Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-46258
Well Classification: OW Status: PR - 5/12/2019
Well Name/No:VERDE #13-18HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/12/2019
FacilityID:453682LocationID:453676
County:WELD #123Location:NWNE 13 1N66W 6
Field:WATTENBERG - #90750Elevation:5073 ft.
Planned Location:906FNL  2526 FELLat/Long: 40.056066 / -104.725027Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.056066 / -104.725029Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/22/2019
End Date: 3/31/2019
Reported: 5/2/2019
Days to report: 32
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/12/2019             Measured TD: 19170 ft.    Vertical TD: 7332 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/12/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:1/8/2020
Proposed Top PZ Location:Sec:13 Twp: 1N 66W Footage: 370 FNL  95 FEL
Bottom Hole Location:Sec:1 Twp: 1N 66W Footage: 50 FNL  81 FEL
Proposed Depth/Form:19062 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 800, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42.1 , Citings Type: PLANNED
Cement:Sacks: 30, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1800 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 700, Top: 0 ft., Bottom: 1800 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 19052 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2264, Top: , Bottom: 19052 ft.

Wellbore Completed
Completion Date:3/24/2018
Spud Date:3/5/2018Spud Date Is:ACTUAL
Measured TD:19170 ft.Measured PB depth:19150 ft.
True Vertical TD:7332 ft.True Vertical PB depth:7332 ft.
Top PZ Location:Sec:13 Twp: 1N 66WFootage: 397 FNL  91 FEL
Bottom Hole Location:Sec:1 Twp: 1N 66WFootage: 53 N  69 E
Log Types:LWD/GR, CBL, RESISTIVITY
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 106 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 106 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1915 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 686, Top: 0 ft., Bottom: 1915 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 19162 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 2360, Top: 1390 ft., Bottom: 19170 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FOX HILLS1645 ft.
PARKMAN4680 ft.
SUSSEX5076 ft.
SHARON SPRINGS7766 ft.
NIOBRARA7806 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 5/12/2019                 Interval Top: 8289 ft.    Interval Bottom: 19138 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/15/2019Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/22/2019Treatment End Date:3/31/2019
Treatment Summary:PERF AND FRAC FROM 8289-19138. 1,171 BBL 15% HCL ACID; 20,830 BBL PUMP DOWN; 320,438 BBL SLICKWATER; 342,439 TOTAL FLUID; 5,119,690# 40/70 GENOA/SAND HILLS; 3,601,960# 40/70 OTTAWA/ST. PETERS; 8,721,650# TOTAL SAND.
Total fluid used in treatment (bbls):342439Max pressure during treatment (psi):7986
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:53
Total acid used in treatment (bbls):1171Min frac gradient (psi/ft):0.89
Recycled water used in treatment (bbls):2250Total flowback volume recovered (bbls):10276
Fresh water used in treatment (bbls):339018Disposition method For flowback:RECYCLE
Total proppant used (lbs):8721650Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7922 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/12/2019Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 96
BTU_GAS 1306
CALC_BBLS_OIL 96
CALC_GOR 760
CALC_MCF_GAS 73
CASING_PRESS 1600
GRAVITY_OIL 51
MCF_GAS 73
TUBING_PRESS 1100
Perforation Data:
Interval Top:8289 ft.# Of Holes:1696
Interval Bottom:19138 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)10402
Total Gas Produced (MCF)152270
GOR14638
GOR DeterminationBOE
Average BOE per Day100.119
Average MCFE per Day580.696

 Federal Financial Assurance  i 

 Tribal Well  i No