Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-43811
Well Classification: OW Status: PR - 10/1/2022
Well Name/No:BABCOCK #32N-33HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/1/2022
FacilityID:448225LocationID:330811
Municipality/County:FIRESTONE / WELD #123Location:SENW 4 2N67W 6
Field:WATTENBERG - #90750Elevation:4885 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2138FNL  1950 FWLLat/Long: 40.169184 / -104.897427Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.169186 / -104.897426Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/2/2017
End Date: 12/7/2017
Reported: 1/19/2018
Days to report: 43
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 10/1/2022             Measured TD: 12378 ft.    Vertical TD: 7241 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 10/1/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:10/30/2018
Proposed Top PZ Location:Sec:4 Twp: 2N 67W Footage: 2342 FNL  269 FWL
Bottom Hole Location:Sec:33 Twp: 3N 67W Footage: 2160 FSL  247 FWL
Proposed Depth/Form:12449 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42.1 , Citings Type: PLANNED
Cement:Sacks: 30, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1800 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 710, Top: 0 ft., Bottom: 1800 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12439 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1455, Top: , Bottom: 12439 ft.

Wellbore Completed
Completion Date:6/30/2017
Spud Date:4/15/2017Spud Date Is:ACTUAL
Measured TD:12378 ft.Measured PB depth:12276 ft.
True Vertical TD:7241 ft.True Vertical PB depth:7246 ft.
Top PZ Location:Sec:4 Twp: 2N 67WFootage: 2273 FNL  255 FWL
Bottom Hole Location:Sec:33 Twp: 3N 67WFootage: 2124 FSL  242 FWL
Log Types:CBL, MWD, (CNL in 123-43809, RESISTIVITY in 123-19671)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 92 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 92 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1854 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 724, Top: 0 ft., Bottom: 1854 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12369 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1240, Top: 1226 ft., Bottom: 12369 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4277 ft.
SHANNON4819 ft.
SHARON SPRINGS7448 ft.
NIOBRARA7574 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 10/1/2022                 Interval Top: 7960 ft.    Interval Bottom: 12267 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:12/20/2017Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/19/2017Treatment End Date:12/7/2017
Treatment Summary:PERF AND FRAC FROM 7960-12267. 605 BBL 7.5% HCL ACID, 5,224 BBL PUMP DOWN, 147,926 BBL SLICKWATER, 153,755 TOTAL FLUID, 1,267,620# 40/70 OTTAWA/ST. PETERS, 1,267,620# TOTAL SAND.
Total fluid used in treatment (bbls):153755Max pressure during treatment (psi):7908
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:40
Total acid used in treatment (bbls):605Min frac gradient (psi/ft):0.92
Recycled water used in treatment (bbls):1200Total flowback volume recovered (bbls):3806
Fresh water used in treatment (bbls):151950Disposition method For flowback:RECYCLE
Total proppant used (lbs):1267620Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7561 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/1/2018Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 356
BBLS_OIL 548
BTU_GAS 1282
CALC_BBLS_H2O 356
CALC_BBLS_OIL 548
CALC_GOR 1097
CALC_MCF_GAS 601
CASING_PRESS 2019
GRAVITY_OIL 54
MCF_GAS 601
TUBING_PRESS 1236
Perforation Data:
Interval Top:7960 ft.# Of Holes:984
Interval Bottom:12267 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)1586
Total Gas Produced (MCF)48523
GOR30594
GOR DeterminationMCFE
Average BOE per Day27.186
Average MCFE per Day157.695

 Federal Financial Assurance  i 

 Tribal Well  i No