Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-46595
Well Classification: OW Status: PR - 4/25/2024
Well Name/No:Boyd 2413 #05H
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:VERDAD RESOURCES LLC - 10651
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/25/2024
FacilityID:454527LocationID:454529
County:WELD #123Location:NESW 24 2N64W 6
Field:WATTENBERG - #90750Elevation:4924 ft.
Planned Location:1441FSL  2291 FWLLat/Long: 40.120602 / -104.500941Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/29/2024
End Date: 3/8/2024
Reported: 4/16/2024
Days to report: 39
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 4/25/2024             Measured TD: 17348 ft.    Vertical TD: 6999 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 4/25/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/10/2025
Proposed Top PZ Location:Sec:24 Twp: 2N 64W Footage: 460 FSL  1695 FWL
Bottom Hole Location:Sec:13 Twp: 2N 64W Footage: 370 FNL  1695 FWL
Proposed Depth/Form:17119 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-1192 , Unit Acreage: 1280, Drill Unit: 2N64W Sec. 24&13: AL
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 65 , Citings Type: PLANNED
Cement:Sacks: 70, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1979 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 939, Top: 0 ft., Bottom: 1979 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17380 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2179, Top: 0 ft., Bottom: 17380 ft.

Wellbore Completed
Completion Date:12/16/2023
Spud Date:5/30/2022Spud Date Is:ACTUAL
Measured TD:17348 ft.Measured PB depth:17257 ft.
True Vertical TD:6999 ft.True Vertical PB depth:6999 ft.
Top PZ Location:Sec:24 Twp: 2N 64WFootage: 490 FSL  1699 FWL
Bottom Hole Location:Sec:13 Twp: 2N 64WFootage: 356 N  1746 W
Log Types:
Log Types:MWD/LWD, (CBL, Res in API 05-123-46833)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: 70, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1979 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 939, Top: 0 ft., Bottom: 1979 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17348 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2435, Top: 280 ft., Bottom: 17348 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FOX HILLS0 ft.928 ft.
PARKMAN4153 ft.
SUSSEX4353 ft.
SHANNON5257 ft.
SHARON SPRINGS6940 ft.
NIOBRARA6976 ft.
FORT HAYS7461 ft.
CODELL7782 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 2/28/2025                 Interval Top: 7782 ft.    Interval Bottom: 17168 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:2/28/2025Treatment End Date:N/A
Treatment Summary:Perfs 7782-17168
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7782 ft.# Of Holes:1518
Interval Bottom:17168 ft.Hole Size:0.35 in.

Formation CD-FH                   Formation Classification:  OW                   Status:  PR - 4/25/2024                 Interval Top: 7644 ft.    Interval Bottom: 17168 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:4/23/2024Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:2/29/2024Treatment End Date:3/8/2024
Treatment Summary:FR Water 453,035 bbl, Treated Water 20,955 bbl, Fresh Water 2,431 bbl, Recycled Water 24,519 bbl(21,039,493 gals), 28% HCL 890 bbl. Proppant:100 Mesh 3,358,090 lbs, 40/70 white sand: 16,568,247 lbs. Flowback is measured by strapping a flowback tank every hour during initial flowback and from tank gauges during permanent facility flowback.
Total fluid used in treatment (bbls):501830Max pressure during treatment (psi):11294
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:46
Total acid used in treatment (bbls):890Min frac gradient (psi/ft):0.89
Recycled water used in treatment (bbls):24519Total flowback volume recovered (bbls):19897
Fresh water used in treatment (bbls):476421Disposition method For flowback:DISPOSAL
Total proppant used (lbs):19926337Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/25/2024Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 910
BBLS_OIL 81
BTU_GAS 1583
CALC_BBLS_H2O 910
CALC_BBLS_OIL 81
CALC_GOR 1025
CALC_MCF_GAS 83
CASING_PRESS 840
GRAVITY_OIL 39
MCF_GAS 83
Perforation Data:
Interval Top:7644 ft.# Of Holes:1518
Interval Bottom:17168 ft.Hole Size:0.35 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 2/28/2025                 Interval Top: 7644 ft.    Interval Bottom: 7781 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:2/28/2025Treatment End Date:N/A
Treatment Summary:Perf 7644-7781
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:7644 ft.# Of Holes:1518
Interval Bottom:7781 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)91164
Total Gas Produced (MCF)50555
GOR554
GOR DeterminationBOE
Average BOE per Day272.163
Average MCFE per Day1578.534

 Federal Financial Assurance  i 

 Tribal Well  i No