Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-46437
Well Classification: OW Status: PR - 7/12/2019
Well Name/No:GRACIE #24-7HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/12/2019
FacilityID:454174LocationID:432526
County:WELD #123Location:SESW 24 2N66W 6
Field:WATTENBERG - #90750Elevation:5082 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:345FSL  1685 FWLLat/Long: 40.117474 / -104.728948Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.117474 / -104.728947Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/8/2019
End Date: 5/11/2019
Reported: 7/9/2019
Days to report: 59
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 7/12/2019             Measured TD: 12728 ft.    Vertical TD: 7518 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 7/12/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/1/2020
Proposed Top PZ Location:Sec:25 Twp: 2N 66W Footage: 50 FNL  1669 FWL
Bottom Hole Location:Sec:25 Twp: 2N 66W Footage: 471 FSL  1649 FWL
Proposed Depth/Form:12659 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 400, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 36.94 , Citings Type: PLANNED
Cement:Sacks: 30, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1800 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 710, Top: 0 ft., Bottom: 1800 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12649 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1481, Top: , Bottom: 12649 ft.

Wellbore Completed
Completion Date:8/16/2018
Spud Date:5/28/2018Spud Date Is:ACTUAL
Measured TD:12728 ft.Measured PB depth:12716 ft.
True Vertical TD:7518 ft.True Vertical PB depth:7517 ft.
Top PZ Location:Sec:25 Twp: 2N 66WFootage: 104 FNL  1667 FWL
Bottom Hole Location:Sec:25 Twp: 2N 66WFootage: 475 FSL  1679 FWL
Log Types:CBL, MWD/LWD. (GR/RES in API 123-46432).
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1845 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 692, Top: 0 ft., Bottom: 1845 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12718 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1140, Top: 1570 ft., Bottom: 12728 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FOX HILLS1529 ft.
PARKMAN4251 ft.
SUSSEX4739 ft.
SHARON SPRINGS7214 ft.
NIOBRARA7281 ft.
FORT HAYS7812 ft.
CODELL7935 ft.
CARLILE10503 ft.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 8/1/2019                  Interval Top: 12679 ft.    Interval Bottom: 12686 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/1/2019Treatment End Date:N/A
Treatment Summary:12679-12686
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:12679 ft.# Of Holes:288
Interval Bottom:12686 ft.Hole Size:0.44 in.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 8/1/2019                  Interval Top: 10503 ft.    Interval Bottom: 10762 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/1/2019Treatment End Date:N/A
Treatment Summary:10503-10728, 10745-10762
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:10503 ft.# Of Holes:288
Interval Bottom:10762 ft.Hole Size:0.44 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 7/12/2019                 Interval Top: 8003 ft.    Interval Bottom: 12686 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:6/5/2019Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/8/2019Treatment End Date:5/11/2019
Treatment Summary:PERF AND FRAC FROM 8003-12686. 35 BBL 15% HCL ACID, 24 BBL 7.5% HCL ACID, 2,874 BBL PUMP DOWN, 83,018 BBL SLICKWATER, 85,951 TOTAL FLUID, 2,588,030# 40/70 OTTAWA/ST. PETERS, 2,588,030# TOTAL SAND.
Total fluid used in treatment (bbls):85951Max pressure during treatment (psi):7654
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:12
Total acid used in treatment (bbls):59Min frac gradient (psi/ft):0.90
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):6241
Fresh water used in treatment (bbls):85892Disposition method For flowback:
Total proppant used (lbs):2588030Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7469 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/12/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 58
BBLS_OIL 222
BTU_GAS 1266
CALC_BBLS_H2O 58
CALC_BBLS_OIL 222
CALC_GOR 1306
CALC_MCF_GAS 290
CASING_PRESS 1700
GRAVITY_OIL 47
MCF_GAS 290
TUBING_PRESS 1500
Perforation Data:
Interval Top:8003 ft.# Of Holes:288
Interval Bottom:12686 ft.Hole Size:0.44 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 8/1/2019                  Interval Top: 8003 ft.    Interval Bottom: 12679 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/1/2019Treatment End Date:N/A
Treatment Summary:8003-10503, 10728-10745, 10762-12679
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8003 ft.# Of Holes:288
Interval Bottom:12679 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)1902
Total Gas Produced (MCF)18767
GOR9866
GOR DeterminationBOE
Average BOE per Day13.974
Average MCFE per Day81.040

 Federal Financial Assurance  i 

 Tribal Well  i No