Is:ACTUAL
Measured TD:16585 ft.Measured PB depth:16558 ft.
True Vertical TD:6529 ft.True Vertical PB depth:6529 ft.
Top PZ Location:Sec:10 Twp: 4N 63WFootage: 482 FNL  480 FWLDepth
Bottom Hole Location:Sec:15 Twp: 4N 63WFootage: 512 FSL  515 FWLDepth
Log Types:CBL, Mud, MWD, GR on API 05-123-46619
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 43 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1534 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 575, Top: 0 ft., Bottom: 1544 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16577 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1985, Top: 1580 ft., Bottom: 16585 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3379 ft.
SUSSEX4068 ft.
SHARON SPRINGS6180 ft.
NIOBRARA6330 ft.
FORT HAYS6647 ft.
CODELL6836 ft.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 10/18/2019                Interval Top: 8674 ft.    Interval Bottom: 16487 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:3/26/2019Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/27/2018Treatment End Date:1/8/2019
Treatment Summary:8,674'-9,132'; 11,409'-12,187'; 14,749'-14,887'; 16,029'-16,487'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8674 ft.# Of Holes:384
Interval Bottom:16487 ft.Hole Size:0.32 in.

Formation CD-FH                   Formation Classification:  OW                   Status:  PR - 1/1/2020                  Interval Top: 6909 ft.    Interval Bottom: 16487 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:3/26/2019Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/27/2018Treatment End Date:1/8/2019
Treatment Summary:Codell: 6,909'-8,652'; 9,154'-11,387'; 12,209'-14,727'; 14,909'-16,007'. Ft. Hays: 8,674'-9,132'; 11,409'-12,187'; 14,749'-14,887'; 16,029'-16,487'. 60 Stages, 16,744,190 total lbs sand & 266,709 bbls fluid. Ave Rate 63.6 bpm, Ave PSI 5,314, Max PSI 6,525.
Total fluid used in treatment (bbls):266709Max pressure during treatment (psi):7768
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:60
Total acid used in treatment (bbls):172Min frac gradient (psi/ft):0.93
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):26140
Fresh water used in treatment (bbls):266537Disposition method For flowback:DISPOSAL
Total proppant used (lbs):16744190Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6145 ft.
Tubing Packer Depth:6145 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/25/2019Test Method:FLOWING
Hours Tested:1Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 12
BBLS_OIL 22
BTU_GAS 1513
CALC_BBLS_H2O 283
CALC_BBLS_OIL 526
CALC_GOR 954
CALC_MCF_GAS 494
GRAVITY_OIL 43
MCF_GAS 21
TUBING_PRESS 1254
Perforation Data:
Interval Top:6909 ft.# Of Holes:1920
Interval Bottom:16487 ft.Hole Size:0.32 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 10/18/2019                Interval Top: 6909 ft.    Interval Bottom: 16007 ft.

 Completed Information for Formation CODELL
1st Production Date:3/26/2019Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/27/2018Treatment End Date:1/8/2019
Treatment Summary:6,909'-8,652'; 9,154'-11,387'; 12,209'-14,727'; 14,909'-16,007'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:6909 ft.# Of Holes:1536
Interval Bottom:16007 ft.Hole Size:0.32 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
September 2023 - August 2024i
Total Oil Produced (Barrels)21830
Total Gas Produced (MCF)126718
GOR5804
GOR DeterminationBOE
Average BOE per Day119.346
Average MCFE per Day692.202

 Federal Financial Assurance  i 

 Tribal Well  i No