Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-43469
Well Classification: OW Status: PR - 5/1/2022
Well Name/No:WAGNER #28N-E10HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2022
FacilityID:447226LocationID:328953
County:WELD #123Location:SWNE 22 1N67W 6
Field:WATTENBERG - #90750Elevation:4973 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1722FNL  1604 FELLat/Long: 40.039096 / -104.873006Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.039097 / -104.873006Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/3/2018
End Date: 4/12/2018
Reported: 5/16/2018
Days to report: 34
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/1/2022             Measured TD: 15700 ft.    Vertical TD: 7390 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/1/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:8/6/2018
Proposed Top PZ Location:Sec:22 Twp: 1N 67W Footage: 1764 FNL  2382 FEL
Bottom Hole Location:Sec:10 Twp: 1N 67W Footage: 800 FSL  2263 FEL
Proposed Depth/Form:15733 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 560, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1800 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 710, Top: 0 ft., Bottom: 1800 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 15723 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1857, Top: , Bottom: 15723 ft.

Wellbore Completed
Completion Date:11/17/2017
Spud Date:9/4/2017Spud Date Is:ACTUAL
Measured TD:15700 ft.Measured PB depth:15645 ft.
True Vertical TD:7390 ft.True Vertical PB depth:7389 ft.
Top PZ Location:Sec:22 Twp: 1N 67WFootage: 1969 FNL  2225 FEL
Bottom Hole Location:Sec:10 Twp: 1N 67WFootage: 692 FSL  2259 FEL
Log Types:MWD/LWD, CBL, CNL RUN ON THE WAGNER 2C-10HZ WELL (API: 05-123-43473).
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 101 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 101 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1853 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 669, Top: 0 ft., Bottom: 1853 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 7 in., Top: 0 ft., Depth: 5970 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 395, Top: 2992 ft., Bottom: 5970 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 5771 ft., Depth: 15695 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 590, Top: 6860 ft., Bottom: 15695 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4724 ft.
SHARON SPRINGS7385 ft.
NIOBRARA7428 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 5/1/2022                  Interval Top: 7770 ft.    Interval Bottom: 15638 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:6/14/2018Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/3/2018Treatment End Date:4/12/2018
Treatment Summary:PERF AND FRAC FROM 7770-15638. 843 BBL 7 1/2% HCL ACID, 7,252 BBL PUMP DOWN, 256,395 BBL SLICKWATER, 264,490 TOTAL FLUID, 2,068,130# 30/50 OTTAWA/ST. PETERS, 4,232,520# 40/70 OTTAWA/ST. PETERS, 6,300,650# TOTAL SAND.
Total fluid used in treatment (bbls):264490Max pressure during treatment (psi):7752
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:44
Total acid used in treatment (bbls):843Min frac gradient (psi/ft):0.87
Recycled water used in treatment (bbls):450Total flowback volume recovered (bbls):7040
Fresh water used in treatment (bbls):263197Disposition method For flowback:RECYCLE
Total proppant used (lbs):6300650Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7301 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/9/2018Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 455
BBLS_OIL 137
BTU_GAS 1337
CALC_BBLS_H2O 455
CALC_BBLS_OIL 137
CALC_GOR 1723
CALC_MCF_GAS 236
CASING_PRESS 2607
GRAVITY_OIL 54
MCF_GAS 236
TUBING_PRESS 1763
Perforation Data:
Interval Top:7770 ft.# Of Holes:1062
Interval Bottom:15638 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)2499
Total Gas Produced (MCF)58237
GOR23304
GOR DeterminationMCFE
Average BOE per Day34.481
Average MCFE per Day199.974

 Federal Financial Assurance  i 

 Tribal Well  i No