Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-44515
Well Classification: OW Status: PR - 3/2/2025
Well Name/No:Braskaland #A18-764
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/2/2025
FacilityID:449774LocationID:483509
County:WELD #123Location:NWNW 7 6N64W 6
Field:WATTENBERG - #90750Elevation:4724 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:755FNL  319 FWLLat/Long: 40.505554 / -104.600492Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.505566 / -104.600504Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/20/2024
End Date: 1/26/2025
Reported: 3/11/2025
Days to report: 44
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 3/2/2025             Measured TD: 17779 ft.    Vertical TD: 6916 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 3/2/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/24/2030
Proposed Top PZ Location:Sec:7 Twp: 6N 64W Footage: 200 FNL  1757 FWL
Bottom Hole Location:Sec:18 Twp: 6N 64W Footage: 200 FSL  1703 FWL
Proposed Depth/Form:17803 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-3384 , Unit Acreage: 1223, Drill Unit: T6N-R64W, 6th P.M.,
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 36.94 , Citings Type: PLANNED
Cement:Sacks: 175, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1949 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 665, Top: 0 ft., Bottom: 1949 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17771 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2072, Top: , Bottom: 17771 ft.

Wellbore Completed
Completion Date:4/4/2024
Spud Date:3/19/2024Spud Date Is:ACTUAL
Measured TD:17779 ft.Measured PB depth:17761 ft.
True Vertical TD:6916 ft.True Vertical PB depth:6916 ft.
Top PZ Location:Sec:7 Twp: 6N 64WFootage: 203 FNL  1786 FWL
Bottom Hole Location:Sec:18 Twp: 6N 64WFootage: 200 FSL  1683 FWL
Log Types:CBL, MWD/LWD, (IND-GR in 123-14166, IND-GR in 123-20207)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 109 ft., Weight: 45 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 109 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2064 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 717, Top: 0 ft., Bottom: 2064 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17768 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 2083, Top: 622 ft., Bottom: 17768 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3758 ft.
SUSSEX4390 ft.
SHANNON5231 ft.
SHARON SPRINGS7113 ft.
NIOBRARA7149 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  WO - 12/1/2025                 Interval Top: 7632 ft.    Interval Bottom: 17736 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/22/2025Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:12/20/2024Treatment End Date:1/26/2025
Treatment Summary:Niobrara completed with 870 bbls 28% HCL, 520,875 bbls slurry, 24,161,838 lb 40/140.
Total fluid used in treatment (bbls):521745Max pressure during treatment (psi):8482
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:48
Total acid used in treatment (bbls):870Min frac gradient (psi/ft):0.96
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):520875Disposition method For flowback:DISPOSAL
Total proppant used (lbs):24161838Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7449 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/2/2025Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 994
BBLS_OIL 150
BTU_GAS 1293
CALC_BBLS_H2O 994
CALC_BBLS_OIL 150
CALC_GOR 1440
CALC_MCF_GAS 216
CASING_PRESS 2657
GRAVITY_OIL 42
MCF_GAS 216
TUBING_PRESS 1625
Perforation Data:
Interval Top:7632 ft.# Of Holes:987
Interval Bottom:17736 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)103224
Total Gas Produced (MCF)391465
GOR3792
GOR DeterminationBOE
Average BOE per Day464.235
Average MCFE per Day2692.562

 Federal Financial Assurance  i 

 Tribal Well  i No