Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-46562
Well Classification: OW Status: PR - 11/1/2018
Well Name/No:Ruegge #3J-4H-N165
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/1/2018
FacilityID:454443LocationID:331527
County:WELD #123Location:SESW 4 1N65W 6
Field:DJ HORIZONTAL CODELL - #16948Elevation:4915 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:705FSL  2126 FWLLat/Long: 40.075253 / -104.670809Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.075244 / -104.670805Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/27/2018
End Date: 9/1/2018
Reported: 6/7/2019
Originally Reported: 3/20/2019
Days to report: 279
Days to report: 200
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 11/1/2018             Measured TD: 12064 ft.    Vertical TD: 7290 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 11/1/2018
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/20/2020
Proposed Top PZ Location:Sec:4 Twp: 1N 65W Footage: 460 FSL  2293 FWL
Bottom Hole Location:Sec:4 Twp: 1N 65W Footage: 464 FNL  2305 FWL
Proposed Depth/Form:12188 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CD-FH , Formation: CODELL-FORT HAYS , Order: 407-2290 , Unit Acreage: 640, Drill Unit: Sec 4: All
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 98 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 78, Top: 0 ft., Bottom: 98 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2424 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 932, Top: 0 ft., Bottom: 2424 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12188 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1654, Top: , Bottom: 12188 ft.

Wellbore Completed
Completion Date:6/28/2018
Spud Date:5/7/2018Spud Date Is:ACTUAL
Measured TD:12064 ft.Measured PB depth:12026 ft.
True Vertical TD:7290 ft.True Vertical PB depth:7290 ft.
Top PZ Location:Sec:4 Twp: 1N 65WFootage: 460 FSL  2293 FWL
Bottom Hole Location:Sec:4 Twp: 1N 65WFootage: 464 FNL  2305 FWL
Log Types:MUD, MWD/LWD, CBL (DIL in 123-20848)
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 121 ft., Weight: 42.09 , Citings Type: ACTUAL
Cement:Sacks: 72, Top: 0 ft., Bottom: 121 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2431 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 900, Top: 0 ft., Bottom: 2466 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12051 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1598, Top: 2357 ft., Bottom: 12064 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4476 ft.NN
SHANNON5235 ft.NN
TEEPEE BUTTES6327 ft.NN
SHARON SPRINGS6997 ft.NN
NIOBRARA7026 ft.NN
FORT HAYS7540 ft.NN
CODELL7586 ft.NN

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 6/23/2020                 Interval Top: 8696 ft.    Interval Bottom: 9256 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:6/23/2020Treatment End Date:N/A
Treatment Summary:8696'-9256'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8696 ft.# Of Holes:343
Interval Bottom:9256 ft.Hole Size:0.42 in.

Formation CD-FH                   Formation Classification:  OW                   Status:  PR - 10/27/2018                Interval Top: 7698 ft.    Interval Bottom: 12025 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:11/9/2018Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/27/2018Treatment End Date:9/1/2018
Treatment Summary:99868 bbls of water, 64 bbls of additives (FRP-4CS, ACI-97, ASF-67) and 6 bbl HCL in a 16 stage frac with 2619030 lbs of silica quartz proppant
Total fluid used in treatment (bbls):99938Max pressure during treatment (psi):8540
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:16
Total acid used in treatment (bbls):6Min frac gradient (psi/ft):0.88
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):7857
Fresh water used in treatment (bbls):99932Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2619030Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7354 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/27/2018Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 452
BBLS_OIL 346
BTU_GAS 1350
CALC_BBLS_H2O 452
CALC_BBLS_OIL 346
CALC_GOR 1347
CALC_MCF_GAS 466
CASING_PRESS 2200
GRAVITY_OIL 43
MCF_GAS 466
TUBING_PRESS 800
Perforation Data:
Interval Top:7698 ft.# Of Holes:343
Interval Bottom:12025 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 6/23/2020                 Interval Top: 7698 ft.    Interval Bottom: 12025 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:6/23/2020Treatment End Date:N/A
Treatment Summary:7698'-8695', 9257'-12025'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7698 ft.# Of Holes:343
Interval Bottom:12025 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)2235
Total Gas Produced (MCF)44216
GOR19783
GOR DeterminationMCFE
Average BOE per Day26.989
Average MCFE per Day156.544

 Federal Financial Assurance  i 

 Tribal Well  i No