|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 10/1/2022 Measured TD: 12279 ft. Vertical TD: 7223 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 10/1/2022 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 10/30/2018 | Proposed Top PZ Location: | Sec:4 Twp: 2N 67W | Footage: 2344 FNL 967 FWL | Bottom Hole Location: | Sec:33 Twp: 3N 67W | Footage: 2160 FSL 977 FWL | Proposed Depth/Form: | 12281 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42.1 , Citings Type: PLANNED | Cement: | Sacks: 30, Top: 0 ft., Bottom: 40 ft. | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1800 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 710, Top: 0 ft., Bottom: 1800 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12271 ft., Weight: 17 , Citings Type: PLANNED | Cement: | Sacks: 1435, Top: , Bottom: 12271 ft. |
| | |
Wellbore Completed | Completion Date: | 6/16/2017 | Spud Date: | 4/19/2017 | Spud Date Is: | ACTUAL | Measured TD: | 12279 ft. | Measured PB depth: | 12178 ft. | True Vertical TD: | 7223 ft. | True Vertical PB depth: | 7225 ft. | Top PZ Location: | Sec:4 Twp: 2N 67W | Footage: 2337 FNL 968 FWL | Bottom Hole Location: | Sec:33 Twp: 3N 67W | Footage: 2122 FSL 979 FWL | Log Types: | CBL, MWD, (CNL in 123-43809, RESISTIVITY in 123-19671) | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 101 ft., Weight: 42 , Citings Type: ACTUAL | Cement: | Sacks: 64, Top: 0 ft., Bottom: 101 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1830 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 711, Top: 0 ft., Bottom: 1830 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12270 ft., Weight: 17 , Citings Type: ACTUAL | Cement: | Sacks: 1230, Top: 1190 ft., Bottom: 12270 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4710 ft. | | | | SHANNON | 4750 ft. | | | | SHARON SPRINGS | 7327 ft. | | | | NIOBRARA | 7478 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 10/1/2022 Interval Top: 7802 ft. Interval Bottom: 12168 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 12/21/2017 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 10/21/2017 | Treatment End Date: | 12/1/2017 | Treatment Summary: | COMPLETED THROUGH AN OPEN HOLE LINER FROM 7802-12168. 151,944 BBL 7.5% HCL ACID, 5,621 BBL PUMP DOWN, 567 BBL SLICKWATER, 158,132 TOTAL FLUID, 1,316,052# 40/70 OTTAWA/ST. PETERS, 1,316,052# TOTAL SAND. | Total fluid used in treatment (bbls): | 158132 | Max pressure during treatment (psi): | 7685 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 41 | Total acid used in treatment (bbls): | 151945 | Min frac gradient (psi/ft): | 0.94 | Recycled water used in treatment (bbls): | 3600 | Total flowback volume recovered (bbls): | 3806 | Fresh water used in treatment (bbls): | 2588 | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 1316052 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7428 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 1/13/2018 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 861 | BBLS_OIL | 352 | BTU_GAS | 1282 | CALC_BBLS_H2O | 861 | CALC_BBLS_OIL | 352 | CALC_GOR | 1358 | CALC_MCF_GAS | 478 | CASING_PRESS | 1400 | GRAVITY_OIL | 54 | MCF_GAS | 478 | TUBING_PRESS | 1834 |
| Perforation Data: | Interval Top: | 7802 ft. | # Of Holes: | 984 | Interval Bottom: | 12168 ft. | Hole Size: | 0.44 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 830 |
Total Gas Produced (MCF) | 27329 |
GOR | 32926 |
GOR Determination | MCFE |
Average BOE per Day | 15.351 |
Average MCFE per Day | 89.026 |
Federal Financial Assurance | i | |
|
|