Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-44368
Well Classification: OW Status: PR - 1/1/2024
Well Name/No:Ottesen LE #09-362HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/1/2024
FacilityID:449550LocationID:449521
County:WELD #123Location:NWSE 33 1N66W 6
Field:WATTENBERG - #90750Elevation:5085 ft.
Planned Location:1510FSL  1323 FELLat/Long: 40.004600 / -104.777414Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.004603 / -104.777415Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/8/2019
End Date: 2/19/2019
Reported: 3/28/2019
Days to report: 37
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 1/1/2024             Measured TD: 18081 ft.    Vertical TD: 7685 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 1/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/5/2019
Proposed Top PZ Location:Sec:4 Twp: 1S 66W Footage: 460 FNL  515 FEL
Bottom Hole Location:Sec:9 Twp: 1S 66W Footage: 370 FSL  515 FEL
Proposed Depth/Form:17885 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-1842 , Unit Acreage: 1280, Drill Unit: All: Sec 4, Sec 9
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 707, Top: 0 ft., Bottom: 1700 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17878 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1510, Top: , Bottom: 17878 ft.

Wellbore Completed
Completion Date:1/23/2019
Spud Date:10/27/2018Spud Date Is:ACTUAL
Measured TD:18081 ft.Measured PB depth:18070 ft.
True Vertical TD:7685 ft.True Vertical PB depth:7685 ft.
Top PZ Location:Sec:4 Twp: 1S 66WFootage: 568 FNL  525 FEL
Bottom Hole Location:Sec:9 Twp: 1S 66WFootage: 192 S  533 E
Log Types:Mud, MWD/LWD, CBL (Composite in 123-44337)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1766 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 769, Top: 0 ft., Bottom: 1766 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18081 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1915, Top: 4380 ft., Bottom: 18081 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4505 ft.4688 ft.NN
SUSSEX4932 ft.5156 ft.NN
SHANNON5669 ft.5849 ft.NN
SHARON SPRINGS7573 ft.NN
NIOBRARA7693 ft.NN
FORT HAYS8306 ft.NN
CODELL8354 ft.NN
CARLILE8442 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 10/18/2019                Interval Top: 8794 ft.    Interval Bottom: 17741 ft.

 Completed Information for Formation CODELL
1st Production Date:3/28/2019Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/18/2019Treatment End Date:N/A
Treatment Summary:8794-13795'; 15106-17741'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8794 ft.# Of Holes:1380
Interval Bottom:17741 ft.Hole Size:0.38 in.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 10/18/2019                Interval Top: 8594 ft.    Interval Bottom: 15069 ft.

 Completed Information for Formation CARLILE
1st Production Date:3/28/2019Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/18/2019Treatment End Date:N/A
Treatment Summary:8594-8746;13831-15069
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:8594 ft.# Of Holes:1380
Interval Bottom:15069 ft.Hole Size:0.38 in.

Formation CD-CRL                 Formation Classification:  OW                 Status:  PR - 1/1/2024                  Interval Top: 8594 ft.    Interval Bottom: 17741 ft.

 Completed Information for Formation CODELL-CARLILE
1st Production Date:3/28/2019Choke Size: 
Formation Name:CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/8/2019Treatment End Date:2/19/2019
Treatment Summary:481,735# 100 Mesh Sand; 8,701,756# 20/40 Sand; 164,026 bbls gelled fluid; Flowback determined from well test separator.
Total fluid used in treatment (bbls):164026Max pressure during treatment (psi):4385
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:46
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.91
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):15711
Fresh water used in treatment (bbls):164026Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9183491Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8222 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/30/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 510
BBLS_OIL 380
BTU_GAS 1414
CALC_BBLS_H2O 510
CALC_BBLS_OIL 380
CALC_GOR 856
CALC_MCF_GAS 325
CASING_PRESS 2300
GRAVITY_OIL 42
MCF_GAS 325
TUBING_PRESS 1550
Perforation Data:
Interval Top:8594 ft.# Of Holes:1380
Interval Bottom:17741 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)11374
Total Gas Produced (MCF)46423
GOR4081
GOR DeterminationBOE
Average BOE per Day53.116
Average MCFE per Day308.069

 Federal Financial Assurance  i 

 Tribal Well  i No