Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-44351
Well Classification: OW Status: PR - 1/1/2024
Well Name/No:Ottesen LE #09-365HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/1/2024
FacilityID:449533LocationID:449521
County:WELD #123Location:NWSE 33 1N66W 6
Field:WATTENBERG - #90750Elevation:5082 ft.
Planned Location:1510FSL  1383 FELLat/Long: 40.004600 / -104.777628Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.004605 / -104.777630Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/6/2019
End Date: 2/19/2019
Reported: 3/28/2019
Days to report: 37
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 1/1/2024             Measured TD: 17995 ft.    Vertical TD: 7682 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 1/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:10/24/2020
Proposed Top PZ Location:Sec:4 Twp: 1S 66W Footage: 460 FNL  1219 FEL
Bottom Hole Location:Sec:9 Twp: 1S 66W Footage: 370 FSL  1225 FEL
Proposed Depth/Form:17791 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-1842 , Unit Acreage: 1244, Drill Unit: S4: All, S9: All
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 707, Top: 0 ft., Bottom: 1700 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17791 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1508, Top: , Bottom: 17791 ft.

Wellbore Completed
Completion Date:1/3/2019
Spud Date:10/29/2018Spud Date Is:ACTUAL
Measured TD:17995 ft.Measured PB depth:17985 ft.
True Vertical TD:7682 ft.True Vertical PB depth:7682 ft.
Top PZ Location:Sec:4 Twp: 1S 66WFootage: 567 FNL  1196 FEL
Bottom Hole Location:Sec:09 Twp: 1S 66WFootage: 197 S  1215 E
Log Types:Mud, MWD/LWD, CBL (Composite in 123-44337)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1771 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 799, Top: 0 ft., Bottom: 1771 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17995 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1885, Top: 5290 ft., Bottom: 17995 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4461 ft.4638 ft.NN
SUSSEX4847 ft.5082 ft.NN
SHANNON5718 ft.5894 ft.NN
SHARON SPRINGS7468 ft.NN
NIOBRARA7608 ft.NN
FORT HAYS8197 ft.NN
CODELL8286 ft.NN
CARLILE8473 ft.NN

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 10/18/2019                Interval Top: 9312 ft.    Interval Bottom: 10313 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:3/31/2019Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/18/2019Treatment End Date:N/A
Treatment Summary:9312-9513; 9586-9713; 9949-10313
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:9312 ft.# Of Holes:1380
Interval Bottom:10313 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 10/18/2019                Interval Top: 8785 ft.    Interval Bottom: 17660 ft.

 Completed Information for Formation CODELL
1st Production Date:3/31/2019Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/18/2019Treatment End Date:N/A
Treatment Summary:8785-9264; 9549-9550; 9749-9913; 10349-11826; 12586-17660
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8785 ft.# Of Holes:1380
Interval Bottom:17660 ft.Hole Size:0.38 in.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 10/18/2019                Interval Top: 8512 ft.    Interval Bottom: 12550 ft.

 Completed Information for Formation CARLILE
1st Production Date:3/31/2019Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/18/2019Treatment End Date:N/A
Treatment Summary:8512-8750; 11862-12550
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:8512 ft.# Of Holes:1380
Interval Bottom:12550 ft.Hole Size:0.38 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 1/1/2024                  Interval Top: 8512 ft.    Interval Bottom: 17660 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:3/31/2019Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/6/2019Treatment End Date:2/19/2019
Treatment Summary:504,547# 100 Mesh Sand; 8,652,735# 20/40 Sand; 161,676 bbls gelled fluid; Flowback determined from well test separator.
Total fluid used in treatment (bbls):161676Max pressure during treatment (psi):4458
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:46
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.90
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):26307
Fresh water used in treatment (bbls):161676Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9157282Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8124 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/2/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 400
BBLS_OIL 205
BTU_GAS 1414
CALC_BBLS_H2O 400
CALC_BBLS_OIL 205
CALC_GOR 517
CALC_MCF_GAS 106
CASING_PRESS 2300
GRAVITY_OIL 42
MCF_GAS 106
TUBING_PRESS 1700
Perforation Data:
Interval Top:8512 ft.# Of Holes:1380
Interval Bottom:17660 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)7683
Total Gas Produced (MCF)61971
GOR8065
GOR DeterminationBOE
Average BOE per Day50.334
Average MCFE per Day291.945

 Federal Financial Assurance  i 

 Tribal Well  i No