Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-43109
Well Classification: OW Status: PR - 12/1/2025
Well Name/No:HWY 52 #4S-32H-O268
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/1/2025
FacilityID:445571LocationID:434554
Municipality/County:FREDERICK / WELD #123Location:SWSE 32 2N68W 6
Field:WATTENBERG - #90750Elevation:4991 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:598FSL  1944 FELLat/Long: 40.089354 / -105.024642Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.089353 / -105.024641Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/27/2018
End Date: 3/29/2018
Reported: 4/11/2018
Days to report: 13
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 12/1/2025             Measured TD: 12162 ft.    Vertical TD: 7682 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 12/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/21/2018
Proposed Top PZ Location:Sec:32 Twp: 2N 68W Footage: 780 FSL  852 FEL
Bottom Hole Location:Sec:32 Twp: 2N 68W Footage: 491 FNL  928 FEL
Proposed Depth/Form:11878 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NFCC , Formation: NIOBRARA-FORT HAYS-CODELL-CARLILE , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED
Cement:Sacks: 80, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1691 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 737, Top: 0 ft., Bottom: 1691 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 12254 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1988, Top: , Bottom: 12254 ft.

Wellbore Completed
Completion Date:8/16/2017
Spud Date:3/11/2017Spud Date Is:ACTUAL
Measured TD:12162 ft.Measured PB depth:12103 ft.
True Vertical TD:7682 ft.True Vertical PB depth:7683 ft.
Top PZ Location:Sec:32 Twp: 2N 68WFootage: 780 FSL  852 FEL
Bottom Hole Location:Sec:32 Twp: 2N 68WFootage: 491 FNL  928 FEL
Log Types:Mud Log, MWD/LWD, CBL. (Resistivity in123-38246)
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 112 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: 190, Top: 0 ft., Bottom: 112 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1673 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 638, Top: 0 ft., Bottom: 1673 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12142 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1446, Top: 1666 ft., Bottom: 12162 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4505 ft.
SHANNON5045 ft.
TEEPEE BUTTES6603 ft.
SHARON SPRINGS7450 ft.
NIOBRARA7571 ft.
FORT HAYS8167 ft.
CODELL8628 ft.
CARLILE10945 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 2/1/2019                  Interval Top: 11216 ft.    Interval Bottom: 11240 ft.

 Completed Information for Formation CARLILE
1st Production Date:9/3/2018Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:11216 ft.# Of Holes:349
Interval Bottom:11240 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 2/1/2019                  Interval Top: 8655 ft.    Interval Bottom: 12040 ft.

 Completed Information for Formation CODELL
1st Production Date:9/3/2018Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/1/2019Treatment End Date:N/A
Treatment Summary:8655'-10291', 10500'-10241'-12040'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8655 ft.# Of Holes:349
Interval Bottom:12040 ft.Hole Size:0.42 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 2/1/2019                  Interval Top: 8374 ft.    Interval Bottom: 8606 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:9/3/2018Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8374 ft.# Of Holes:349
Interval Bottom:8606 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 2/1/2019                  Interval Top: 8099 ft.    Interval Bottom: 10366 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/3/2018Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/1/2019Treatment End Date:N/A
Treatment Summary:8099'-8100', 10325'-10366'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:8099 ft.# Of Holes:349
Interval Bottom:10366 ft.Hole Size:0.42 in.

Formation NFCC                     Formation Classification:  OW                     Status:  PR - 12/1/2025                 Interval Top: 8099 ft.    Interval Bottom: 12040 ft.

 Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE
1st Production Date:9/3/2018Choke Size: 
Formation Name:NIOBRARA-FORT HAYS-CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/27/2018Treatment End Date:3/29/2018
Treatment Summary:94959 bbls water and 80 bbls additives (FRP-4CS and FRP-K) in a 16 stage frac with 2,470,150 lbs of silica quartz proppant
Total fluid used in treatment (bbls):95039Max pressure during treatment (psi):8749
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:16
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.91
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):13613
Fresh water used in treatment (bbls):95039Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2470150Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7869 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/3/2018Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 102
BBLS_OIL 268
BTU_GAS 1250
CALC_BBLS_H2O 102
CALC_BBLS_OIL 268
CALC_GOR 1709
CALC_MCF_GAS 458
CASING_PRESS 2096
GRAVITY_OIL 45
MCF_GAS 458
TUBING_PRESS 1129
Perforation Data:
Interval Top:8099 ft.# Of Holes:349
Interval Bottom:12040 ft.Hole Size:0.42 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)19
GOR
GOR DeterminationMCFE
Average BOE per Day0.008
Average MCFE per Day0.052

 Federal Financial Assurance  i 

 Tribal Well  i No