|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 7/21/2020 Measured TD: 16717 ft. Vertical TD: 6192 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 7/21/2020 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 10/6/2021 | Proposed Top PZ Location: | Sec:6 Twp: 8N 59W | Footage: 305 FNL 300 FWL | Bottom Hole Location: | Sec:5 Twp: 8N 58W | Footage: 305 FNL 300 FEL | Proposed Depth/Form: | 16500 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-1242 , Unit Acreage: 1280, Drill Unit: 5 & 6: All | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 43 , Citings Type: PLANNED | Cement: | Sacks: 50, Top: 0 ft., Bottom: 80 ft. | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1525 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 525, Top: 0 ft., Bottom: 1525 ft. | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16900 ft., Weight: 20 , Citings Type: PLANNED | Cement: | Sacks: 2125, Top: , Bottom: 16900 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6592 ft., Depth: 13654 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 525, Top: 6592 ft., Bottom: 13654 ft. |
| | |
Wellbore Completed | Completion Date: | 12/3/2019 | Spud Date: | 11/18/2019 | Spud Date Is: | ACTUAL | Measured TD: | 16717 ft. | Measured PB depth: | 16699 ft. | True Vertical TD: | 6192 ft. | True Vertical PB depth: | 6193 ft. | Top PZ Location: | Sec:6 Twp: 8N 59W | Footage: 320 FNL 512 FWL | Bottom Hole Location: | Sec:5 Twp: 8N 59W | Footage: 332 N 315 E | Log Types: | CBL, MWD, Mud, Res run API: 05-123-43670 | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 43 , Citings Type: ACTUAL | Cement: | Sacks: 50, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1599 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 600, Top: 1599 ft., Bottom: 0 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16699 ft., Weight: 20 , Citings Type: ACTUAL | Cement: | Sacks: 2700, Top: 630 ft., Bottom: 16699 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3622 ft. | | N | N | SUSSEX | 4365 ft. | | N | N | SHANNON | 4900 ft. | | N | N | SHARON SPRINGS | 6470 ft. | | N | N | NIOBRARA | 6520 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: PR - 7/21/2020 Interval Top: 6895 ft. Interval Bottom: 16672 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 7/15/2020 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 2/26/2020 | Treatment End Date: | 3/9/2020 | Treatment Summary: | 60 Stages Plug and Perf: Total fluid is 449,744 bbls; 449, 036 bbls fresh water, 738 bbls 7.5% HCl, 6,472,050 # 100 mesh and 18,270,970 # 40/70
| Total fluid used in treatment (bbls): | 449774 | Max pressure during treatment (psi): | 8210 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 60 | Total acid used in treatment (bbls): | 738 | Min frac gradient (psi/ft): | 0.77 | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 11045 | Fresh water used in treatment (bbls): | 469036 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 25175020 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 6539 ft. | Tubing Packer Depth: | 6545 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 7/21/2020 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 903 | BBLS_OIL | 621 | BTU_GAS | 1595 | CALC_BBLS_H2O | 903 | CALC_BBLS_OIL | 621 | CALC_GOR | 549 | CALC_MCF_GAS | 341 | CASING_PRESS | 435 | GRAVITY_OIL | 37 | MCF_GAS | 341 | TUBING_PRESS | 776 |
| Perforation Data: | Interval Top: | 6895 ft. | # Of Holes: | 2124 | Interval Bottom: | 16672 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 25519 |
Total Gas Produced (MCF) | 114394 |
GOR | 4482 |
GOR Determination | BOE |
Average BOE per Day | 123.471 |
Average MCFE per Day | 716.153 |
Federal Financial Assurance | i | Y |
|
|