|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 10/1/2022 Measured TD: 12402 ft. Vertical TD: 7384 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 10/1/2022 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 10/30/2018 | Proposed Top PZ Location: | Sec:4 Twp: 2N 67W | Footage: 2359 FNL 1360 FWL | Bottom Hole Location: | Sec:33 Twp: 3N 67W | Footage: 2166 FSL 1324 FWL | Proposed Depth/Form: | 12422 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 400, Drill Unit: GWA | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42.1 , Citings Type: PLANNED | Cement: | Sacks: 30, Top: 0 ft., Bottom: 40 ft. | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1800 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 710, Top: 0 ft., Bottom: 1800 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12412 ft., Weight: 17 , Citings Type: PLANNED | Cement: | Sacks: 1452, Top: , Bottom: 12412 ft. |
| | |
Wellbore Completed | Completion Date: | 6/6/2017 | Spud Date: | 4/20/2017 | Spud Date Is: | ACTUAL | Measured TD: | 12402 ft. | Measured PB depth: | 12300 ft. | True Vertical TD: | 7384 ft. | True Vertical PB depth: | 7384 ft. | Top PZ Location: | Sec:4 Twp: 2N 67W | Footage: 2359 FNL 1360 FWL | Bottom Hole Location: | Sec:33 Twp: 3N 67W | Footage: 2166 FSL 1324 FWL | Log Types: | CBL, MWD, (CNL in 123-43809, RESISTIVITY in 123-19671) | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 101 ft., Weight: 42 , Citings Type: ACTUAL | Cement: | Sacks: 64, Top: 0 ft., Bottom: 101 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1872 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 729, Top: 0 ft., Bottom: 1872 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12392 ft., Weight: 17 , Citings Type: ACTUAL | Cement: | Sacks: 1240, Top: 1365 ft., Bottom: 12392 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4722 ft. | | | | SHANNON | 4750 ft. | | | | SHARON SPRINGS | 7258 ft. | | | | NIOBRARA | 7350 ft. | | | | FORT HAYS | 7769 ft. | | | | CODELL | 8098 ft. | | | | CARLILE | 8400 ft. | | | |
Formation CARL Formation Classification: OW Status: CM - 3/1/2018 Interval Top: 8405 ft. Interval Bottom: 12290 ft. Completed Information for Formation CARLILE | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CARLILE | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 3/1/2018 | Treatment End Date: | N/A | Treatment Summary: | Carlile: 8405-8540, 10430-10630, 10637-10877, 12121-12290 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CARL. |
| Perforation Data: | Interval Top: | 8405 ft. | # Of Holes: | 192 | Interval Bottom: | 12290 ft. | Hole Size: | 0.44 in. |
|
Formation CODL Formation Classification: OW Status: CM - 3/1/2018 Interval Top: 8108 ft. Interval Bottom: 12121 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 3/1/2018 | Treatment End Date: | N/A | Treatment Summary: | Codell: 8108-8405, 8540-10430, 10630-10637, 10877-12121 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 8108 ft. | # Of Holes: | 192 | Interval Bottom: | 12121 ft. | Hole Size: | 0.44 in. |
|
Formation CLCDFH Formation Classification: OW Status: PR - 10/1/2022 Interval Top: 7862 ft. Interval Bottom: 12290 ft. Completed Information for Formation CARLILE-CODELL-FORT HAYS | 1st Production Date: | 12/20/2017 | Choke Size: | | Formation Name: | CARLILE-CODELL-FORT HAYS | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 11/24/2017 | Treatment End Date: | 11/26/2017 | Treatment Summary: | COMPLETED THROUGH AN OPEN HOLE LINER FROM 7862-12290. 48 BBL 7.5% HCL ACID, 1,252 BBL PUMP DOWN, 80,787 BBL SLICKWATER, 82,086 TOTAL FLUID, 2,457,398# 40/70 OTTAWA/ST. PETERS, 2,457,398# TOTAL SAND. | Total fluid used in treatment (bbls): | 82086 | Max pressure during treatment (psi): | 7275 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 10 | Total acid used in treatment (bbls): | 48 | Min frac gradient (psi/ft): | 0.81 | Recycled water used in treatment (bbls): | 750 | Total flowback volume recovered (bbls): | 3806 | Fresh water used in treatment (bbls): | 81289 | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 2457398 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7560 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 1/19/2018 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 339 | BBLS_OIL | 194 | BTU_GAS | 1282 | CALC_BBLS_H2O | 339 | CALC_BBLS_OIL | 194 | CALC_GOR | 1103 | CALC_MCF_GAS | 214 | CASING_PRESS | 2025 | GRAVITY_OIL | 54 | MCF_GAS | 214 | TUBING_PRESS | 1191 |
| Perforation Data: | Interval Top: | 7862 ft. | # Of Holes: | 192 | Interval Bottom: | 12290 ft. | Hole Size: | 0.44 in. |
|
Formation FTHYS Formation Classification: OW Status: CM - 3/1/2018 Interval Top: 7862 ft. Interval Bottom: 8108 ft. Completed Information for Formation FORT HAYS | 1st Production Date: | N/A | Choke Size: | | Formation Name: | FORT HAYS | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 3/1/2018 | Treatment End Date: | N/A | Treatment Summary: | Fort Hays: 7862-8108 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation FTHYS. |
| Perforation Data: | Interval Top: | 7862 ft. | # Of Holes: | 192 | Interval Bottom: | 8108 ft. | Hole Size: | 0.44 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 2866 |
Total Gas Produced (MCF) | 64814 |
GOR | 22614 |
GOR Determination | MCFE |
Average BOE per Day | 38.048 |
Average MCFE per Day | 220.659 |
Federal Financial Assurance | i | |
|
|