Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-46571
Well Classification: OW Status: PR - 10/18/2018
Well Name/No:Ruegge #3N-4H-N165
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/18/2018
FacilityID:454452LocationID:331527
County:WELD #123Location:SESW 4 1N65W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:4915 ft.
Planned Location:711FSL  2166 FWLLat/Long: 40.075269 / -104.670668Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.075260 / -104.670662Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/16/2018
End Date: 9/25/2018
Reported: 6/7/2019
Originally Reported: 3/20/2019
Days to report: 255
Days to report: 176
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 10/18/2018             Measured TD: 12160 ft.    Vertical TD: 7099 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 10/18/2018
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/20/2020
Proposed Top PZ Location:Sec:4 Twp: 1N 65W Footage: 453 FSL  1391 FWL
Bottom Hole Location:Sec:4 Twp: 1N 65W Footage: 466 FNL  1370 FWL
Proposed Depth/Form:12209 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-2290  , Unit Acreage: 640, Drill Unit: Sec 4: All
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 98 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 78, Top: 0 ft., Bottom: 98 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2483 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 953, Top: 0 ft., Bottom: 2483 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12209 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1657, Top: , Bottom: 12209 ft.

Wellbore Completed
Completion Date:7/14/2018
Spud Date:5/12/2018Spud Date Is:ACTUAL
Measured TD:12160 ft.Measured PB depth:12132 ft.
True Vertical TD:7099 ft.True Vertical PB depth:7100 ft.
Top PZ Location:Sec:4 Twp: 1N 65WFootage: 453 FSL  1391 FWL
Bottom Hole Location:Sec:4 Twp: 1N 65WFootage: 466 N  1370 W
Log Types:MUD, MWD/LWD, CBL (DIL in 123-20848)
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 121 ft., Weight: 42.09 , Citings Type: ACTUAL
Cement:Sacks: 72, Top: 0 ft., Bottom: 121 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2494 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 960, Top: 0 ft., Bottom: 2505 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12145 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1604, Top: 2613 ft., Bottom: 12160 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4573 ft.NN
SHANNON5376 ft.NN
TEEPEE BUTTES6488 ft.NN
SHARON SPRINGS7253 ft.NN
NIOBRARA7287 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 10/18/2018                Interval Top: 7770 ft.    Interval Bottom: 12120 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:11/9/2018Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/16/2018Treatment End Date:9/25/2018
Treatment Summary:167641 bbls of water, 167 bbls of additives (FRP-4CS, ACI-97, ASF-67) and 194 bbl HCL in a 28 stage frac with 3658350 lbs of silica quartz proppant
Total fluid used in treatment (bbls):168002Max pressure during treatment (psi):9487
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:28
Total acid used in treatment (bbls):194Min frac gradient (psi/ft):0.96
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):8856
Fresh water used in treatment (bbls):167808Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3658350Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7390 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/18/2018Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 444
BBLS_OIL 522
BTU_GAS 1284
CALC_BBLS_H2O 444
CALC_BBLS_OIL 522
CALC_GOR 1040
CALC_MCF_GAS 543
CASING_PRESS 1900
GRAVITY_OIL 43
MCF_GAS 543
TUBING_PRESS 800
Perforation Data:
Interval Top:7770 ft.# Of Holes:644
Interval Bottom:12120 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)2504
Total Gas Produced (MCF)51486
GOR20561
GOR DeterminationMCFE
Average BOE per Day31.104
Average MCFE per Day180.420

 Federal Financial Assurance  i 

 Tribal Well  i No