|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 4/1/2019 Measured TD: 16253 ft. Vertical TD: 7063 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 4/1/2019 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 9/28/2019 | Prop Depth/Form: | 14419 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED | Cement: | Sacks: 400, Top: 0 ft., Bottom: 80 ft. | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 660, Top: 0 ft., Bottom: 1500 ft. | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16273 ft., Weight: 20 , Citings Type: PLANNED | Cement: | Sacks: 2762, Top: 0 ft., Bottom: 16273 ft. |
| | |
Wellbore Completed | Completion Date: | 1/5/2018 | Spud Date: | 12/7/2017 | Spud Date Is: | ACTUAL | Measured TD: | 16253 ft. | Measured PB depth: | 16218 ft. | True Vertical TD: | 7063 ft. | True Vertical PB depth: | 7063 ft. | Top PZ Location: | Sec:9 Twp: 6N 66W | Footage: 1828 FSL 996 FWL | Depth | Bottom Hole Location: | Sec:7 Twp: 6N 66W | Footage: 1828 FSL 2162 FEL | Depth | Log Types: | MWD, Mud, CBL, (DIL in 05-123-12093 and 05-123-22620) | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL | Cement: | Sacks: 400, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1549 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 400, Top: 0 ft., Bottom: 1549 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16243 ft., Weight: 20 , Citings Type: ACTUAL | Cement: | Sacks: 2530, Top: 180 ft., Bottom: 16243 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3851 ft. | | N | N | SUSSEX | 4253 ft. | | N | N | SHANNON | 4603 ft. | | N | N | SHARON SPRINGS | 7203 ft. | | N | N | NIOBRARA | 7256 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: PR - 4/1/2019 Interval Top: 7765 ft. Interval Bottom: 16170 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 9/22/2018 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 6/29/2018 | Treatment End Date: | 7/14/2018 | Treatment Summary: | Performed 57 Stage Frac, using a total of 9,915,460 lbs Sand, Total Fluid used 473,544 bbls, Max PSI 8783, Total of 2052 holes, Perf. Diam. 0.42", Total Acid 15% HCl 381 bbls. | Total fluid used in treatment (bbls): | 473544 | Max pressure during treatment (psi): | 8783 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.33 | Type Of gas: | | Number Of staged intervals: | 57 | Total acid used in treatment (bbls): | 381 | Min frac gradient (psi/ft): | 1.04 | Recycled water used in treatment (bbls): | 13297 | Total flowback volume recovered (bbls): | 3308 | Fresh water used in treatment (bbls): | 459866 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 9915460 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7535 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 9/26/2018 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 950 | BBLS_OIL | 14 | BTU_GAS | 1350 | CALC_BBLS_H2O | 950 | CALC_BBLS_OIL | 14 | CALC_GOR | 285 | CALC_MCF_GAS | 4 | CASING_PRESS | 2050 | GRAVITY_OIL | 46 | MCF_GAS | 4 | TUBING_PRESS | 2200 |
| Perforation Data: | Interval Top: | 7765 ft. | # Of Holes: | 2052 | Interval Bottom: | 16170 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 3760 |
Total Gas Produced (MCF) | 57103 |
GOR | 15186 |
GOR Determination | MCFE |
Average BOE per Day | 37.227 |
Average MCFE per Day | 215.922 |
Federal Financial Assurance | i | |
|
|