|
|
|
|
Wellbore #00 Wellbore Classification: Status: PR - 4/1/2024 Measured TD: Wellbore Data for Original Wellbore | Wellbore Classification: PR - 4/1/2024 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 9/27/2025 | Proposed Top PZ Location: | Sec:33 Twp: 1N 65W | Footage: 360 FSL 1800 FWL | Bottom Hole Location: | Sec:28 Twp: 1N 65W | Footage: 360 FNL 1800 FWL | Proposed Depth/Form: | 18070 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-3339 , Unit Acreage: 640, Drill Unit: T1N-R65W Sec 28: W/2 | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-2173 , Unit Acreage: 1280, Drill Unit: S. 28 & 33: All | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 43 , Citings Type: PLANNED | Cement: | Sacks: 400, Top: 0 ft., Bottom: 80 ft. | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2350 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 1098, Top: 0 ft., Bottom: 2350 ft. | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18070 ft., Weight: 20 , Citings Type: PLANNED | Cement: | Sacks: 1986, Top: , Bottom: 18070 ft. |
| | |
Wellbore Completed | Completion Date: | N/A | Spud Date: | 9/22/2023 | Spud Date Is: | NOTICE | Measured TD: | | Measured PB depth: | | True Vertical TD: | | True Vertical PB depth: | | Top PZ Location: | Sec:33 Twp: 1N 65W | Footage: 360 FSL 1800 FWL | Bottom Hole Location: | Sec:28 Twp: 1N 65W | Footage: 360 N 1800 W |
Formation CODL Formation Classification: OW Status: PR - 4/1/2024 Interval Top: 8215 ft. Interval Bottom: 17955 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | HYDRAULIC FRACTURING | Treatment Date: | 12/15/2023 | Treatment End Date: | 1/1/2024 | Treatment Summary: | 1,326 BBL 15% HCL ACID; 322,483 BBL SLICKWATER; 323,809 BBL TOTAL FLUID; 1,214,887 LBS WHITE 100 MESH SAND; 10,844,986 LBS WHITE 40/70 SAND; 12,059,873 LBS TOTAL PROPPANT. | Total fluid used in treatment (bbls): | 323809 | Max pressure during treatment (psi): | 9368 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.40 | Type Of gas: | | Number Of staged intervals: | 53 | Total acid used in treatment (bbls): | 1326 | Min frac gradient (psi/ft): | 0.97 | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | 322483 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 12059873 | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 8215 ft. | # Of Holes: | 1908 | Interval Bottom: | 17955 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 40357 |
Total Gas Produced (MCF) | 53916 |
GOR | 1335 |
GOR Determination | BOE |
Average BOE per Day | 135.888 |
Average MCFE per Day | 788.144 |
Federal Financial Assurance | i | |
|
|