|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 4/1/2021 Measured TD: 16146 ft. Vertical TD: 7158 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 4/1/2021 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 1/28/2020 | | Proposed Top PZ Location: | Sec:25 Twp: 2N 65W | Footage: 2637 FNL 649 FEL | | Bottom Hole Location: | Sec:1 Twp: 1N 65W | Footage: 328 FNL 515 FEL | | Proposed Depth/Form: | 16083 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42.1 , Citings Type: PLANNED | | Cement: | Sacks: 30, Top: 0 ft., Bottom: 40 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 590, Top: 0 ft., Bottom: 1500 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 16073 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 1899, Top: , Bottom: 16073 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/23/2018 | | Spud Date: | 4/26/2018 | Spud Date Is: | ACTUAL | | Measured TD: | 16146 ft. | Measured PB depth: | 16132 ft. | | True Vertical TD: | 7158 ft. | True Vertical PB depth: | 7158 ft. | | Top PZ Location: | Sec:25 Twp: 2N 65W | Footage: 2637 FNL 649 FEL | | Bottom Hole Location: | Sec:1 Twp: 1N 65W | Footage: 328 FNL 515 FEL | | Log Types: | LWD/GR, CBL, CNL RUN ON THE GEORGE 25-3HZ WELL (API: 05-123-46331). | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 97 ft., Weight: 42 , Citings Type: ACTUAL | | Cement: | Sacks: 64, Top: 0 ft., Bottom: 97 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1876 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 703, Top: 0 ft., Bottom: 1876 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 16136 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 1510, Top: 1644 ft., Bottom: 16146 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SHARON SPRINGS | | | | | | FOX HILLS | 1385 ft. | | | | | PARKMAN | 4161 ft. | | | | | SUSSEX | 4642 ft. | | | | | NIOBRARA | 7144 ft. | | | | | FORT HAYS | 7598 ft. | | | | | CODELL | 7679 ft. | | | | | CARLILE | 12781 ft. | | | |
Formation CARL Formation Classification: OW Status: CM - 6/11/2019 Interval Top: 12781 ft. Interval Bottom: 12832 ft.| Completed Information for Formation CARLILE | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CARLILE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 6/11/2019 | Treatment End Date: | N/A | | Treatment Summary: | 12781-12832 | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 12038 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CARL. |
| | Perforation Data: | | Interval Top: | 12781 ft. | # Of Holes: | 544 | | Interval Bottom: | 12832 ft. | Hole Size: | 0.44 in. |
|
Formation FTHYS Formation Classification: OW Status: CM - 6/11/2019 Interval Top: 9089 ft. Interval Bottom: 14219 ft.| Completed Information for Formation FORT HAYS | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | FORT HAYS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 6/11/2019 | Treatment End Date: | N/A | | Treatment Summary: | 9089-9365, 13731-14219 | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation FTHYS. |
| | Perforation Data: | | Interval Top: | 9089 ft. | # Of Holes: | 544 | | Interval Bottom: | 14219 ft. | Hole Size: | 0.44 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 6/11/2019 Interval Top: 9037 ft. Interval Bottom: 14411 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 6/11/2019 | Treatment End Date: | N/A | | Treatment Summary: | 9037-9089, 13482-13731, 14219-14411 | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 9037 ft. | # Of Holes: | 544 | | Interval Bottom: | 14411 ft. | Hole Size: | 0.44 in. |
|
Formation CODL Formation Classification: OW Status: CM - 6/11/2019 Interval Top: 7762 ft. Interval Bottom: 16109 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 6/11/2019 | Treatment End Date: | N/A | | Treatment Summary: | 7762-9037, 9365-12781, 12832-13482, 14411-16109 | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7762 ft. | # Of Holes: | 544 | | Interval Bottom: | 16109 ft. | Hole Size: | 0.44 in. |
|
Formation NFCC Formation Classification: OW Status: PR - 4/1/2021 Interval Top: 7762 ft. Interval Bottom: 16109 ft.| Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE | | 1st Production Date: | 4/17/2019 | Choke Size: | | | Formation Name: | NIOBRARA-FORT HAYS-CODELL-CARLILE | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 3/23/2019 | Treatment End Date: | 3/29/2019 | | Treatment Summary: | PERF AND FRAC FROM 7762-16109.
250 BBL 15% HCL ACID, 166 BBL 7.5% HCL ACID, 5,248 BBL PUMP DOWN, 120,011 BBL SLICKWATER, 125,675 TOTAL FLUID, 3,641,900# 40/70 OTTAWA/ST. PETERS, 3,641,900# TOTAL SAND. | | Total fluid used in treatment (bbls): | 125675 | Max pressure during treatment (psi): | 7757 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 21 | | Total acid used in treatment (bbls): | 416 | Min frac gradient (psi/ft): | 0.95 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 12038 | | Fresh water used in treatment (bbls): | 125259 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 3641900 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7400 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/1/2019 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 119 | | BBLS_OIL | 274 | | BTU_GAS | 1281 | | CALC_BBLS_H2O | 119 | | CALC_BBLS_OIL | 274 | | CALC_GOR | 770 | | CALC_MCF_GAS | 211 | | CASING_PRESS | 1600 | | GRAVITY_OIL | 51 | | MCF_GAS | 211 | | TUBING_PRESS | 1200 |
| | Perforation Data: | | Interval Top: | 7762 ft. | # Of Holes: | 544 | | Interval Bottom: | 16109 ft. | Hole Size: | 0.44 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 9062 |
| Total Gas Produced (MCF) | 78264 |
| GOR | 8636 |
| GOR Determination | BOE |
| Average BOE per Day | 64.343 |
| Average MCFE per Day | 373.169 |
| Federal Financial Assurance | i | |
|
|