|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 7/1/2018 Measured TD: 14815 ft. Vertical TD: 7721 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 7/1/2018 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 4/24/2019 | Proposed Top PZ Location: | Sec:34 Twp: 1N 66W | Footage: 2184 FSL 1718 FEL | Bottom Hole Location: | Sec:3 Twp: 1S 66W | Footage: 460 FSL 1718 FEL | Proposed Depth/Form: | 14848 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-1908 , Unit Acreage: 960, Drill Unit: S 3: All, S 34: S/2 | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 65 , Citings Type: PLANNED | Cement: | Sacks: 70, Top: 0 ft., Bottom: 80 ft. | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 462, Top: 0 ft., Bottom: 1700 ft. | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 14848 ft., Weight: 20 , Citings Type: PLANNED | Cement: | Sacks: 1900, Top: , Bottom: 14848 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7047 ft., Depth: 14848 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | 7/18/2017 | Spud Date: | 5/29/2017 | Spud Date Is: | ACTUAL | Measured TD: | 14815 ft. | Measured PB depth: | 14705 ft. | True Vertical TD: | 7721 ft. | True Vertical PB depth: | 7721 ft. | Top PZ Location: | Sec:34 Twp: 1N 66W | Footage: 2154 FSL 1727 FEL | Bottom Hole Location: | Sec:3 Twp: 1S 66W | Footage: 469 S 1689 E | Log Types: | MWD/LWD, Mud, CBL, (Res on 05-123-44646) | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 65 , Citings Type: ACTUAL | Cement: | Sacks: 70, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1744 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 780, Top: 0 ft., Bottom: 1744 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 14805 ft., Weight: 20 , Citings Type: ACTUAL | Cement: | Sacks: 2025, Top: 270 ft., Bottom: 14815 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | FOX HILLS | | 1100 ft. | N | N | PARKMAN | 4549 ft. | | N | N | SUSSEX | 4923 ft. | | N | N | SHANNON | 5069 ft. | | N | N | SHARON SPRINGS | 7315 ft. | | N | N | NIOBRARA | 7506 ft. | | N | N | FORT HAYS | 7888 ft. | | N | N | CODELL | 8016 ft. | | N | N | CARLILE | 12220 ft. | | | |
Formation CARL Formation Classification: OW Status: CM - 6/7/2019 Interval Top: 12220 ft. Interval Bottom: 12358 ft. Completed Information for Formation CARLILE | 1st Production Date: | 8/21/2018 | Choke Size: | | Formation Name: | CARLILE | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 6/7/2019 | Treatment End Date: | N/A | Treatment Summary: | Carlile Perforations: 12220-12358 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CARL. |
| Perforation Data: | Interval Top: | 12220 ft. | # Of Holes: | 1080 | Interval Bottom: | 12358 ft. | Hole Size: | 0.36 in. |
|
Formation FTHYS Formation Classification: OW Status: CM - 6/7/2019 Interval Top: 11614 ft. Interval Bottom: 12640 ft. Completed Information for Formation FORT HAYS | 1st Production Date: | 8/21/2018 | Choke Size: | | Formation Name: | FORT HAYS | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 6/7/2019 | Treatment End Date: | N/A | Treatment Summary: | Fort Hayes perforationss 11,614-11,649, 12,359-12,640 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation FTHYS. |
| Perforation Data: | Interval Top: | 11614 ft. | # Of Holes: | 1080 | Interval Bottom: | 12640 ft. | Hole Size: | 0.36 in. |
|
Formation CLCDFH Formation Classification: OW Status: PR - 4/28/2018 Interval Top: 8145 ft. Interval Bottom: 14615 ft. Completed Information for Formation CARLILE-CODELL-FORT HAYS | 1st Production Date: | 8/21/2018 | Choke Size: | | Formation Name: | CARLILE-CODELL-FORT HAYS | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 3/19/2018 | Treatment End Date: | 4/2/2018 | Treatment Summary: | 330, 561 bbls FR water, 10040 bbls treated water, 178 bbls Brine, 21967 gallons of FDP water, 127 bbls 7.5% HCI Acid, 2,002,569 lbs of 100 mesh, 6,226,516 lbs of White 40/70, 1,267,347 lbs of white 30/50 and 89,020 lbs of 40/70 CRC.
Flowback volume is measured by strapping flowback tank every hour during initial flowback and from tank gauges during permanent facility flowback.
| Total fluid used in treatment (bbls): | 362873 | Max pressure during treatment (psi): | 8988 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 45 | Total acid used in treatment (bbls): | 127 | Min frac gradient (psi/ft): | 0.94 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 8171 | Fresh water used in treatment (bbls): | 362746 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 9585452 | Green completions techniques utilized: | No | Reason green techniques Not utilized: PIPELINE |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/28/2018 | Test Method: | Flowback | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | FLARED | |
Test Type | Measure |
---|
BBLS_H2O | 2016 | BBLS_OIL | 864 | BTU_GAS | 1338 | CALC_BBLS_H2O | 2016 | CALC_BBLS_OIL | 864 | CALC_GOR | 933 | CALC_MCF_GAS | 806 | CASING_PRESS | 2500 | GRAVITY_OIL | 39 | MCF_GAS | 806 |
| Perforation Data: | Interval Top: | 8145 ft. | # Of Holes: | 1080 | Interval Bottom: | 14615 ft. | Hole Size: | 0.36 in. |
|
Formation CODL Formation Classification: OW Status: CM - 6/7/2019 Interval Top: 8145 ft. Interval Bottom: 14615 ft. Completed Information for Formation CODELL | 1st Production Date: | 8/21/2018 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 6/7/2019 | Treatment End Date: | N/A | Treatment Summary: | Codell perforations: 8145-11613, 11650-12219, 12641-14615 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 8145 ft. | # Of Holes: | 1080 | Interval Bottom: | 14615 ft. | Hole Size: | 0.36 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 5090 |
Total Gas Produced (MCF) | 52250 |
GOR | 10265 |
GOR Determination | BOE |
Average BOE per Day | 38.549 |
Average MCFE per Day | 223.579 |
Federal Financial Assurance | i | |
|
|