Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-43296
Well Classification: OW Status: PR - 1/7/2019
Well Name/No:Morgan Hills #1E-7H-A168
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/7/2019
FacilityID:446282LocationID:446290
Municipality/County:ERIE / WELD #123Location:NENE 7 1N68W 6
Field:WATTENBERG - #90750Elevation:5022 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:368FNL  359 FELLat/Long: 40.071987 / -105.038677Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.071987 / -105.038678Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/21/2017
End Date: 6/2/2017
Reported: 11/15/2017
Originally Reported: 11/13/2017
Days to report: 166
Days to report: 164
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 1/7/2019             Measured TD: 15930 ft.    Vertical TD: 7789 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 1/7/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/21/2018
Proposed Top PZ Location:Sec:7 Twp: 1N 68W Footage: 480 FNL  1255 FEL
Bottom Hole Location:Sec:18 Twp: 1N 68W Footage: 2198 FSL  1306 FEL
Proposed Depth/Form:17440 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBFHC , Formation: NIOBRARA-FT HAYS-CODELL , Order: , Unit Acreage: 640, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED
Cement:Sacks: 80, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1850 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 835, Top: 0 ft., Bottom: 1850 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17704 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2700, Top: , Bottom: 17704 ft.
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 17415 ft., Weight: 13.5# , Citings Type: PLANNED
Cement:Sacks: 703, Top: 7685 ft., Bottom: 17415 ft.

Wellbore Completed
Completion Date:3/14/2017
Spud Date:11/12/2016Spud Date Is:ACTUAL
Measured TD:15930 ft.Measured PB depth:15864 ft.
True Vertical TD:7789 ft.True Vertical PB depth:7787 ft.
Top PZ Location:Sec:7 Twp: 1N 68WFootage: 480 FNL  1255 FEL
Bottom Hole Location:Sec:18 Twp: 1N 68WFootage: 2198 FSL  1306 FEL
Log Types:MWD, Mud, CBL, (pulsed neutron in 05-123-43298)
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 98 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 114, Top: 0 ft., Bottom: 98 ft., Determination Method: CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1782 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 835, Top: 0 ft., Bottom: 1782 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8291 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 940, Top: 0 ft., Bottom: 8291 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 15910 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: 845, Top: 0 ft., Bottom: 15910 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4520 ft.NN
SHANNON5094 ft.NN
TEEPEE BUTTES6581 ft.NN
SHARON SPRINGS7446 ft.NN
NIOBRARA7514 ft.NN
FORT HAYS8192 ft.NN
CODELL9094 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 10/12/2018                Interval Top: 9094 ft.    Interval Bottom: 15824 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/12/2018Treatment End Date:N/A
Treatment Summary:9094-11093, 11286-11493, 11612-12210, 12410-12577, 12698-12709, 13028-14304, 14760-15824
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:9094 ft.# Of Holes:774
Interval Bottom:15824 ft.Hole Size:0.4 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 10/12/2018                Interval Top: 8192 ft.    Interval Bottom: 14759 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/12/2018Treatment End Date:N/A
Treatment Summary:8192-8342, 8821-9093, 11094-11190, 11494-11611, 12287-12409, 12578-12697, 12784-13027, 14354-14759
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8192 ft.# Of Holes:774
Interval Bottom:14759 ft.Hole Size:0.4 in.

Formation NBFHC                   Formation Classification:  OW                   Status:  PR - 1/7/2019                  Interval Top: 7926 ft.    Interval Bottom: 15824 ft.

 Completed Information for Formation NIOBRARA-FT HAYS-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-FT HAYS-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/24/2017Treatment End Date:6/2/2017
Treatment Summary:165 bbl chemical additives (FRP-4K, ACI-97, ASF-67) with 171171 bbl water, 142 bbl HCl and 4346798 lb sand used in 30 stage frac.
Total fluid used in treatment (bbls):171478Max pressure during treatment (psi):8868
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:30
Total acid used in treatment (bbls):142Min frac gradient (psi/ft):0.64
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):6432
Fresh water used in treatment (bbls):171171Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4346798Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:
Treatment Date:5/21/2017Treatment End Date:6/2/2017
Treatment Summary:Corrected treatment date(s).
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 505
BBLS_OIL 402
BTU_GAS 1298
CALC_BBLS_H2O 505
CALC_BBLS_OIL 402
CALC_GOR 2853
CALC_MCF_GAS 1147
CASING_PRESS 2900
GRAVITY_OIL 50
MCF_GAS 1147
TUBING_PRESS 1705
Perforation Data:
Interval Top:7926 ft.# Of Holes:774
Interval Bottom:15824 ft.Hole Size:0.4 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 10/12/2018                Interval Top: 7926 ft.    Interval Bottom: 8820 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/12/2018Treatment End Date:N/A
Treatment Summary:7926-8191, 8343-8820
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7926 ft.# Of Holes:774
Interval Bottom:8820 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)5388
Total Gas Produced (MCF)69991
GOR12990
GOR DeterminationBOE
Average BOE per Day47.864
Average MCFE per Day277.602

 Federal Financial Assurance  i 

 Tribal Well  i No