Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-46100
Well Classification: OW Status: PR - 11/1/2023
Well Name/No:AZUL #13-25HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/1/2023
FacilityID:453429LocationID:453447
County:WELD #123Location:SESW 13 1N66W 6
Field:WATTENBERG - #90750Elevation:5048 ft.
Planned Location:880FSL  2447 FWLLat/Long: 40.046454 / -104.726211Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.046453 / -104.726212Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/25/2019
End Date: 3/31/2019
Reported: 5/2/2019
Days to report: 32
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 11/1/2023             Measured TD: 13364 ft.    Vertical TD: 7515 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 11/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:12/17/2019
Proposed Top PZ Location:Sec:13 Twp: 1N 66W Footage: 234 FSL  352 FEL
Bottom Hole Location:Sec:24 Twp: 1N 66W Footage: 478 FSL  362 FEL
Proposed Depth/Form:13199 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 400, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42.1 , Citings Type: PLANNED
Cement:Sacks: 30, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1800 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 720, Top: 0 ft., Bottom: 1800 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 13189 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1547, Top: , Bottom: 13189 ft.

Wellbore Completed
Completion Date:3/20/2018
Spud Date:2/4/2018Spud Date Is:ACTUAL
Measured TD:13364 ft.Measured PB depth:13343 ft.
True Vertical TD:7515 ft.True Vertical PB depth:7516 ft.
Top PZ Location:Sec:13 Twp: 1N 66WFootage: 234 FSL  352 FEL
Bottom Hole Location:Sec:24 Twp: 1N 66WFootage: 478 S  362 E
Log Types:GR, CBL, CNL RUN ON THE AZUL 13-14HZ WELL (API: 05-123-46107).
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 101 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 101 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1884 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 675, Top: 0 ft., Bottom: 1884 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 13354 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1330, Top: 950 ft., Bottom: 13364 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FOX HILLS1654 ft.
PARKMAN4624 ft.
SUSSEX5033 ft.
SHARON SPRINGS7704 ft.
NIOBRARA7735 ft.
FORT HAYS8228 ft.
CODELL8299 ft.
CARLILE8932 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 5/14/2019                 Interval Top: 8932 ft.    Interval Bottom: 11862 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/14/2019Treatment End Date:N/A
Treatment Summary:8932-9349, 10656-11862
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:8932 ft.# Of Holes:336
Interval Bottom:11862 ft.Hole Size:0.44 in.

Formation CD-CRL                 Formation Classification:  OW                 Status:  PR - 11/1/2023                 Interval Top: 8385 ft.    Interval Bottom: 13317 ft.

 Completed Information for Formation CODELL-CARLILE
1st Production Date:4/11/2019Choke Size: 
Formation Name:CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/25/2019Treatment End Date:3/31/2019
Treatment Summary:PERF AND FRAC FROM 8385-13317. 238 BBL 15% HCL ACID, 1,580 BBL PUMP DOWN, 2,484 BBL PUMP DOWN, 82,806 BBL SLICKWATER, 87,108 TOTAL FLUID, 2,579,810# 40/70 PREMIUM, 2,579,810# TOTAL SAND.
Total fluid used in treatment (bbls):87108Max pressure during treatment (psi):7925
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:13
Total acid used in treatment (bbls):238Min frac gradient (psi/ft):0.89
Recycled water used in treatment (bbls):300Total flowback volume recovered (bbls):8607
Fresh water used in treatment (bbls):86570Disposition method For flowback:RECYCLE
Total proppant used (lbs):2579810Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8049 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/30/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 100
BBLS_OIL 98
BTU_GAS 1280
CALC_BBLS_H2O 100
CALC_BBLS_OIL 98
CALC_GOR 1755
CALC_MCF_GAS 172
CASING_PRESS 2500
GRAVITY_OIL 43
MCF_GAS 172
TUBING_PRESS 1500
Perforation Data:
Interval Top:8385 ft.# Of Holes:336
Interval Bottom:13317 ft.Hole Size:0.44 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 5/14/2019                 Interval Top: 8385 ft.    Interval Bottom: 13317 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/14/2019Treatment End Date:N/A
Treatment Summary:8385-8932, 9349-10656, 11862-13317
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8385 ft.# Of Holes:336
Interval Bottom:13317 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)6288
Total Gas Produced (MCF)11584
GOR1842
GOR DeterminationBOE
Average BOE per Day22.622
Average MCFE per Day131.195

 Federal Financial Assurance  i 

 Tribal Well  i No