Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-44510
Well Classification: OW Status: PR - 3/2/2025
Well Name/No:Braskaland #A06-773
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/2/2025
FacilityID:449769LocationID:483509
County:WELD #123Location:NWNW 7 6N64W 6
Field:WATTENBERG - #90750Elevation:4724 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:687FNL  319 FWLLat/Long: 40.505739 / -104.600490Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.505745 / -104.600505Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/20/2024
End Date: 1/26/2025
Reported: 3/11/2025
Days to report: 44
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 3/2/2025             Measured TD: 17580 ft.    Vertical TD: 6924 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 3/2/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/24/2030
Proposed Top PZ Location:Sec:6 Twp: 6N 64W Footage: 200 FSL  1091 FWL
Bottom Hole Location:Sec:31 Twp: 7N 64W Footage: 200 FNL  1121 FWL
Proposed Depth/Form:17492 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-3384 , Unit Acreage: 1865, Drill Unit: Township 6 North, Ra
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 36.94 , Citings Type: PLANNED
Cement:Sacks: 175, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1950 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 640, Top: 0 ft., Bottom: 1950 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17538 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2036, Top: , Bottom: 17538 ft.

Wellbore Completed
Completion Date:4/15/2024
Spud Date:3/21/2024Spud Date Is:ACTUAL
Measured TD:17580 ft.Measured PB depth:17556 ft.
True Vertical TD:6924 ft.True Vertical PB depth:6924 ft.
Top PZ Location:Sec:6 Twp: 6N 64WFootage: 230 FSL  1065 FWL
Bottom Hole Location:Sec:31 Twp: 7N 64WFootage: 204 FNL  1089 FWL
Log Types:CBL, MWD/LWD, (IND-GR in 123-14166, IND-GR in 123-20207)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 109 ft., Weight: 45 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 109 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2059 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 717, Top: 0 ft., Bottom: 2059 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17563 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 2056, Top: 1850 ft., Bottom: 17563 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3622 ft.
SUSSEX4211 ft.
SHANNON4990 ft.
SHARON SPRINGS6795 ft.
NIOBRARA6835 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  WO - 2/1/2026                  Interval Top: 7436 ft.    Interval Bottom: 17529 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/23/2025Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:12/20/2024Treatment End Date:1/26/2025
Treatment Summary:Niobrara completed with 935 bbls 28% HCL, 508,446 bbls slurry, 23,551,003 lb 40/140.
Total fluid used in treatment (bbls):509381Max pressure during treatment (psi):8492
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:48
Total acid used in treatment (bbls):935Min frac gradient (psi/ft):0.93
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):508446Disposition method For flowback:DISPOSAL
Total proppant used (lbs):23551003Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6925 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/2/2025Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1129
BBLS_OIL 164
BTU_GAS 1293
CALC_BBLS_H2O 1129
CALC_BBLS_OIL 164
CALC_GOR 2043
CALC_MCF_GAS 335
CASING_PRESS 1065
GRAVITY_OIL 42
MCF_GAS 335
TUBING_PRESS 1689
Perforation Data:
Interval Top:7436 ft.# Of Holes:1019
Interval Bottom:17529 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)142396
Total Gas Produced (MCF)474369
GOR3331
GOR DeterminationBOE
Average BOE per Day610.652
Average MCFE per Day3541.764

 Federal Financial Assurance  i 

 Tribal Well  i No