Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-45492
Well Classification: OW Status: PR - 5/12/2021
Well Name/No:PAPA JO 2-25 #29N3-8HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/12/2021
FacilityID:452258LocationID:452217
County:WELD #123Location:NWSW 8 1N68W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:5063 ft.
Planned Location:1403FSL  1354 FWLLat/Long: 40.062069 / -105.032498Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.062067 / -105.032498Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/17/2021
End Date: 3/22/2021
Reported: 5/17/2021
Days to report: 56
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/12/2021             Measured TD: 13590 ft.    Vertical TD: 7725 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/12/2021
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:9/20/2019
Prop Depth/Form:13530 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 240, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42.1 , Citings Type: PLANNED
Cement:Sacks: 30, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 590, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 13520 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1587, Top: , Bottom: 13520 ft.

Wellbore Completed
Completion Date:1/5/2018
Spud Date:11/22/2017Spud Date Is:ACTUAL
Measured TD:13590 ft.Measured PB depth:13575 ft.
True Vertical TD:7725 ft.True Vertical PB depth:7724 ft.
Top PZ Location:Sec:8 Twp: 1N 68WFootage: 242 FSL  1904 FWLDepth
Bottom Hole Location:Sec:8 Twp: 1N 68WFootage: 51 FNL  1886 FWLDepth
Log Types:GR, CBL, CNL RUN ON THE PAPA JO 2-25 35C-17HZ WELL (API: 05-123-45502).
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 106 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 106 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1859 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 670, Top: 0 ft., Bottom: 1869 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 13578 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1310, Top: 1385 ft., Bottom: 13590 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4419 ft.
SUSSEX4885 ft.
SHANNON5455 ft.
SHARON SPRINGS7819 ft.
NIOBRARA7878 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 5/12/2021                 Interval Top: 8492 ft.    Interval Bottom: 13551 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/20/2021Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:3/17/2021Treatment End Date:3/22/2021
Treatment Summary:PERF FROM 8492-13551 286 BBLS 20% HCR-7000 WL; 76 BBLS 7.5% HCL ACID; 5,659 BBLS PUMP DOWN; 111,848 BBLS SLICKWATER; 117,869 BBLS TOTAL FLUID. 4,070,372 LBS WHITE 40/70 OTTAWA/ST. PETERS; 4,070,372 LBS TOTAL PROPPANT.
Total fluid used in treatment (bbls):117869Max pressure during treatment (psi):7957
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:19
Total acid used in treatment (bbls):362Min frac gradient (psi/ft):0.82
Recycled water used in treatment (bbls):150Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):117357Disposition method For flowback:RECYCLE
Total proppant used (lbs):4070372Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7942 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/12/2021Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 30
BTU_GAS 1258
CALC_BBLS_OIL 30
CALC_GOR 6200
CALC_MCF_GAS 186
CASING_PRESS 1800
GRAVITY_OIL 49
MCF_GAS 186
TUBING_PRESS 1800
Perforation Data:
Interval Top:8492 ft.# Of Holes:570
Interval Bottom:13551 ft.Hole Size:0.39 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2023 - September 2024i
Total Oil Produced (Barrels)5816
Total Gas Produced (MCF)82970
GOR14265
GOR DeterminationBOE
Average BOE per Day54.960
Average MCFE per Day318.767

 Federal Financial Assurance  i 

 Tribal Well  i No