Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-43809
Well Classification: OW Status: PA - 3/27/2024
Well Name/No:BABCOCK #33C-33HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date3/27/2024
FacilityID:448223LocationID:330811
Municipality/County:FIRESTONE / WELD #123Location:SENW 4 2N67W 6
Field:WATTENBERG - #90750Elevation:4885 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2138FNL  1965 FWLLat/Long: 40.169184 / -104.897374Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.169191 / -104.897369Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/2/2017
End Date: 12/3/2017
Reported: 1/9/2018
Days to report: 37
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 3/27/2024             Measured TD: 12485 ft.    Vertical TD: 7397 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 3/27/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:10/30/2018
Proposed Top PZ Location:Sec:4 Twp: 2N 67W Footage: 2044 FNL  664 FWL
Bottom Hole Location:Sec:33 Twp: 3N 67W Footage: 2144 FSL  537 FWL
Proposed Depth/Form:12514 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42.1 , Citings Type: PLANNED
Cement:Sacks: 30, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1800 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 710, Top: 0 ft., Bottom: 1800 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12504 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1463, Top: , Bottom: 12504 ft.

Wellbore Completed
Completion Date:6/26/2017
Spud Date:4/17/2017Spud Date Is:ACTUAL
Measured TD:12485 ft.Measured PB depth:12385 ft.
True Vertical TD:7397 ft.True Vertical PB depth:7402 ft.
Top PZ Location:Sec:4 Twp: 2N 67WFootage: 2044 FNL  664 FWL
Bottom Hole Location:Sec:33 Twp: 3N 67WFootage: 2144 FSL  537 FWL
Log Types:CBL, MWD, CNL, (RESISTIVITY in 123-19671)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 101 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 101 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1841 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 719, Top: 0 ft., Bottom: 1841 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12477 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1250, Top: 950 ft., Bottom: 12477 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4277 ft.
SHANNON4819 ft.
SHARON SPRINGS7336 ft.
NIOBRARA7446 ft.
FORT HAYS7859 ft.
CODELL7938 ft.
CARLILE11750 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 3/1/2018                  Interval Top: 11761 ft.    Interval Bottom: 12376 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:3/1/2018Treatment End Date:N/A
Treatment Summary:Carlile: 11761-12376
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:11761 ft.# Of Holes:168
Interval Bottom:12376 ft.Hole Size:0.44 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 3/1/2018                  Interval Top: 11018 ft.    Interval Bottom: 11761 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/1/2018Treatment End Date:N/A
Treatment Summary:Fort Hays: 11018-11066, 11481-11761
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:11018 ft.# Of Holes:168
Interval Bottom:11761 ft.Hole Size:0.44 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  AB - 3/27/2024                 Interval Top: 8273 ft.    Interval Bottom: 12376 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:12/21/2017Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/19/2017Treatment End Date:12/3/2017
Treatment Summary:PERF AND FRAC FROM 8273-12376. 29 BBL 7.5% HCL ACID, 1,213 BBL PUMP DOWN, 46,500 BBL SLICKWATER, 47,742 TOTAL FLUID, 1,408,550# 40/70 OTTAWA/ST. PETERS, 1,408,550# TOTAL SAND.
Total fluid used in treatment (bbls):47742Max pressure during treatment (psi):7071
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:9
Total acid used in treatment (bbls):29Min frac gradient (psi/ft):0.90
Recycled water used in treatment (bbls):300Total flowback volume recovered (bbls):3806
Fresh water used in treatment (bbls):47413Disposition method For flowback:RECYCLE
Total proppant used (lbs):1408550Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7624 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/13/2018Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 145
BBLS_OIL 223
BTU_GAS 1282
CALC_BBLS_H2O 145
CALC_BBLS_OIL 223
CALC_GOR 1193
CALC_MCF_GAS 266
CASING_PRESS 2032
GRAVITY_OIL 54
MCF_GAS 266
TUBING_PRESS 1441
Perforation Data:
Interval Top:8273 ft.# Of Holes:168
Interval Bottom:12376 ft.Hole Size:0.44 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 3/1/2018                  Interval Top: 8273 ft.    Interval Bottom: 11481 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/1/2018Treatment End Date:N/A
Treatment Summary:Codell: 8273-11018, 11066-11481
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8273 ft.# Of Holes:168
Interval Bottom:11481 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY03/27/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2029
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No