Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-43802
Well Classification: OW Status: PA - 3/27/2024
Well Name/No:BABCOCK #14C-33HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date3/27/2024
FacilityID:448216LocationID:330811
Municipality/County:FIRESTONE / WELD #123Location:SENW 4 2N67W 6
Field:WATTENBERG - #90750Elevation:4886 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2137FNL  2130 FWLLat/Long: 40.169181 / -104.896783Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.169181 / -104.896782Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/14/2017
End Date: 11/15/2017
Reported: 1/9/2018
Days to report: 55
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 3/27/2024             Measured TD: 12356 ft.    Vertical TD: 7378 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 3/27/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:10/30/2018
Proposed Top PZ Location:Sec:4 Twp: 2N 67W Footage: 2342 FNL  2168 FWL
Bottom Hole Location:Sec:33 Twp: 3N 67W Footage: 2176 FSL  2202 FWL
Proposed Depth/Form:12401 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42.1 , Citings Type: PLANNED
Cement:Sacks: 30, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1800 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 710, Top: 0 ft., Bottom: 1800 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12391 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1449, Top: , Bottom: 12391 ft.

Wellbore Completed
Completion Date:5/25/2017
Spud Date:4/23/2017Spud Date Is:ACTUAL
Measured TD:12356 ft.Measured PB depth:12253 ft.
True Vertical TD:7378 ft.True Vertical PB depth:7377 ft.
Top PZ Location:Sec:4 Twp: 2N 67WFootage: 1792 FNL  2232 FWL
Bottom Hole Location:Sec:33 Twp: 3N 67WFootage: 2159 FSL  2242 FWL
Log Types:CBL, MWD, (CNL in 123-43809, RESISTIVITY in 123-19671)
Casing:String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 100 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1882 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 731, Top: 0 ft., Bottom: 1882 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12347 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1240, Top: 880 ft., Bottom: 12347 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4690 ft.
SHANNON4750 ft.
SHARON SPRINGS7203 ft.
NIOBRARA7326 ft.
FORT HAYS7766 ft.
CODELL7881 ft.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 2/26/2018                 Interval Top: 8770 ft.    Interval Bottom: 8829 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/26/2018Treatment End Date:N/A
Treatment Summary:Fort Hays: 8770-8829
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8770 ft.# Of Holes:168
Interval Bottom:8829 ft.Hole Size:0.44 in.

Formation CD-FH                   Formation Classification:  OW                   Status:  AB - 3/27/2024                 Interval Top: 8434 ft.    Interval Bottom: 12006 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:12/21/2017Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/26/2017Treatment End Date:11/15/2017
Treatment Summary:PERF AND FRAC FROM 8434-12006. 133 BBL 7.5% HCL ACID, 65,254 BBL SLICKWATER, 1,388 BBL WATER, 66,776 TOTAL FLUID, 1,995,400# 40/70 OTTAWA/ST. PETERS, 1,995,400# TOTAL SAND.
Total fluid used in treatment (bbls):66776Max pressure during treatment (psi):6946
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:9
Total acid used in treatment (bbls):133Min frac gradient (psi/ft):0.75
Recycled water used in treatment (bbls):300Total flowback volume recovered (bbls):3806
Fresh water used in treatment (bbls):66343Disposition method For flowback:RECYCLE
Total proppant used (lbs):1995400Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/30/2017Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 100
BBLS_OIL 134
BTU_GAS 1282
CALC_BBLS_H2O 100
CALC_BBLS_OIL 134
CALC_GOR 1530
CALC_MCF_GAS 205
CASING_PRESS 1100
GRAVITY_OIL 54
MCF_GAS 205
Perforation Data:
Interval Top:8434 ft.# Of Holes:168
Interval Bottom:12006 ft.Hole Size:0.44 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 2/26/2018                 Interval Top: 8434 ft.    Interval Bottom: 12006 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/26/2018Treatment End Date:N/A
Treatment Summary:Codell: 8434-8770, 8829-12006
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:No
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8434 ft.# Of Holes:168
Interval Bottom:12006 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY03/27/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2029
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No