Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-46614
Well Classification: OW Status: PR - 1/1/2021
Well Name/No:70 Ranch #10-5-4L
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CONFLUENCE DJ LLC - 10518
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/1/2021
FacilityID:454557LocationID:454560
County:WELD #123Location:SWSW 3 4N63W 6
Field:DJ HORIZONTAL CODELL - #16948Elevation:4595 ft.
Planned Location:260FSL  1162 FWLLat/Long: 40.334750 / -104.429670Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.334750 / -104.429670Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/13/2019
End Date: 9/28/2019
Reported: 11/4/2019
Days to report: 37
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 1/1/2021             Measured TD: 16665 ft.    Vertical TD: 6525 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 1/1/2021
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:8/15/2020
Prop Depth/Form:16501 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-2308 , Unit Acreage: 640, Drill Unit: Sec 10 & 15:W/2
Formation And Spacing:Code: FTHYS , Formation: FORT HAYS , Order: 407-2308 , Unit Acreage: 640, Drill Unit: SEC. 10 & 15: W/2
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 43 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 787, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 16501 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2216, Top: , Bottom: 16501 ft.

Wellbore Completed
Completion Date:7/29/2019
Spud Date:5/31/2019Spud Date Is:ACTUAL
Measured TD:16665 ft.Measured PB depth:16608 ft.
True Vertical TD:6525 ft.True Vertical PB depth:6525 ft.
Top PZ Location:Sec:10 Twp: 4N 63WFootage: 470 FNL  1371 FWLDepth
Bottom Hole Location:Sec:15 Twp: 4N 63WFootage: 366 FSL  1365 FWLDepth
Log Types:CBL, Mud Log, MWD/LWD, Res on API 05-123-46619
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 43 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1553 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 480, Top: 0 ft., Bottom: 1562 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16654 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1969, Top: 3035 ft., Bottom: 16665 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3337 ft.NN
SUSSEX4042 ft.NN
SHANNON4867 ft.NN
SHARON SPRINGS6170 ft.NN
NIOBRARA6354 ft.NN
FORT HAYS6684 ft.NN
CODELL6785 ft.NN

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 6/23/2020                 Interval Top: 8367 ft.    Interval Bottom: 11076 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:2/15/2020Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/13/2019Treatment End Date:9/28/2019
Treatment Summary:Completed Ft. Hays from 8367' to 8664' and 10456' to 11076' MD
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8367 ft.# Of Holes:192
Interval Bottom:11076 ft.Hole Size:0.32 in.

Formation CD-FH                   Formation Classification:  OW                   Status:  PR - 2/14/2020                 Interval Top: 6913 ft.    Interval Bottom: 16542 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:2/15/2020Choke Size:0.000 in.
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/13/2019Treatment End Date:9/28/2019
Treatment Summary:Perf Codell from 6913' to 8367'; 8664' to 10456'; 11076' to 16542' MD Perf Ft. Hays from 8367' to 8664' and 10456' to 11076' MD Frac Codell with 9,289,034 gallons of FR Water (FightR EC-1), 801,956 gallons of Treated Water, 25,427 gallons of HCl, 16,319,400 pounds of 30/50
Total fluid used in treatment (bbls):240262Max pressure during treatment (psi):9202
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:60
Total acid used in treatment (bbls):605Min frac gradient (psi/ft):0.97
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):41908
Fresh water used in treatment (bbls):221167Disposition method For flowback:DISPOSAL
Total proppant used (lbs):16319400Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6257 ft.
Tubing Packer Depth:6265 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/14/2020Test Method:Flowing
Hours Tested:1Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 17
BBLS_OIL 20
BTU_GAS 1301
CALC_BBLS_H2O 408
CALC_BBLS_OIL 480
CALC_GOR 940
CALC_MCF_GAS 451
GRAVITY_OIL 43
MCF_GAS 19
TUBING_PRESS 880
Perforation Data:
Interval Top:6913 ft.# Of Holes:1920
Interval Bottom:16542 ft.Hole Size:0.32 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 6/23/2020                 Interval Top: 6913 ft.    Interval Bottom: 16542 ft.

 Completed Information for Formation CODELL
1st Production Date:2/15/2020Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/13/2019Treatment End Date:9/28/2019
Treatment Summary:Completed Codell from 6913' to 8367'; 8664' to 10456'; 11076' to 16542' MD
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:6913 ft.# Of Holes:1888
Interval Bottom:16542 ft.Hole Size:0.32 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
September 2023 - August 2024i
Total Oil Produced (Barrels)8684
Total Gas Produced (MCF)93767
GOR10797
GOR DeterminationBOE
Average BOE per Day67.910
Average MCFE per Day393.886

 Federal Financial Assurance  i 

 Tribal Well  i No