Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-45239
Well Classification: OW Status: PR - 10/1/2024
Well Name/No:Hullabaloo State #Y21-781
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:70/7879-S
Facility Status:PRStatus Date10/1/2024
FacilityID:451795LocationID:451501
County:WELD #123Location:NWNW 16 2N64W 6
Field:WATTENBERG - #90750Elevation:4894 ft.
Planned Location:445FNL  880 FWLLat/Long: 40.144560 / -104.562860Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.144577 / -104.562871Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/4/2018
End Date: 4/22/2018
Reported: 3/12/2019
Originally Reported: 5/15/2018
Days to report: 324
Days to report: 23
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 10/1/2024             Measured TD: 17319 ft.    Vertical TD: 6960 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 10/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:8/17/2019
Proposed Top PZ Location:Sec:16 Twp: 2N 64W Footage: 550 FNL  575 FWL
Bottom Hole Location:Sec:21 Twp: 2N 64W Footage: 100 FSL  565 FWL
Proposed Depth/Form:17328 ft.
Surface Mineral Owner Same:No
Mineral Owner:STATESurface Owner:STATE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 360, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 6, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 1950 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 691, Top: 0 ft., Bottom: 1950 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17328 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2264, Top: , Bottom:

Wellbore Completed
Completion Date:9/15/2017
Spud Date:9/11/2017Spud Date Is:ACTUAL
Measured TD:17319 ft.Measured PB depth:17252 ft.
True Vertical TD:6960 ft.True Vertical PB depth:6960 ft.
Top PZ Location:Sec:16 Twp: 2N 64WFootage: 567 FNL  559 FWL
Bottom Hole Location:Sec:21 Twp: 2n 64wFootage: 102 S  559 W
Log Types:CBL, MWD/LWD, (Resistivity in 123-45238)
Casing:String Type: CONDUCTOR, Hole Size: 36 in., Size: 26 in., Top: 0 ft., Depth: 110 ft., Weight: 42.09 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 110 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2025 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 710, Top: 0 ft., Bottom: 2035 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17303 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1911, Top: 2001 ft., Bottom: 17319 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3942 ft.
SUSSEX4293 ft.
SHANNON5032 ft.
TEEPEE BUTTES6095 ft.
NIOBRARA6897 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 10/1/2024                 Interval Top: 7382 ft.    Interval Bottom: 17159 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:6/10/2018Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/4/2018Treatment End Date:4/22/2018
Treatment Summary:Niobrara completed with 596,945 bbls slurry, 845 bbls 28% HCl, 1,393,406 lbs 100 mesh, 12,750,391 lbs 40/70 sand, 2,158,258 lbs 30/50 sand
Total fluid used in treatment (bbls):597790Max pressure during treatment (psi):82
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:42
Total acid used in treatment (bbls):845Min frac gradient (psi/ft):0.91
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):7278
Fresh water used in treatment (bbls):596945Disposition method For flowback:DISPOSAL
Total proppant used (lbs):16302055Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7245 ft.
Tubing Packer Depth:7250 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/14/2018Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1075
BBLS_OIL 23
BTU_GAS 1412
CALC_BBLS_H2O 1075
CALC_BBLS_OIL 23
CALC_GOR 7696
CALC_MCF_GAS 177
CASING_PRESS 7
GRAVITY_OIL 40
MCF_GAS 177
TUBING_PRESS 1785
Perforation Data:
Interval Top:7382 ft.# Of Holes:1308
Interval Bottom:17159 ft.Hole Size:0.48 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)961
Total Gas Produced (MCF)4833
GOR5029
GOR DeterminationBOE
Average BOE per Day4.913
Average MCFE per Day28.495

 Federal Financial Assurance  i 

 Tribal Well  i No