Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-46562
Well Classification: OW Status: PR - 11/1/2018
Well Name/No:Ruegge #3J-4H-N165
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/1/2018
FacilityID:454443LocationID:331527
County:WELD #123Location:SESW 4 1N65W 6
Field:DJ HORIZONTAL CODELL - #16948Elevation:4915 ft.
Planned Location:705FSL  2126 FWLLat/Long: 40.075253 / -104.670809Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.075244 / -104.670805Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/27/2018
End Date: 9/1/2018
Reported: 6/7/2019
Originally Reported: 3/20/2019
Days to report: 279
Days to report: 200
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 11/1/2018             Measured TD: 12064 ft.    Vertical TD: 7290 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 11/1/2018
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/20/2020
Proposed Top PZ Location:Sec:4 Twp: 1N 65W Footage: 460 FSL  2293 FWL
Bottom Hole Location:Sec:4 Twp: 1N 65W Footage: 464 FNL  2305 FWL
Proposed Depth/Form:12188 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CD-FH , Formation: CODELL-FORT HAYS , Order: 407-2290 , Unit Acreage: 640, Drill Unit: Sec 4: All
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 98 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 78, Top: 0 ft., Bottom: 98 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2424 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 932, Top: 0 ft., Bottom: 2424 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12188 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1654, Top: , Bottom: 12188 ft.

Wellbore Completed
Completion Date:6/28/2018
Spud Date:5/7/2018Spud Date Is:ACTUAL
Measured TD:12064 ft.Measured PB depth:12026 ft.
True Vertical TD:7290 ft.True Vertical PB depth:7290 ft.
Top PZ Location:Sec:4 Twp: 1N 65WFootage: 460 FSL  2293 FWL
Bottom Hole Location:Sec:4 Twp: 1N 65WFootage: 464 N  2305 W
Log Types:MUD, MWD/LWD, CBL (DIL in 123-20848)
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 121 ft., Weight: 42.09 , Citings Type: ACTUAL
Cement:Sacks: 72, Top: 0 ft., Bottom: 121 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2431 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 900, Top: 0 ft., Bottom: 2466 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12051 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1598, Top: 2357 ft., Bottom: 12064 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4476 ft.NN
SHANNON5235 ft.NN
TEEPEE BUTTES6327 ft.NN
SHARON SPRINGS6997 ft.NN
NIOBRARA7026 ft.NN
FORT HAYS7540 ft.NN
CODELL7586 ft.NN

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 6/23/2020                 Interval Top: 8696 ft.    Interval Bottom: 9256 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:6/23/2020Treatment End Date:N/A
Treatment Summary:8696'-9256'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8696 ft.# Of Holes:343
Interval Bottom:9256 ft.Hole Size:0.42 in.

Formation CD-FH                   Formation Classification:  OW                   Status:  PR - 10/27/2018                Interval Top: 7698 ft.    Interval Bottom: 12025 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:11/9/2018Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/27/2018Treatment End Date:9/1/2018
Treatment Summary:99868 bbls of water, 64 bbls of additives (FRP-4CS, ACI-97, ASF-67) and 6 bbl HCL in a 16 stage frac with 2619030 lbs of silica quartz proppant
Total fluid used in treatment (bbls):99938Max pressure during treatment (psi):8540
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:16
Total acid used in treatment (bbls):6Min frac gradient (psi/ft):0.88
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):7857
Fresh water used in treatment (bbls):99932Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2619030Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7354 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/27/2018Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 452
BBLS_OIL 346
BTU_GAS 1350
CALC_BBLS_H2O 452
CALC_BBLS_OIL 346
CALC_GOR 1347
CALC_MCF_GAS 466
CASING_PRESS 2200
GRAVITY_OIL 43
MCF_GAS 466
TUBING_PRESS 800
Perforation Data:
Interval Top:7698 ft.# Of Holes:343
Interval Bottom:12025 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 6/23/2020                 Interval Top: 7698 ft.    Interval Bottom: 12025 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:6/23/2020Treatment End Date:N/A
Treatment Summary:7698'-8695', 9257'-12025'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7698 ft.# Of Holes:343
Interval Bottom:12025 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)2967
Total Gas Produced (MCF)55086
GOR18566
GOR DeterminationMCFE
Average BOE per Day34.047
Average MCFE per Day197.479

 Federal Financial Assurance  i 

 Tribal Well  i No