Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-43804
Well Classification: OW Status: PR - 10/1/2022
Well Name/No:BABCOCK #35C-33HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/1/2022
FacilityID:448218LocationID:330811
Municipality/County:FIRESTONE / WELD #123Location:SENW 4 2N67W 6
Field:WATTENBERG - #90750Elevation:4886 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2138FNL  2055 FWLLat/Long: 40.169182 / -104.897052Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.169184 / -104.897052Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/24/2017
End Date: 11/26/2017
Reported: 1/9/2018
Days to report: 44
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 10/1/2022             Measured TD: 12402 ft.    Vertical TD: 7384 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 10/1/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:10/30/2018
Proposed Top PZ Location:Sec:4 Twp: 2N 67W Footage: 2359 FNL  1360 FWL
Bottom Hole Location:Sec:33 Twp: 3N 67W Footage: 2166 FSL  1324 FWL
Proposed Depth/Form:12422 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 400, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42.1 , Citings Type: PLANNED
Cement:Sacks: 30, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1800 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 710, Top: 0 ft., Bottom: 1800 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12412 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1452, Top: , Bottom: 12412 ft.

Wellbore Completed
Completion Date:6/6/2017
Spud Date:4/20/2017Spud Date Is:ACTUAL
Measured TD:12402 ft.Measured PB depth:12300 ft.
True Vertical TD:7384 ft.True Vertical PB depth:7384 ft.
Top PZ Location:Sec:4 Twp: 2N 67WFootage: 2359 FNL  1360 FWL
Bottom Hole Location:Sec:33 Twp: 3N 67WFootage: 2166 FSL  1324 FWL
Log Types:CBL, MWD, (CNL in 123-43809, RESISTIVITY in 123-19671)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 101 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 101 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1872 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 729, Top: 0 ft., Bottom: 1872 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12392 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1240, Top: 1365 ft., Bottom: 12392 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4722 ft.
SHANNON4750 ft.
SHARON SPRINGS7258 ft.
NIOBRARA7350 ft.
FORT HAYS7769 ft.
CODELL8098 ft.
CARLILE8400 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 3/1/2018                  Interval Top: 8405 ft.    Interval Bottom: 12290 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/1/2018Treatment End Date:N/A
Treatment Summary:Carlile: 8405-8540, 10430-10630, 10637-10877, 12121-12290
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:8405 ft.# Of Holes:192
Interval Bottom:12290 ft.Hole Size:0.44 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 3/1/2018                  Interval Top: 8108 ft.    Interval Bottom: 12121 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/1/2018Treatment End Date:N/A
Treatment Summary:Codell: 8108-8405, 8540-10430, 10630-10637, 10877-12121
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8108 ft.# Of Holes:192
Interval Bottom:12121 ft.Hole Size:0.44 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 10/1/2022                 Interval Top: 7862 ft.    Interval Bottom: 12290 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:12/20/2017Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/24/2017Treatment End Date:11/26/2017
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 7862-12290. 48 BBL 7.5% HCL ACID, 1,252 BBL PUMP DOWN, 80,787 BBL SLICKWATER, 82,086 TOTAL FLUID, 2,457,398# 40/70 OTTAWA/ST. PETERS, 2,457,398# TOTAL SAND.
Total fluid used in treatment (bbls):82086Max pressure during treatment (psi):7275
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:10
Total acid used in treatment (bbls):48Min frac gradient (psi/ft):0.81
Recycled water used in treatment (bbls):750Total flowback volume recovered (bbls):3806
Fresh water used in treatment (bbls):81289Disposition method For flowback:RECYCLE
Total proppant used (lbs):2457398Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7560 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/19/2018Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 339
BBLS_OIL 194
BTU_GAS 1282
CALC_BBLS_H2O 339
CALC_BBLS_OIL 194
CALC_GOR 1103
CALC_MCF_GAS 214
CASING_PRESS 2025
GRAVITY_OIL 54
MCF_GAS 214
TUBING_PRESS 1191
Perforation Data:
Interval Top:7862 ft.# Of Holes:192
Interval Bottom:12290 ft.Hole Size:0.44 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 3/1/2018                  Interval Top: 7862 ft.    Interval Bottom: 8108 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/1/2018Treatment End Date:N/A
Treatment Summary:Fort Hays: 7862-8108
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:7862 ft.# Of Holes:192
Interval Bottom:8108 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)2238
Total Gas Produced (MCF)54152
GOR24196
GOR DeterminationMCFE
Average BOE per Day31.620
Average MCFE per Day183.394

 Federal Financial Assurance  i 

 Tribal Well  i No