|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 6/4/2019 Measured TD: 12650 ft. Vertical TD: 7469 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 6/4/2019 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 2/14/2020 | | Proposed Top PZ Location: | Sec:25 Twp: 2N 66W | Footage: 50 FNL 78 FEL | | Bottom Hole Location: | Sec:25 Twp: 2N 66W | Footage: 481 FSL 71 FEL | | Proposed Depth/Form: | 12620 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 400, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 36.94 , Citings Type: PLANNED | | Cement: | Sacks: 64, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 590, Top: 0 ft., Bottom: 1500 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12610 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 1476, Top: , Bottom: 12610 ft. |
| | |
| Wellbore Completed | | Completion Date: | 9/8/2018 | | Spud Date: | 6/1/2018 | Spud Date Is: | ACTUAL | | Measured TD: | 12650 ft. | Measured PB depth: | 12626 ft. | | True Vertical TD: | 7469 ft. | True Vertical PB depth: | 7469 ft. | | Top PZ Location: | Sec:25 Twp: 2N 66W | Footage: 39 FNL 67 FEL | | Bottom Hole Location: | Sec:25 Twp: 2N 66W | Footage: 484 FSL 49 FEL | | Log Types: | CBL, MWD/LWD. (GR/CNL in API 123-46397). | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 101 ft., Weight: 42 , Citings Type: ACTUAL | | Cement: | Sacks: 64, Top: 0 ft., Bottom: 101 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1861 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 697, Top: 0 ft., Bottom: 1861 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12640 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 1140, Top: 1684 ft., Bottom: 12650 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FOX HILLS | 1479 ft. | | | | | PARKMAN | 4211 ft. | | | | | SUSSEX | 4699 ft. | | | | | SHARON SPRINGS | 7212 ft. | | | | | NIOBRARA | 7289 ft. | | | | | FORT HAYS | 7725 ft. | | | | | CODELL | 7807 ft. | | | |
Formation FTHYS Formation Classification: OW Status: CM - 6/11/2019 Interval Top: 11625 ft. Interval Bottom: 11772 ft.| Completed Information for Formation FORT HAYS | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | FORT HAYS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 6/11/2019 | Treatment End Date: | N/A | | Treatment Summary: | 11625-11772 | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation FTHYS. |
| | Perforation Data: | | Interval Top: | 11625 ft. | # Of Holes: | 312 | | Interval Bottom: | 11772 ft. | Hole Size: | 0.44 in. |
|
Formation CD-FH Formation Classification: OW Status: PR - 6/4/2019 Interval Top: 7900 ft. Interval Bottom: 12607 ft.| Completed Information for Formation CODELL-FORT HAYS | | 1st Production Date: | 5/9/2019 | Choke Size: | | | Formation Name: | CODELL-FORT HAYS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 4/8/2019 | Treatment End Date: | 4/11/2019 | | Treatment Summary: | PERF AND FRAC FROM 7900-12607.
238 BBL 7.5% HCL ACID, 1,831 BBL PUMP DOWN, 87,902 BBL SLICKWATER, 89,971 TOTAL FLUID, 2,565,110# 40/70 OTTAWA/ST. PETERS, 2,565,110# TOTAL SAND. | | Total fluid used in treatment (bbls): | 89971 | Max pressure during treatment (psi): | 7574 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 13 | | Total acid used in treatment (bbls): | 238 | Min frac gradient (psi/ft): | 0.86 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 5349 | | Fresh water used in treatment (bbls): | 89733 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 2565110 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7500 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/4/2019 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 100 | | BBLS_OIL | 307 | | BTU_GAS | 1266 | | CALC_BBLS_H2O | 100 | | CALC_BBLS_OIL | 307 | | CALC_GOR | 876 | | CALC_MCF_GAS | 269 | | CASING_PRESS | 2500 | | GRAVITY_OIL | 47 | | MCF_GAS | 269 | | TUBING_PRESS | 1500 |
| | Perforation Data: | | Interval Top: | 7900 ft. | # Of Holes: | 312 | | Interval Bottom: | 12607 ft. | Hole Size: | 0.44 in. |
|
Formation CODL Formation Classification: OW Status: CM - 6/11/2019 Interval Top: 7900 ft. Interval Bottom: 12607 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 6/11/2019 | Treatment End Date: | N/A | | Treatment Summary: | 7900-11625, 11772-12607 | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7900 ft. | # Of Holes: | 312 | | Interval Bottom: | 12607 ft. | Hole Size: | 0.44 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 3354 |
| Total Gas Produced (MCF) | 94998 |
| GOR | 28323 |
| GOR Determination | MCFE |
| Average BOE per Day | 54.034 |
| Average MCFE per Day | 313.399 |
| Federal Financial Assurance | i | |
|
|