Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-46104
Well Classification: OW Status: PR - 5/7/2019
Well Name/No:AZUL #13-20HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/7/2019
FacilityID:453433LocationID:453447
County:WELD #123Location:SESW 13 1N66W 6
Field:WATTENBERG - #90750Elevation:5050 ft.
Planned Location:747FSL  2326 FWLLat/Long: 40.046086 / -104.726644Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.046086 / -104.726643Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/17/2019
End Date: 2/19/2019
Reported: 4/18/2019
Days to report: 58
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/7/2019             Measured TD: 12727 ft.    Vertical TD: 7557 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/7/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:12/17/2019
Proposed Top PZ Location:Sec:24 Twp: 1N 66W Footage: 50 FNL  2285 FEL
Bottom Hole Location:Sec:24 Twp: 1N 66W Footage: 468 FSL  2279 FEL
Proposed Depth/Form:12681 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 400, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42.1 , Citings Type: PLANNED
Cement:Sacks: 30, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1800 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 720, Top: 0 ft., Bottom: 1800 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12671 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1484, Top: , Bottom: 12671 ft.

Wellbore Completed
Completion Date:5/23/2018
Spud Date:2/18/2018Spud Date Is:ACTUAL
Measured TD:12727 ft.Measured PB depth:12704 ft.
True Vertical TD:7557 ft.True Vertical PB depth:7556 ft.
Top PZ Location:Sec:24 Twp: 1N 66WFootage: 118 FNL  2309 FEL
Bottom Hole Location:Sec:24 Twp: 1N 66WFootage: 470 S  2269 E
Log Types:LWD/GR, CBL, CNL RUN ON THE AZUL 13-14HZ WELL (API: 05-123-46107).
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 101 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 101 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1875 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 674, Top: 0 ft., Bottom: 1875 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12717 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1130, Top: 1645 ft., Bottom: 12727 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FOX HILLS1612 ft.
PARKMAN4291 ft.
SUSSEX4659 ft.
SHARON SPRINGS7289 ft.
NIOBRARA7318 ft.
FORT HAYS7910 ft.
CODELL8197 ft.
CARLILE9411 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 5/23/2019                 Interval Top: 12495 ft.    Interval Bottom: 12508 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/23/2019Treatment End Date:N/A
Treatment Summary:12495-12508
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:12495 ft.# Of Holes:288
Interval Bottom:12508 ft.Hole Size:0.44 in.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 5/23/2019                 Interval Top: 9442 ft.    Interval Bottom: 11192 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/23/2019Treatment End Date:N/A
Treatment Summary:9442-9676, 10595-10709, 10742-11192
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:9442 ft.# Of Holes:288
Interval Bottom:11192 ft.Hole Size:0.44 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 5/23/2019                 Interval Top: 8192 ft.    Interval Bottom: 12685 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/23/2019Treatment End Date:N/A
Treatment Summary:8192-9442, 9676-10595, 10709-10742, 11192-12495, 12681-12685
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8192 ft.# Of Holes:288
Interval Bottom:12685 ft.Hole Size:0.44 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 5/23/2019                 Interval Top: 8017 ft.    Interval Bottom: 12681 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/23/2019Treatment End Date:N/A
Treatment Summary:8017-8192, 12508-12681
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8017 ft.# Of Holes:288
Interval Bottom:12681 ft.Hole Size:0.44 in.

Formation NFCC                     Formation Classification:  OW                     Status:  PR - 5/7/2019                  Interval Top: 8017 ft.    Interval Bottom: 12685 ft.

 Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE
1st Production Date:4/11/2019Choke Size: 
Formation Name:NIOBRARA-FORT HAYS-CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/17/2019Treatment End Date:2/19/2019
Treatment Summary:PERF AND FRAC FROM 8017-12685. 124 BBL 15% HCL ACID, 3,290 BBL PUMP DOWN, 83,985 BBL SLICKWATER, 87,399 TOTAL FLUID, 2,584,058# 40/70 PREMIUM, 2,584,058# TOTAL SAND.
Total fluid used in treatment (bbls):87399Max pressure during treatment (psi):7622
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:12
Total acid used in treatment (bbls):124Min frac gradient (psi/ft):0.87
Recycled water used in treatment (bbls):150Total flowback volume recovered (bbls):6237
Fresh water used in treatment (bbls):87125Disposition method For flowback:RECYCLE
Total proppant used (lbs):2584058Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7546 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/7/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 110
BBLS_OIL 96
BTU_GAS 1280
CALC_BBLS_H2O 110
CALC_BBLS_OIL 96
CALC_GOR 844
CALC_MCF_GAS 81
CASING_PRESS 2500
GRAVITY_OIL 43
MCF_GAS 81
TUBING_PRESS 1500
Perforation Data:
Interval Top:8017 ft.# Of Holes:288
Interval Bottom:12685 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)2950
Total Gas Produced (MCF)54948
GOR18626
GOR DeterminationMCFE
Average BOE per Day33.922
Average MCFE per Day196.746

 Federal Financial Assurance  i 

 Tribal Well  i No