Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-46127
Well Classification: OW Status: PR - 10/1/2024
Well Name/No:Sam #3H-25H-M166
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/1/2024
FacilityID:453465LocationID:453474
Municipality/County:LOCHBUIE / WELD #123Location:NWSW 25 1N66W 6
Field:DJ HORIZONTAL CODELL - #16948Elevation:5082 ft.
Planned Location:1343FSL  310 FWLLat/Long: 40.018702 / -104.733854Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.018708 / -104.733856Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/1/2019
End Date: 3/6/2019
Reported: 6/6/2019
Days to report: 92
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 10/1/2024             Measured TD: 12024 ft.    Vertical TD: 7595 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 10/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:12/20/2019
Proposed Top PZ Location:Sec:25 Twp: 1N 66W Footage: 1209 FSL  946 FWL
Bottom Hole Location:Sec:25 Twp: 1N 66W Footage: 1257 FSL  465 FEL
Proposed Depth/Form:12070 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CLCDFH, Formation: CARLILE-CODELL-FORT HAYS , Order: 407-2175 , Unit Acreage: 320, Drill Unit: Sec 25: S/2
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 42.05 , Citings Type: PLANNED
Cement:Sacks: 430, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2353 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 1013, Top: 0 ft., Bottom: 2353 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12070 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2192, Top: 0 ft., Bottom: 12070 ft.

Wellbore Completed
Completion Date:9/2/2018
Spud Date:5/27/2018Spud Date Is:ACTUAL
Measured TD:12024 ft.Measured PB depth:12000 ft.
True Vertical TD:7595 ft.True Vertical PB depth:7595 ft.
Top PZ Location:Sec:25 Twp: 1N 66WFootage: 1209 FSL  946 FWL
Bottom Hole Location:Sec:25 Twp: 1N 66WFootage: 1257 S  465 E
Log Types:MUD, MWD/LWD, Surface CBL, Production CBL, PULSE NEUTRON
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 121 ft., Weight: 42.09 , Citings Type: ACTUAL
Cement:Sacks: 58, Top: 0 ft., Bottom: 121 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2402 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 920, Top: 0 ft., Bottom: 2417 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12014 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1513, Top: 2345 ft., Bottom: 12024 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4795 ft.NN
SHANNON5428 ft.NN
TEEPEE BUTTES6636 ft.NN
SHARON SPRINGS7240 ft.NN
NIOBRARA7257 ft.NN
FORT HAYS8150 ft.NN
CODELL8253 ft.NN
CARLILE9065 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 10/20/2020                Interval Top: 9065 ft.    Interval Bottom: 9364 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:10/20/2020Treatment End Date:N/A
Treatment Summary:Carlile: 9065-9364
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:9065 ft.# Of Holes:313
Interval Bottom:9364 ft.Hole Size:

Formation CODL                     Formation Classification:  OW                     Status:  CM - 10/20/2020                Interval Top: 8253 ft.    Interval Bottom: 11966 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:10/20/2020Treatment End Date:N/A
Treatment Summary:Codell: 8253-9064, 9365-11966
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8253 ft.# Of Holes:313
Interval Bottom:11966 ft.Hole Size:

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 10/1/2024                 Interval Top: 8160 ft.    Interval Bottom: 11966 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:5/1/2019Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/1/2019Treatment End Date:3/6/2019
Treatment Summary:90163 bbls of water, 62 bbls of recycled water, 139 bbls of additives (FRP-4CS, SAFE-BFH-2, XLS-3Z, BHL-68W, ACI-97, ASF-67, LGA-3J) and 12 bbl HCL in a 14 stage frac with 2201050 lbs of silica quartz proppant
Total fluid used in treatment (bbls):90376Max pressure during treatment (psi):8823
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:14
Total acid used in treatment (bbls):12Min frac gradient (psi/ft):0.90
Recycled water used in treatment (bbls):62Total flowback volume recovered (bbls):13400
Fresh water used in treatment (bbls):90302Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2201050Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7619 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/18/2019Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 630
BBLS_OIL 488
BTU_GAS 1331
CALC_BBLS_H2O 630
CALC_BBLS_OIL 488
CALC_GOR 957
CALC_MCF_GAS 467
CASING_PRESS 1550
GRAVITY_OIL 37
MCF_GAS 467
TUBING_PRESS 1150
Perforation Data:
Interval Top:8160 ft.# Of Holes:313
Interval Bottom:11966 ft.Hole Size:0.42 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 10/20/2020                Interval Top: 8160 ft.    Interval Bottom: 8252 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:5/1/2019Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:10/20/2020Treatment End Date:N/A
Treatment Summary:Ft Hays: 8160-8252
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8160 ft.# Of Holes:313
Interval Bottom:8252 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)1304
Total Gas Produced (MCF)3114
GOR2388
GOR DeterminationBOE
Average BOE per Day5.100
Average MCFE per Day29.580

 Federal Financial Assurance  i 

 Tribal Well  i No