Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-46503
Well Classification: OW Status: PR - 12/14/2018
Well Name/No:Davis #1P-9H-G266
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/14/2018
FacilityID:454354LocationID:428454
County:WELD #123Location:SWNE 9 2N66W 6
Field:WATTENBERG - #90750Elevation:4917 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2013FNL  1453 FELLat/Long: 40.154297 / -104.777999Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.154297 / -104.777999Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/28/2018
End Date: 11/8/2018
Reported: 6/13/2019
Originally Reported: 3/20/2019
Days to report: 217
Days to report: 132
Disclosure: Sidetrack #00
Start Date: 10/28/2018
End Date: 11/8/2018
Reported: 3/20/2019
Days to report: 132
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 12/14/2018             Measured TD: 15305 ft.    Vertical TD: 7402 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 12/14/2018
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/14/2020
Proposed Top PZ Location:Sec:9 Twp: 2N 66W Footage: 2174 FNL  1282 FWL
Bottom Hole Location:Sec:4 Twp: 2N 66W Footage: 469 FNL  1273 FWL
Proposed Depth/Form:15288 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 480, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 98 ft., Weight: 42.09 , Citings Type: PLANNED
Cement:Sacks: 78, Top: 0 ft., Bottom: 98 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2165 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 839, Top: 0 ft., Bottom: 2165 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 15288 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2124, Top: , Bottom: 15288 ft.

Wellbore Completed
Completion Date:7/6/2018
Spud Date:5/16/2018Spud Date Is:ACTUAL
Measured TD:15305 ft.Measured PB depth:15278 ft.
True Vertical TD:7402 ft.True Vertical PB depth:7401 ft.
Top PZ Location:Sec:9 Twp: 2N 66WFootage: 2174 FNL  1282 FWL
Bottom Hole Location:Sec:4 Twp: 2N 66WFootage: 469 FNL  1273 FWL
Log Types:MUD, MWD/LWD, CBL, (DIL in API 123-08926)
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 121 ft., Weight: 42.09 , Citings Type: ACTUAL
Cement:Sacks: 54, Top: 0 ft., Bottom: 121 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2183 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 850, Top: 0 ft., Bottom: 2183 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 15290 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1936, Top: 2352 ft., Bottom: 15305 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4715 ft.NN
SHANNON5383 ft.NN
TEEPEE BUTTES6740 ft.NN
SHARON SPRINGS7682 ft.NN
NIOBRARA7783 ft.NN
FORT HAYS8299 ft.NN
CODELL8371 ft.NN
CARLILE12099 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 5/22/2019                 Interval Top: 12132 ft.    Interval Bottom: 12450 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:5/22/2019Treatment End Date:N/A
Treatment Summary:Carlile: 12132' - 12450'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:12132 ft.# Of Holes:565
Interval Bottom:12450 ft.Hole Size:

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 5/22/2019                 Interval Top: 10615 ft.    Interval Bottom: 10868 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:5/22/2019Treatment End Date:N/A
Treatment Summary:Niobrara: 10615' - 10868'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:10615 ft.# Of Holes:565
Interval Bottom:10868 ft.Hole Size:

Formation CODL                     Formation Classification:  OW                     Status:  CM - 5/22/2019                 Interval Top: 8371 ft.    Interval Bottom: 15246 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:5/22/2019Treatment End Date:N/A
Treatment Summary:Codell: 8371' - 10026', 11141' - 12075', 12451 - 15246'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8371 ft.# Of Holes:565
Interval Bottom:15246 ft.Hole Size:

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 5/22/2019                 Interval Top: 8356 ft.    Interval Bottom: 11140 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:5/22/2019Treatment End Date:N/A
Treatment Summary:Ft Hays: 8356' - 8370', 10027' - 10614' 10689' - 11140
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8356 ft.# Of Holes:565
Interval Bottom:11140 ft.Hole Size:

Formation NFCC                     Formation Classification:  OW                     Status:  PR - 12/14/2018                Interval Top: 8356 ft.    Interval Bottom: 15246 ft.

 Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE
1st Production Date:1/18/2019Choke Size: 
Formation Name:NIOBRARA-FORT HAYS-CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/28/2018Treatment End Date:11/8/2018
Treatment Summary:173938 bbls of water, 253 bbls of additives (FRP-4CS, SAFE-BFH, XLS-3Z, BHL-68, ACI-97, ASF-67, LGA-3J) and 72 bbl HCL in a 25 stage frac with 4166590 lbs of silica quartz proppant
Total fluid used in treatment (bbls):174263Max pressure during treatment (psi):9171
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:25
Total acid used in treatment (bbls):72Min frac gradient (psi/ft):0.67
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):9408
Fresh water used in treatment (bbls):174191Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4166590Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8048 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/14/2018Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 289
BBLS_OIL 392
BTU_GAS 1315
CALC_BBLS_H2O 289
CALC_BBLS_OIL 392
CALC_GOR 2594
CALC_MCF_GAS 1017
CASING_PRESS 2100
GRAVITY_OIL 49
MCF_GAS 1017
TUBING_PRESS 1100
Perforation Data:
Interval Top:8356 ft.# Of Holes:565
Interval Bottom:15246 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)2546
Total Gas Produced (MCF)81520
GOR32018
GOR DeterminationMCFE
Average BOE per Day45.483
Average MCFE per Day263.805

 Federal Financial Assurance  i 

 Tribal Well  i No