|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 7/1/2020 Measured TD: 17025 ft. Vertical TD: 5958 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 7/1/2020 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 3/28/2018 | | Proposed Top PZ Location: | Sec:22 Twp: 9N 59W | Footage: 365 FNL 2144 FEL | | Bottom Hole Location: | Sec:10 Twp: 9N 59W | Footage: 365 FNL 2144 FEL | | Proposed Depth/Form: | 16340 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-681 , Unit Acreage: 3840, Drill Unit: S:10,11,14,15,22,23 | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED | | Cement: | Sacks: 6, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1850 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 535, Top: 0 ft., Bottom: 1850 ft. | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17131 ft., Weight: 20 , Citings Type: PLANNED | | Cement: | Sacks: 6451, Top: , Bottom: | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6231 ft., Depth: 16340 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 2/14/2017 | | Spud Date: | 2/3/2017 | Spud Date Is: | ACTUAL | | Measured TD: | 17025 ft. | Measured PB depth: | 5535 ft. | | True Vertical TD: | 5958 ft. | True Vertical PB depth: | 5472 ft. | | Top PZ Location: | Sec:22 Twp: 9N 59W | Footage: 365 FNL 2144 FEL | | Bottom Hole Location: | Sec:10 Twp: 9N 59W | Footage: 365 FNL 2144 FEL | | Log Types: | MWD/LWD | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 110 ft., Weight: 42.09 , Citings Type: ACTUAL | | Cement: | Sacks: 64, Top: 0 ft., Bottom: 110 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1927 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 660, Top: 0 ft., Bottom: 1927 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 6196 ft., Depth: 14029 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Casing: | String Type: OPEN HOLE, Hole Size: 8.5 in., Size: , Top: 14029 ft., Depth: 17025 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Additional Cement: | String Type: 1ST , Top: 5535 ft., Depth: 6160 ft., Bottom: 6160 ft., Sacks: 275, Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3438 ft. | | | | | SUSSEX | 4117 ft. | | | | | SHANNON | 4583 ft. | | | | | TEEPEE BUTTES | 5327 ft. | | | | | NIOBRARA | 6196 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 7/1/2020 Interval Top: 6480 ft. Interval Bottom: 17011 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 12/11/2017 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 8/7/2017 | Treatment End Date: | 9/14/2017 | | Treatment Summary: | NIOBRARA FRAC'D WITH 8,396,867 LBS 40/70 SAND, 87972 GALS OF 15%HCl, and 9,836,077 GALS SLURRY. | | Total fluid used in treatment (bbls): | 244314 | Max pressure during treatment (psi): | 8192 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.46 | | Type Of gas: | | Number Of staged intervals: | 214 | | Total acid used in treatment (bbls): | 2094 | Min frac gradient (psi/ft): | 0.88 | | Recycled water used in treatment (bbls): | 1500 | Total flowback volume recovered (bbls): | 217 | | Fresh water used in treatment (bbls): | 240720 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 8396867 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6296 ft. | | Tubing Packer Depth: | 6303 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/15/2017 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1491 | | BBLS_OIL | 364 | | BTU_GAS | 1390 | | CALC_BBLS_H2O | 1491 | | CALC_BBLS_OIL | 364 | | CALC_GOR | 604 | | CALC_MCF_GAS | 220 | | CASING_PRESS | 10 | | GRAVITY_OIL | 34 | | MCF_GAS | 220 | | TUBING_PRESS | 813 |
| | Perforation Data: | | Interval Top: | 6480 ft. | # Of Holes: | 1284 | | Interval Bottom: | 17011 ft. | Hole Size: | 0.48 in. |
|
Sidetrack #01 Wellbore Classification: OW Status: PR - 2/14/2017 Measured TD: 17145 ft. Vertical TD: 6040 ft.| Wellbore Data for Sidetrack #01 | Wellbore Classification: OW PR - 2/14/2017 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 2/14/2019 | | Proposed Top PZ Location: | Sec:22 Twp: 9N 59W | Footage: 400 FNL 2115 FEL | | Bottom Hole Location: | Sec:10 Twp: 9N 59W | Footage: 330 FNL 2090 FEL | | Proposed Depth/Form: | 17131 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-681 , Unit Acreage: 3840, Drill Unit: S:10,11,14,15,22,23 | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 110 ft., Weight: 42 , Citings Type: PLANNED | | Cement: | Sacks: 63, Top: 0 ft., Bottom: 110 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1927 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 660, Top: 0 ft., Bottom: 1927 ft. | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17131 ft., Weight: 20 , Citings Type: PLANNED | | Cement: | Sacks: 6451, Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 2/18/2017 | | Spud Date: | 2/3/2017 | Spud Date Is: | ACTUAL | | Measured TD: | 17145 ft. | Measured PB depth: | 17092 ft. | | True Vertical TD: | 6040 ft. | True Vertical PB depth: | 6040 ft. | | Bottom Hole Location: | Sec:10 Twp: 9N 59W | Footage: 343 FNL 2060 FEL | | Log Types: | CBL, MWD/LWD, (DIL in API 123-42982) | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 110 ft., Weight: 42.09 , Citings Type: ACTUAL | | Cement: | Sacks: 64, Top: 0 ft., Bottom: 110 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1927 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 660, Top: 0 ft., Bottom: 1927 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17145 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 1867, Top: 2962 ft., Bottom: 17145 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3438 ft. | | | | | SUSSEX | 4117 ft. | | | | | SHANNON | 4583 ft. | | | | | TEEPEE BUTTES | 5305 ft. | | | | | SHARON SPRINGS | 6056 ft. | | | | | NIOBRARA | 6081 ft. | | | | | No formation data to display. |
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 5274 |
| Total Gas Produced (MCF) | 10992 |
| GOR | 2084 |
| GOR Determination | BOE |
| Average BOE per Day | 19.647 |
| Average MCFE per Day | 113.937 |
| Federal Financial Assurance | i | |
|
|