Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-44991
Well Classification: OW Status: PR - 8/1/2024
Well Name/No:Raindance FD #20-282HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/1/2024
FacilityID:451102LocationID:427917
Municipality/County:WINDSOR / WELD #123Location:NENE 30 6N67W 6
Field:WATTENBERG - #90750Elevation:4784 ft.
Planned Location:747FNL  263 FELLat/Long: 40.462936 / -104.927403Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.462936 / -104.927404Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/25/2019
End Date: 5/4/2019
Reported: 5/28/2019
Days to report: 24
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/1/2024             Measured TD: 12681 ft.    Vertical TD: 7193 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/13/2019
Proposed Top PZ Location:Sec:20 Twp: 6N 67W Footage: 1432 FSL  159 FWL
Bottom Hole Location:Sec:20 Twp: 6N 67W Footage: 1479 FSL  469 FEL
Proposed Depth/Form:12707 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 397, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 624, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12707 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1545, Top: 0 ft., Bottom: 12707 ft.

Wellbore Completed
Completion Date:7/26/2017
Spud Date:7/9/2017Spud Date Is:ACTUAL
Measured TD:12681 ft.Measured PB depth:12674 ft.
True Vertical TD:7193 ft.True Vertical PB depth:7193 ft.
Top PZ Location:Sec:20 Twp: 6N 67WFootage: 1432 FSL  159 FWL
Bottom Hole Location:Sec:20 Twp: 6N 67WFootage: 1479 S  469 E
Log Types:CBL, Mud Log, MWD/LWD, (Composite in 123-44988)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1586 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 687, Top: 0 ft., Bottom: 1586 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12681 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 2008, Top: 1712 ft., Bottom: 12681 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3435 ft.3791 ft.NN
SUSSEX4021 ft.4285 ft.NN
SHANNON4663 ft.4759 ft.NN
SHARON SPRINGS7237 ft.NN
NIOBRARA7404 ft.NN
FORT HAYS7905 ft.NN
CODELL8638 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 2/10/2020                 Interval Top: 8638 ft.    Interval Bottom: 12593 ft.

 Completed Information for Formation CODELL
1st Production Date:6/9/2019Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:2/10/2020Treatment End Date:N/A
Treatment Summary:Codell Perf Interval: 8638' - 11801', 11894' - 12593'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8638 ft.# Of Holes:690
Interval Bottom:12593 ft.Hole Size:0.38 in.

Formation CD-FH                   Formation Classification:  OW                   Status:  PR - 8/1/2024                  Interval Top: 8081 ft.    Interval Bottom: 12593 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:6/9/2019Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/25/2019Treatment End Date:5/4/2019
Treatment Summary:229,980# 100 Mesh Sand; 4,370,329# 20/40 Sand; 74,705 bbls gelled fluid; Flowback determined from well test separator.
Total fluid used in treatment (bbls):74705Max pressure during treatment (psi):4266
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:23
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.96
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):25534
Fresh water used in treatment (bbls):74705Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4600309Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7731 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/10/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 316
BBLS_OIL 503
BTU_GAS 1250
CALC_BBLS_H2O 316
CALC_BBLS_OIL 503
CALC_GOR 726
CALC_MCF_GAS 365
CASING_PRESS 1500
GRAVITY_OIL 43
MCF_GAS 365
TUBING_PRESS 450
Perforation Data:
Interval Top:8081 ft.# Of Holes:690
Interval Bottom:12593 ft.Hole Size:0.38 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 2/10/2020                 Interval Top: 8081 ft.    Interval Bottom: 11893 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:6/9/2019Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:2/10/2020Treatment End Date:N/A
Treatment Summary:Fort Hays Perf Interval: 8081' - 8637', 11802' - 11893'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8081 ft.# Of Holes:690
Interval Bottom:11893 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)9749
Total Gas Produced (MCF)18363
GOR1883
GOR DeterminationBOE
Average BOE per Day35.190
Average MCFE per Day204.088

 Federal Financial Assurance  i 

 Tribal Well  i No