|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 3/1/2022 Measured TD: 10747 ft. Vertical TD: 5280 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 3/1/2022 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 4/2/2020 | Proposed Top PZ Location: | Sec:7 Twp: 4N 68W | Footage: 1320 FSL 75 FEL | Bottom Hole Location: | Sec:7 Twp: 4N 69W | Footage: 1377 FSL 460 FWL | Proposed Depth/Form: | 16723 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 400, Drill Unit: GWA | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft. | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 400, Top: 0 ft., Bottom: 1500 ft. | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 11394 ft., Weight: 20 , Citings Type: PLANNED | Cement: | Sacks: 1442, Top: , Bottom: 11394 ft. |
| | |
Wellbore Completed | Completion Date: | 5/25/2018 | Spud Date: | 4/23/2018 | Spud Date Is: | ACTUAL | Measured TD: | 10747 ft. | Measured PB depth: | 10715 ft. | True Vertical TD: | 5280 ft. | True Vertical PB depth: | 5281 ft. | Top PZ Location: | Sec:8 Twp: 4N 68W | Footage: 1353 FSL 98 FWL | Bottom Hole Location: | Sec:7 Twp: 4N 68W | Footage: 1349 S 489 W | Log Types: | CBL, Mud, MWD/LWD, (Triple Combo on 123-45731). | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1596 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 550, Top: 0 ft., Bottom: 1596 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 10715 ft., Weight: 20 , Citings Type: ACTUAL | Cement: | Sacks: 1800, Top: 396 ft., Bottom: 10715 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 1623 ft. | | N | N | SUSSEX | 2183 ft. | | N | N | SHANNON | 2717 ft. | | N | N | SHARON SPRINGS | 5637 ft. | | N | N | NIOBRARA | 5720 ft. | | N | N | FORT HAYS | 6325 ft. | | N | N | CODELL | 6559 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 11/21/2018 Interval Top: 6577 ft. Interval Bottom: 10663 ft. Completed Information for Formation CODELL | 1st Production Date: | 10/6/2018 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 7/10/2018 | Treatment End Date: | 7/14/2018 | Treatment Summary: | Producing Interval: 6577'-10663'. | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 6577 ft. | # Of Holes: | 484 | Interval Bottom: | 10663 ft. | Hole Size: | 0.41 in. |
|
Formation FTHYS Formation Classification: OW Status: CM - 11/21/2018 Interval Top: 6329 ft. Interval Bottom: 6555 ft. Completed Information for Formation FORT HAYS | 1st Production Date: | 10/6/2018 | Choke Size: | | Formation Name: | FORT HAYS | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 7/10/2018 | Treatment End Date: | 7/14/2018 | Treatment Summary: | Producing Interval: 6329'-6555'. | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation FTHYS. |
| Perforation Data: | Interval Top: | 6329 ft. | # Of Holes: | 30 | Interval Bottom: | 6555 ft. | Hole Size: | 0.41 in. |
|
Formation NBFHC Formation Classification: OW Status: PR - 3/1/2022 Interval Top: 6008 ft. Interval Bottom: 10663 ft. Completed Information for Formation NIOBRARA-FT HAYS-CODELL | 1st Production Date: | 10/6/2018 | Choke Size: | | Formation Name: | NIOBRARA-FT HAYS-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 7/10/2018 | Treatment End Date: | 7/14/2018 | Treatment Summary: | Frac'd Niobrara-Fort Hays-Codell with 24-stage plug-and-perf;
4265 total bbls fluid pumped: 4253 bbls fresh water and 12 bbls 15% HCL acid;
4799860 total lbs proppant pumped: 30/50 mesh sand. | Total fluid used in treatment (bbls): | 4265 | Max pressure during treatment (psi): | 8408 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.33 | Type Of gas: | | Number Of staged intervals: | 24 | Total acid used in treatment (bbls): | 12 | Min frac gradient (psi/ft): | 0.80 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 3292 | Fresh water used in treatment (bbls): | 4253 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 4799860 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 5954 ft. | Tubing Packer Depth: | 5940 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/19/2018 | Test Method: | flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 403 | BBLS_OIL | 114 | BTU_GAS | 1315 | CALC_BBLS_H2O | 403 | CALC_BBLS_OIL | 114 | CALC_GOR | 351 | CALC_MCF_GAS | 40 | CASING_PRESS | 1044 | GRAVITY_OIL | 40 | MCF_GAS | 40 | TUBING_PRESS | 452 |
| Perforation Data: | Interval Top: | 6008 ft. | # Of Holes: | 553 | Interval Bottom: | 10663 ft. | Hole Size: | 0.41 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 11/21/2018 Interval Top: 6008 ft. Interval Bottom: 6306 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 10/6/2018 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 7/10/2018 | Treatment End Date: | 7/14/2018 | Treatment Summary: | Producing Interval: 6008'-6306'. | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 6008 ft. | # Of Holes: | 39 | Interval Bottom: | 6306 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 6181 |
Total Gas Produced (MCF) | 5949 |
GOR | 962 |
GOR Determination | BOE |
Average BOE per Day | 19.694 |
Average MCFE per Day | 114.207 |
Federal Financial Assurance | i | |
|
|