|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 3/1/2023 Measured TD: 12857 ft. Vertical TD: 7547 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 3/1/2023 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 12/17/2019 | Proposed Top PZ Location: | Sec:24 Twp: 1N 66W | Footage: 101 FNL 1343 FEL | Bottom Hole Location: | Sec:24 Twp: 1N 66W | Footage: 475 FSL 1319 FEL | Proposed Depth/Form: | 12878 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 400, Drill Unit: GWA | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42.1 , Citings Type: PLANNED | Cement: | Sacks: 30, Top: 0 ft., Bottom: 40 ft. | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1800 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 720, Top: 0 ft., Bottom: 1800 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12868 ft., Weight: 17 , Citings Type: PLANNED | Cement: | Sacks: 1508, Top: , Bottom: 12868 ft. |
| | |
Wellbore Completed | Completion Date: | 3/31/2018 | Spud Date: | 2/6/2018 | Spud Date Is: | ACTUAL | Measured TD: | 12857 ft. | Measured PB depth: | 12848 ft. | True Vertical TD: | 7547 ft. | True Vertical PB depth: | 7547 ft. | Top PZ Location: | Sec:24 Twp: 1N 66W | Footage: 101 FNL 1343 FEL | Bottom Hole Location: | Sec:24 Twp: 1N 66W | Footage: 475 S 1319 E | Log Types: | LWD/GR, CBL, CNL RUN ON THE AZUL 13-14HZ WELL (API: 05-123-46107). | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 101 ft., Weight: 42 , Citings Type: ACTUAL | Cement: | Sacks: 64, Top: 0 ft., Bottom: 101 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1876 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 673, Top: 0 ft., Bottom: 1876 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12848 ft., Weight: 17 , Citings Type: ACTUAL | Cement: | Sacks: 1150, Top: 1280 ft., Bottom: 12857 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | FOX HILLS | 1628 ft. | | | | PARKMAN | 4425 ft. | | | | SUSSEX | 4810 ft. | | | | SHARON SPRINGS | 7378 ft. | | | | NIOBRARA | 7423 ft. | | | | FORT HAYS | 8034 ft. | | | | CODELL | 8565 ft. | | | | CARLILE | 8885 ft. | | | |
Formation CARL Formation Classification: OW Status: CM - 6/6/2019 Interval Top: 8885 ft. Interval Bottom: 10815 ft. Completed Information for Formation CARLILE | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CARLILE | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 6/6/2019 | Treatment End Date: | N/A | Treatment Summary: | 8885-10351, 10462-10815 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CARL. |
| Perforation Data: | Interval Top: | 8885 ft. | # Of Holes: | 312 | Interval Bottom: | 10815 ft. | Hole Size: | 0.44 in. |
|
Formation CODL Formation Classification: OW Status: CM - 6/6/2019 Interval Top: 8565 ft. Interval Bottom: 12770 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 6/6/2019 | Treatment End Date: | N/A | Treatment Summary: | 8565-8885, 10351-10462, 10815-12770 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 8565 ft. | # Of Holes: | 312 | Interval Bottom: | 12770 ft. | Hole Size: | 0.44 in. |
|
Formation CLCDFH Formation Classification: OW Status: PR - 3/1/2023 Interval Top: 8131 ft. Interval Bottom: 12819 ft. Completed Information for Formation CARLILE-CODELL-FORT HAYS | 1st Production Date: | 4/11/2019 | Choke Size: | | Formation Name: | CARLILE-CODELL-FORT HAYS | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 3/20/2019 | Treatment End Date: | 3/22/2019 | Treatment Summary: | PERF AND FRAC FROM 8131-12819.
36 BBL 15% HCL ACID, 3,690 BBL PUMP DOWN, 83,806 BBL SLICKWATER, 87,532 TOTAL FLUID, 2,595,080# 40/70 PREMIUM, 2,595,080# TOTAL SAND. | Total fluid used in treatment (bbls): | 87532 | Max pressure during treatment (psi): | 7789 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 13 | Total acid used in treatment (bbls): | 36 | Min frac gradient (psi/ft): | 0.91 | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 7230 | Fresh water used in treatment (bbls): | 87496 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 2595080 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7728 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/5/2019 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 221 | BBLS_OIL | 174 | BTU_GAS | 1280 | CALC_BBLS_H2O | 221 | CALC_BBLS_OIL | 174 | CALC_GOR | 1000 | CALC_MCF_GAS | 174 | CASING_PRESS | 2500 | GRAVITY_OIL | 43 | MCF_GAS | 174 | TUBING_PRESS | 1500 |
| Perforation Data: | Interval Top: | 8131 ft. | # Of Holes: | 312 | Interval Bottom: | 12819 ft. | Hole Size: | 0.44 in. |
|
Formation FTHYS Formation Classification: OW Status: CM - 6/6/2019 Interval Top: 8131 ft. Interval Bottom: 8565 ft. Completed Information for Formation FORT HAYS | 1st Production Date: | N/A | Choke Size: | | Formation Name: | FORT HAYS | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 6/6/2019 | Treatment End Date: | N/A | Treatment Summary: | 8131-8565 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation FTHYS. |
| Perforation Data: | Interval Top: | 8131 ft. | # Of Holes: | 312 | Interval Bottom: | 8565 ft. | Hole Size: | 0.44 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 2043 |
Total Gas Produced (MCF) | 3653 |
GOR | 1788 |
GOR Determination | BOE |
Average BOE per Day | 7.262 |
Average MCFE per Day | 42.133 |
Federal Financial Assurance | i | |
|
|