|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 1/23/2021 Measured TD: 13172 ft. Vertical TD: 7455 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 1/23/2021 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 9/6/2021 | Proposed Top PZ Location: | Sec:21 Twp: 3N 66W | Footage: 50 FSL 56 FWL | Bottom Hole Location: | Sec:20 Twp: 3N 66W | Footage: 50 FNL 44 FEL | Proposed Depth/Form: | 13225 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 480, Drill Unit: GWA | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 36.94 , Citings Type: PLANNED | Cement: | Sacks: 64, Top: 0 ft., Bottom: 80 ft. | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 590, Top: 0 ft., Bottom: 1500 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 13215 ft., Weight: 17 , Citings Type: PLANNED | Cement: | Sacks: 1550, Top: , Bottom: 13215 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6557 ft., Depth: 11708 ft., Weight: 13.5 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | 10/28/2019 | Spud Date: | 10/19/2019 | Spud Date Is: | ACTUAL | Measured TD: | 13172 ft. | Measured PB depth: | 13154 ft. | True Vertical TD: | 7455 ft. | True Vertical PB depth: | 7455 ft. | Top PZ Location: | Sec:21 Twp: 3N 66W | Footage: 178 FSL 49 FWL | Bottom Hole Location: | Sec:20 Twp: 3N 66W | Footage: 53 FNL 46 FEL | Log Types: | MWD/LWD. (GR/CNL in API 123-43146). | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 42 , Citings Type: ACTUAL | Cement: | Sacks: 64, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1895 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 708, Top: 0 ft., Bottom: 1895 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 13162 ft., Weight: 17 , Citings Type: ACTUAL | Cement: | Sacks: 1112, Top: 1555 ft., Bottom: 13172 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | FOX HILLS | 1105 ft. | | | | PARKMAN | 4400 ft. | | | | SUSSEX | 4553 ft. | | | | SHARON SPRINGS | 7343 ft. | | | | NIOBRARA | 7439 ft. | | | | FORT HAYS | 7950 ft. | | | | CODELL | 8059 ft. | | | |
Formation FTHYS Formation Classification: OW Status: CM - 3/11/2021 Interval Top: 12125 ft. Interval Bottom: 12850 ft. Completed Information for Formation FORT HAYS | 1st Production Date: | N/A | Choke Size: | | Formation Name: | FORT HAYS | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | HYDRAULIC FRACTURING | Treatment Date: | 3/11/2021 | Treatment End Date: | N/A | Treatment Summary: | 12125-12850 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation FTHYS. |
| Perforation Data: | Interval Top: | 12125 ft. | # Of Holes: | 306 | Interval Bottom: | 12850 ft. | Hole Size: | 0.44 in. |
|
Formation CD-FH Formation Classification: OW Status: PR - 1/23/2021 Interval Top: 8126 ft. Interval Bottom: 13131 ft. Completed Information for Formation CODELL-FORT HAYS | 1st Production Date: | 12/30/2020 | Choke Size: | | Formation Name: | CODELL-FORT HAYS | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | HYDRAULIC FRACTURING | Treatment Date: | 1/23/2021 | Treatment End Date: | N/A | Treatment Summary: | PERF FROM 8126-13131
24 BBLS 15% HCL ACID; 86 BBLS 7.5% HCL ACID; 2,556 BBLS PUMP DOWN; 90,890 BBLS SLICKWATER; 93,556 BBLS TOTAL FLUID. 2,067,978 LBS WHITE 30/50 NORTHERN WHITE SANDS CORP; 704,354 LBS WHITE 40/70 OTTAWA/ST. PETERS; 2,772,332 LBS TOTAL PROPPANT. | Total fluid used in treatment (bbls): | 93556 | Max pressure during treatment (psi): | 7711 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 13 | Total acid used in treatment (bbls): | 110 | Min frac gradient (psi/ft): | 0.86 | Recycled water used in treatment (bbls): | 300 | Total flowback volume recovered (bbls): | 4781 | Fresh water used in treatment (bbls): | 93146 | Disposition method For flowback: | | Total proppant used (lbs): | 2772332 | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7473 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 1/23/2021 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 32 | BBLS_OIL | 180 | BTU_GAS | 1353 | CALC_BBLS_H2O | 32 | CALC_BBLS_OIL | 180 | CALC_GOR | 4656 | CALC_MCF_GAS | 838 | CASING_PRESS | 2400 | GRAVITY_OIL | 47 | MCF_GAS | 838 | TUBING_PRESS | 2200 |
| Perforation Data: | Interval Top: | 8126 ft. | # Of Holes: | 306 | Interval Bottom: | 13131 ft. | Hole Size: | 0.44 in. |
|
Formation CODL Formation Classification: OW Status: CM - 3/11/2021 Interval Top: 8126 ft. Interval Bottom: 13131 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | HYDRAULIC FRACTURING | Treatment Date: | 3/11/2021 | Treatment End Date: | N/A | Treatment Summary: | 8126-12125, 12850-13131 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 8126 ft. | # Of Holes: | 306 | Interval Bottom: | 13131 ft. | Hole Size: | 0.44 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 8362 |
Total Gas Produced (MCF) | 102679 |
GOR | 12279 |
GOR Determination | BOE |
Average BOE per Day | 71.349 |
Average MCFE per Day | 413.831 |
Federal Financial Assurance | i | |
|
|