Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-44136
Well Classification: OW Status: PR - 1/1/2026
Well Name/No:Goetzel #30C-30-M
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/1/2026
FacilityID:449078LocationID:449015
County:WELD #123Location:SWNE 29 6N66W 6
Field:WATTENBERG - #90750Elevation:4729 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1833FNL  2445 FELLat/Long: 40.461283 / -104.801183Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.461282 / -104.801184Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/15/2017
End Date: 6/22/2017
Reported: 9/1/2017
Days to report: 71
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 1/1/2026             Measured TD: 15711 ft.    Vertical TD: 7083 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 1/1/2026
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:1/30/2019
Proposed Top PZ Location:Sec:29 Twp: 6N 66W Footage: 299 FNL  2592 FWL
Bottom Hole Location:Sec:30 Twp: 6N 66W Footage: 307 FNL  510 FWL
Proposed Depth/Form:15694 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 590, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 65 , Citings Type: PLANNED
Cement:Sacks: 70, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 464, Top: 0 ft., Bottom: 1700 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 15694 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1964, Top: 0 ft., Bottom: 15694 ft.

Wellbore Completed
Completion Date:4/1/2017
Spud Date:2/25/2017Spud Date Is:ACTUAL
Measured TD:15711 ft.Measured PB depth:15650 ft.
True Vertical TD:7083 ft.True Vertical PB depth:7084 ft.
Top PZ Location:Sec:29 Twp: 6N 66WFootage: 289 FNL  2499 FWL
Bottom Hole Location:Sec:30 Twp: 6N 66WFootage: 310 FNL  402 FWL
Log Types:MWD, CBL, Mud, Resistivity
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 55 , Citings Type: ACTUAL
Cement:Sacks: 35, Top: 0 ft., Bottom: 40 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1741 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 700, Top: 0 ft., Bottom: 1741 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 15695 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2075, Top: 0 ft., Bottom: 15695 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3625 ft.NN
SUSSEX4180 ft.NN
SHANNON4825 ft.NN
SHARON SPRINGS6951 ft.NN
NIOBRARA6993 ft.NN
FORT HAYS7509 ft.NN
CODELL7602 ft.NN
CARLILE9800 ft.NN

Formation CARL                     Formation Classification:  OW                     Status:  CM - 5/25/2018                 Interval Top: 9800 ft.    Interval Bottom: 10923 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:5/25/2018Treatment End Date:N/A
Treatment Summary:Producing Interval: 9800'-10923'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:9800 ft.# Of Holes:1332
Interval Bottom:10923 ft.Hole Size:0.46 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 5/25/2018                 Interval Top: 8486 ft.    Interval Bottom: 8699 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:5/25/2018Treatment End Date:N/A
Treatment Summary:Producing Interval: 8486'-8699'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8486 ft.# Of Holes:1332
Interval Bottom:8699 ft.Hole Size:0.46 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 1/1/2026                  Interval Top: 7777 ft.    Interval Bottom: 15524 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:8/22/2017Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/15/2017Treatment End Date:6/22/2017
Treatment Summary:Plug and perf completion type. 37 stages; 191780 total bbls fluid pumped: 191720 bbls slickwater and gel, 60 bbls 15% HCL acid; 6526302 lbs. proppant (100+40/70+30/50 white sand) pumped.
Total fluid used in treatment (bbls):191780Max pressure during treatment (psi):7930
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:37
Total acid used in treatment (bbls):60Min frac gradient (psi/ft):0.87
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):28873
Fresh water used in treatment (bbls):191720Disposition method For flowback:DISPOSAL
Total proppant used (lbs):6526302Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7242 ft.
Tubing Packer Depth:7220 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/7/2017Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 275
BBLS_OIL 592
BTU_GAS 1330
CALC_BBLS_H2O 275
CALC_BBLS_OIL 592
CALC_GOR 1699
CALC_MCF_GAS 1006
GRAVITY_OIL 48
MCF_GAS 1006
TUBING_PRESS 1542
Perforation Data:
Interval Top:7777 ft.# Of Holes:1332
Interval Bottom:15524 ft.Hole Size:0.46 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 5/25/2018                 Interval Top: 7777 ft.    Interval Bottom: 15524 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:5/25/2018Treatment End Date:N/A
Treatment Summary:Producing Intervals: 7777'-8486'; 8699'-9800'; 10923'-15524'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7777 ft.# Of Holes:1332
Interval Bottom:15524 ft.Hole Size:0.46 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No