Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-46494
Well Classification: OW Status: PR - 3/1/2024
Well Name/No:Jackson #33-6H
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:VERDAD RESOURCES LLC - 10651
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/1/2024
FacilityID:454342LocationID:454345
County:WELD #123Location:NWNW 33 2N64W 6
Field:WATTENBERG - #90750Elevation:5017 ft.
Planned Location:283FNL  1081 FWLLat/Long: 40.101456 / -104.561579Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.101458 / -104.561580Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/29/2018
End Date: 5/10/2018
Reported: 6/27/2018
Days to report: 48
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 3/1/2024             Measured TD: 12689 ft.    Vertical TD: 7069 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 3/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/14/2020
Proposed Top PZ Location:Sec:33 Twp: 2N 64W Footage: 30 FNL  1934 FWL
Bottom Hole Location:Sec:33 Twp: 2N 64W Footage: 22 FSL  1915 FWL
Proposed Depth/Form:12866 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 240, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 65 , Citings Type: PLANNED
Cement:Sacks: 70, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 462, Top: 0 ft., Bottom: 1700 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12866 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1682, Top: 0 ft., Bottom: 12866 ft.

Wellbore Completed
Completion Date:4/3/2018
Spud Date:3/29/2018Spud Date Is:ACTUAL
Measured TD:12689 ft.Measured PB depth:12577 ft.
True Vertical TD:7069 ft.True Vertical PB depth:7067 ft.
Top PZ Location:Sec:33 Twp: 2N 64WFootage: 30 FNL  1934 FWL
Bottom Hole Location:Sec:33 Twp: 2N 64WFootage: 22 S  1915 W
Log Types:MWD/LWD, CBL, (Resistivity in 123-46497)
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: 70, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1701 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 782, Top: 0 ft., Bottom: 1701 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12663 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1774, Top: 1215 ft., Bottom: 12689 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FOX HILLS BASE992 ft.
PARKMAN4218 ft.
SUSSEX4552 ft.
SHANNON4871 ft.
SHARON SPRINGS6999 ft.
NIOBRARA7032 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 3/1/2024                  Interval Top: 7430 ft.    Interval Bottom: 12483 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/6/2018Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/30/2018Treatment End Date:5/9/2018
Treatment Summary:40,500 gallons of 7.5% HCl, 297,075 bbls of FR water, 198 bbls of FDP water, 3,798 bbls of treated water, 2,523,210 lbs of 100 mesh, 7,272,020 lbs of white 40/70,
Total fluid used in treatment (bbls):302035Max pressure during treatment (psi):11297
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:35
Total acid used in treatment (bbls):964Min frac gradient (psi/ft):0.89
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):16975
Fresh water used in treatment (bbls):301071Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9795230Green completions techniques utilized:Yes
Reason green techniques Not utilized: PIPELINE
Tubing Size:2.375 in.Tubing Setting Depth:7143 ft.
Tubing Packer Depth:7143 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/21/2018Test Method:Flowback
Hours Tested:24Gas Type:WET
Gas Disposal:FLARED
Test TypeMeasure
BBLS_H2O 2074
BBLS_OIL 691
BTU_GAS 1171
CALC_BBLS_H2O 2074
CALC_BBLS_OIL 691
CALC_GOR 750
CALC_MCF_GAS 518
CASING_PRESS 1150
GRAVITY_OIL 42
MCF_GAS 518
Perforation Data:
Interval Top:7430 ft.# Of Holes:836
Interval Bottom:12483 ft.Hole Size:0.36 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)1197
Total Gas Produced (MCF)7930
GOR6624
GOR DeterminationBOE
Average BOE per Day7.024
Average MCFE per Day40.738

 Federal Financial Assurance  i 

 Tribal Well  i No