Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-44422
Well Classification: OW Status: PR - 10/24/2019
Well Name/No:VT-LDS #C2-16-18
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/24/2019
FacilityID:449628LocationID:322888
County:WELD #123Location:SWNW 15 5N65W 6
Field:WATTENBERG - #90750Elevation:4647 ft.
Planned Location:1886FNL  626 FWLLat/Long: 40.401310 / -104.656630Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.401312 / -104.656631Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/27/2019
End Date: 6/5/2019
Reported: 7/15/2019
Days to report: 40
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 10/24/2019             Measured TD: 20580 ft.    Vertical TD: 7026 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 10/24/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/10/2019
Prop Depth/Form:20659 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 800, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 20659 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1976, Top: 1500 ft., Bottom: 20659 ft.

Wellbore Completed
Completion Date:6/27/2018
Spud Date:5/23/2018Spud Date Is:ACTUAL
Measured TD:20580 ft.Measured PB depth:20570 ft.
True Vertical TD:7026 ft.True Vertical PB depth:7026 ft.
Top PZ Location:Sec:16 Twp: 5N 65WFootage: 909 FNL  2146 FWLDepth
Bottom Hole Location:Sec:18 Twp: 5N 65WFootage: 822 FNL  495 FWLDepth
Log Types:CBL, Mud Log, MWD/LWD, Triple Combination.
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1552 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 675, Top: 0 ft., Bottom: 1553 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 20575 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 3280, Top: 166 ft., Bottom: 20580 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3955 ft.NN
SUSSEX4536 ft.NN
SHARON SPRINGS7660 ft.NN
NIOBRARA7749 ft.NN
FORT HAYS8237 ft.NN
CODELL8345 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 11/25/2019                Interval Top: 16994 ft.    Interval Bottom: 17646 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/14/2019Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/27/2019Treatment End Date:6/5/2019
Treatment Summary:Perforated Interval: 16994'-17646'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:16994 ft.# Of Holes:81
Interval Bottom:17646 ft.Hole Size:0.38 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 11/25/2019                Interval Top: 16609 ft.    Interval Bottom: 16971 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:10/14/2019Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/27/2019Treatment End Date:6/5/2019
Treatment Summary:Perfoated Interval: 16609'-16971'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:16609 ft.# Of Holes:45
Interval Bottom:16971 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 11/25/2019                Interval Top: 8371 ft.    Interval Bottom: 20525 ft.

 Completed Information for Formation CODELL
1st Production Date:10/14/2019Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/27/2019Treatment End Date:6/5/2019
Treatment Summary:Perforated Intervals: 8371'-16586'; 17669'-20525'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8371 ft.# Of Holes:1315
Interval Bottom:20525 ft.Hole Size:0.38 in.

Formation NBFHC                   Formation Classification:  OW                   Status:  PR - 10/24/2019                Interval Top: 8371 ft.    Interval Bottom: 20525 ft.

 Completed Information for Formation NIOBRARA-FT HAYS-CODELL
1st Production Date:10/14/2019Choke Size: 
Formation Name:NIOBRARA-FT HAYS-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/27/2019Treatment End Date:6/5/2019
Treatment Summary:Frac'd Niobrara-Fort Hays-Codell with 49-stage plug-and-perf; 133101 total bbls fluid pumped: 114036 bbls gelled fluid and 19065 bbls fresh water; 9800035 total lbs proppant pumped: 409200 lbs 40/70 mesh and 9390835 lbs 30/50 mesh.
Total fluid used in treatment (bbls):133101Max pressure during treatment (psi):9283
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:49
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.96
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):13604
Fresh water used in treatment (bbls):19065Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9800035Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8249 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/24/2019Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 98
BBLS_OIL 515
BTU_GAS 1280
CALC_BBLS_H2O 98
CALC_BBLS_OIL 515
CALC_GOR 7062
CALC_MCF_GAS 3637
CASING_PRESS 3161
GRAVITY_OIL 51
MCF_GAS 3637
TUBING_PRESS 2809
Perforation Data:
Interval Top:8371 ft.# Of Holes:1441
Interval Bottom:20525 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2023 - September 2024i
Total Oil Produced (Barrels)10317
Total Gas Produced (MCF)261903
GOR25385
GOR DeterminationMCFE
Average BOE per Day151.657
Average MCFE per Day879.620

 Federal Financial Assurance  i 

 Tribal Well  i No