Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-46122
Well Classification: OW Status: PR - 10/1/2024
Well Name/No:Sam #3N-25H-M166
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/1/2024
FacilityID:453460LocationID:453474
Municipality/County:LOCHBUIE / WELD #123Location:SWSW 25 1N66W 6
Field:DJ HORIZONTAL CODELL - #16948Elevation:5080 ft.
Planned Location:1283FSL  309 FWLLat/Long: 40.018538 / -104.733856Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.018532 / -104.733860Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/12/2019
End Date: 3/18/2019
Reported: 6/6/2019
Days to report: 80
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 10/1/2024             Measured TD: 12098 ft.    Vertical TD: 7608 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 10/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:12/20/2019
Proposed Top PZ Location:Sec:25 Twp: 1N 66W Footage: 102 FSL  790 FWL
Bottom Hole Location:Sec:25 Twp: 1N 66W Footage: 136 FSL  466 FEL
Proposed Depth/Form:12156 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CD-FH , Formation: CODELL-FORT HAYS , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 42.05 , Citings Type: PLANNED
Cement:Sacks: 430, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2375 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 1024, Top: 0 ft., Bottom: 2375 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12156 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2218, Top: 0 ft., Bottom: 12156 ft.

Wellbore Completed
Completion Date:9/21/2018
Spud Date:6/2/2018Spud Date Is:ACTUAL
Measured TD:12098 ft.Measured PB depth:12073 ft.
True Vertical TD:7608 ft.True Vertical PB depth:7608 ft.
Top PZ Location:Sec:25 Twp: 1N 66WFootage: 102 FSL  790 FWL
Bottom Hole Location:Sec:25 Twp: 1N 66WFootage: 136 S  466 E
Log Types:MUD, MWD/LWD, Surface CBL, Production CBL, DENSITY
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 121 ft., Weight: 42.09 , Citings Type: ACTUAL
Cement:Sacks: 58, Top: 0 ft., Bottom: 121 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2422 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 932, Top: 0 ft., Bottom: 2438 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12087 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1528, Top: 3106 ft., Bottom: 12098 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4806 ft.NN
SHANNON5507 ft.NN
TEEPEE BUTTES6691 ft.NN
SHARON SPRINGS7304 ft.NN
NIOBRARA7322 ft.NN
FORT HAYS8065 ft.NN
CODELL8193 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 11/13/2020                Interval Top: 8193 ft.    Interval Bottom: 12039 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:11/13/2020Treatment End Date:N/A
Treatment Summary:Codell: 8193-12039
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8193 ft.# Of Holes:324
Interval Bottom:12039 ft.Hole Size:

Formation CD-FH                   Formation Classification:  OW                   Status:  PR - 10/1/2024                 Interval Top: 8080 ft.    Interval Bottom: 12039 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:5/1/2019Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/12/2019Treatment End Date:3/18/2019
Treatment Summary:94952 bbls of water, 10 bbls of recycled water, 147 bbls of additives (FRP-4CS, SAFE-BFH-2, XLS-3Z, BHL-68W, ACI-97, ASF-67, LGA-3J) and 18 bbl HCL in a 15 stage frac with 2438090 lbs of silica quartz proppant
Total fluid used in treatment (bbls):95127Max pressure during treatment (psi):8626
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:15
Total acid used in treatment (bbls):18Min frac gradient (psi/ft):0.92
Recycled water used in treatment (bbls):10Total flowback volume recovered (bbls):14741
Fresh water used in treatment (bbls):95099Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2438090Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7690 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/14/2019Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 772
BBLS_OIL 589
BTU_GAS 1328
CALC_BBLS_H2O 772
CALC_BBLS_OIL 589
CALC_GOR 937
CALC_MCF_GAS 552
CASING_PRESS 1700
GRAVITY_OIL 37
MCF_GAS 552
TUBING_PRESS 1125
Perforation Data:
Interval Top:8080 ft.# Of Holes:324
Interval Bottom:12039 ft.Hole Size:0.42 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 11/13/2020                Interval Top: 8080 ft.    Interval Bottom: 8192 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:11/13/2020Treatment End Date:N/A
Treatment Summary:Ft Hays: 8080-8192
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8080 ft.# Of Holes:324
Interval Bottom:8192 ft.Hole Size:
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2023 - 11/2024

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)246
Total Gas Produced (MCF)628
GOR2552
GOR DeterminationBOE
Average BOE per Day0.983
Average MCFE per Day5.708

 Federal Financial Assurance  i 

 Tribal Well  i No