|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 5/7/2019 Measured TD: 12964 ft. Vertical TD: 7485 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 5/7/2019 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 12/17/2019 | Proposed Top PZ Location: | Sec:13 Twp: 1N 66W | Footage: 50 FSL 1846 FEL | Bottom Hole Location: | Sec:13 Twp: 1N 66W | Footage: 471 FNL 1860 FEL | Proposed Depth/Form: | 12932 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 200, Drill Unit: GWA | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42.1 , Citings Type: PLANNED | Cement: | Sacks: 30, Top: 0 ft., Bottom: 40 ft. | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1800 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 720, Top: 0 ft., Bottom: 1800 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12922 ft., Weight: 17 , Citings Type: PLANNED | Cement: | Sacks: 1514, Top: , Bottom: 12922 ft. |
| | |
Wellbore Completed | Completion Date: | 5/1/2018 | Spud Date: | 2/13/2018 | Spud Date Is: | ACTUAL | Measured TD: | 12964 ft. | Measured PB depth: | 12952 ft. | True Vertical TD: | 7485 ft. | True Vertical PB depth: | 7484 ft. | Top PZ Location: | Sec:13 Twp: 1N 66W | Footage: 77 FSL 1813 FEL | Bottom Hole Location: | Sec:13 Twp: 1N 66W | Footage: 478 N 1865 E | Log Types: | LWD/GR, CBL, CNL | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 101 ft., Weight: 42 , Citings Type: ACTUAL | Cement: | Sacks: 64, Top: 0 ft., Bottom: 101 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1873 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 667, Top: 0 ft., Bottom: 1873 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12941 ft., Weight: 17 , Citings Type: ACTUAL | Cement: | Sacks: 1160, Top: 1420 ft., Bottom: 12964 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | FOX HILLS | 1628 ft. | | | | PARKMAN | 4438 ft. | | | | SUSSEX | 4825 ft. | | | | SHARON SPRINGS | 7468 ft. | | | | NIOBRARA | 7504 ft. | | | | FORT HAYS | 8154 ft. | | | | CODELL | 8167 ft. | | | | CARLILE | 8773 ft. | | | |
Formation CARL Formation Classification: OW Status: CM - 5/23/2019 Interval Top: 8773 ft. Interval Bottom: 12795 ft. Completed Information for Formation CARLILE | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CARLILE | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 5/23/2019 | Treatment End Date: | N/A | Treatment Summary: | 8773-8793, 9144-9535, 10404-11220, 11779-11982, 12461-12795 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CARL. |
| Perforation Data: | Interval Top: | 8773 ft. | # Of Holes: | 288 | Interval Bottom: | 12795 ft. | Hole Size: | 0.44 in. |
|
Formation FTHYS Formation Classification: OW Status: CM - 5/23/2019 Interval Top: 8181 ft. Interval Bottom: 10404 ft. Completed Information for Formation FORT HAYS | 1st Production Date: | N/A | Choke Size: | | Formation Name: | FORT HAYS | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 5/23/2019 | Treatment End Date: | N/A | Treatment Summary: | 8181-8248, 8263-8564, 10013-10153, 10307-10404 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation FTHYS. |
| Perforation Data: | Interval Top: | 8181 ft. | # Of Holes: | 288 | Interval Bottom: | 10404 ft. | Hole Size: | 0.44 in. |
|
Formation CLCDFH Formation Classification: OW Status: PR - 5/7/2019 Interval Top: 8180 ft. Interval Bottom: 12795 ft. Completed Information for Formation CARLILE-CODELL-FORT HAYS | 1st Production Date: | 4/11/2019 | Choke Size: | | Formation Name: | CARLILE-CODELL-FORT HAYS | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 2/27/2019 | Treatment End Date: | 3/5/2019 | Treatment Summary: | PERF AND FRAC FROM 8180-12795.
71 BBL 15% HCL ACID, 3,159 BBL PUMP DOWN, 83,904 BBL SLICKWATER, 87,134 TOTAL FLUID, 2,553,040# 40/70 OTTAWA/ST. PETERS, 2,553,040# TOTAL SAND. | Total fluid used in treatment (bbls): | 87134 | Max pressure during treatment (psi): | 7873 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 13 | Total acid used in treatment (bbls): | 71 | Min frac gradient (psi/ft): | 0.92 | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 8692 | Fresh water used in treatment (bbls): | 87063 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 2553040 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7798 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/7/2019 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 110 | BBLS_OIL | 96 | BTU_GAS | 1280 | CALC_BBLS_H2O | 110 | CALC_BBLS_OIL | 96 | CALC_GOR | 844 | CALC_MCF_GAS | 81 | CASING_PRESS | 2500 | GRAVITY_OIL | 43 | MCF_GAS | 81 | TUBING_PRESS | 1500 |
| Perforation Data: | Interval Top: | 8180 ft. | # Of Holes: | 288 | Interval Bottom: | 12795 ft. | Hole Size: | 0.44 in. |
|
Formation CODL Formation Classification: OW Status: CM - 5/23/2019 Interval Top: 8180 ft. Interval Bottom: 12461 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 5/23/2019 | Treatment End Date: | N/A | Treatment Summary: | 8180-8181, 8248-8263, 8564-8773, 8793-9144, 9535-10013, 10153-10307, 11220-11779, 11982-12461 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 8180 ft. | # Of Holes: | 288 | Interval Bottom: | 12461 ft. | Hole Size: | 0.44 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 2981 |
Total Gas Produced (MCF) | 70234 |
GOR | 23560 |
GOR Determination | MCFE |
Average BOE per Day | 41.196 |
Average MCFE per Day | 238.960 |
Federal Financial Assurance | i | |
|
|