|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 11/1/2024 Measured TD: 16272 ft. Vertical TD: 6550 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 11/1/2024 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 2/4/2018 | | Proposed Top PZ Location: | Sec:26 Twp: 5N 64W | Footage: 520 FNL 820 FWL | | Bottom Hole Location: | Sec:25 Twp: 5N 64W | Footage: 500 FNL 500 FEL | | Proposed Depth/Form: | 13677 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 640, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1400 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 920, Top: 0 ft., Bottom: 1400 ft. | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16278 ft., Weight: 20 , Citings Type: PLANNED | | Cement: | Sacks: 2035, Top: 0 ft., Bottom: 16278 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 5888 ft., Depth: 13677 ft., Weight: 13.5 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 5/15/2016 | | Spud Date: | 5/9/2016 | Spud Date Is: | ACTUAL | | Measured TD: | 16272 ft. | Measured PB depth: | 16255 ft. | | True Vertical TD: | 6550 ft. | True Vertical PB depth: | 6550 ft. | | Top PZ Location: | Sec:26 Twp: 5N 64W | Footage: 512 FSL 737 FWL | | Bottom Hole Location: | Sec:25 Twp: 5N 64W | Footage: 497 FNL 502 FEL | | Log Types: | CBL, MWD (DIL in 123-19303) | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1465 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 660, Top: 0 ft., Bottom: 1465 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 9.625 in., Top: 0 ft., Depth: 16270 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 2445, Top: 800 ft., Bottom: 16270 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3495 ft. | | | | | SUSSEX | 4187 ft. | | | | | SHARON SPRINGS | 6349 ft. | | | | | NIOBRARA | 6515 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 11/1/2024 Interval Top: 6951 ft. Interval Bottom: 16203 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 12/16/2016 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 10/20/2016 | Treatment End Date: | 11/6/2016 | | Treatment Summary: | 55 Stage Plug and Perf, Perf'd from 6951-16081, 3 Toe Sleeves from 16110-16203
Total Fluid: 194,293 bbls
Gel Fluid: 136,958 bbls
Slickwater Fluid: 55,971 bbls
15% HCl Acid: 1,364 bbls
Total Proppant: 10,319,500 lbs
Silica Proppant: 10,319,500 lbs
Method for determining flowback: measuring flowback tank volumes | | Total fluid used in treatment (bbls): | 194293 | Max pressure during treatment (psi): | 4699 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 55 | | Total acid used in treatment (bbls): | 1364 | Min frac gradient (psi/ft): | 0.98 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 8207 | | Fresh water used in treatment (bbls): | 192929 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 10319500 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6705 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/23/2016 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 317 | | BBLS_OIL | 535 | | BTU_GAS | 1395 | | CALC_BBLS_H2O | 317 | | CALC_BBLS_OIL | 535 | | CALC_GOR | 2261 | | CALC_MCF_GAS | 1210 | | CASING_PRESS | 2625 | | GRAVITY_OIL | 50 | | MCF_GAS | 1210 | | TUBING_PRESS | 1794 |
| | Perforation Data: | | Interval Top: | 6951 ft. | # Of Holes: | 1068 | | Interval Bottom: | 16203 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 4788 |
| Total Gas Produced (MCF) | 150158 |
| GOR | 31361 |
| GOR Determination | MCFE |
| Average BOE per Day | 84.110 |
| Average MCFE per Day | 487.847 |
| Federal Financial Assurance | i | |
|
|