Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-42586
Well Classification: OW Status: PR - 4/1/2018
Well Name/No:Marcus LD #11-377HN
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/1/2018
FacilityID:444368LocationID:440806
County:WELD #123Location:SESE 34 1N67W 6
Field:WATTENBERG - #90750Elevation:5042 ft.
Planned Location:967FSL  410 FELLat/Long: 40.003028 / -104.868583Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.003025 / -104.868583Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/14/2016
End Date: 11/1/2016
Reported: 12/28/2016
Days to report: 57
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 4/1/2018             Measured TD: 17685 ft.    Vertical TD: 7558 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 4/1/2018
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:12/17/2017
Prop Depth/Form:17722 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 640, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 121, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 707, Top: 0 ft., Bottom: 1700 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17813 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2259, Top: , Bottom: 17813 ft.

Wellbore Completed
Completion Date:9/15/2016
Spud Date:7/21/2016Spud Date Is:ACTUAL
Measured TD:17685 ft.Measured PB depth:17642 ft.
True Vertical TD:7558 ft.True Vertical PB depth:7558 ft.
Top PZ Location:Sec:2 Twp: 1S 67WFootage: 681 FNL  1037 FWLDepth
Bottom Hole Location:Sec:11 Twp: 1S 67WFootage: 383 FSL  1006 FWLDepth
Log Types:CBL, Mud Log, MWD/LWD, (IND in API 123-20894)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1734 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 750, Top: 0 ft., Bottom: 1734 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17685 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 2677, Top: 46 ft., Bottom: 17685 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4509 ft.4667 ft.NN
SUSSEX4894 ft.5125 ft.NN
SHANNON5718 ft.5937 ft.NN
SHARON SPRINGS7710 ft.NN
NIOBRARA7867 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 12/27/2016                Interval Top: 8462 ft.    Interval Bottom: 17562 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:12/20/2016Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/14/2016Treatment End Date:11/1/2016
Treatment Summary:3433 bbls 15% HCl; 804,199 lbs 100 Mesh; 13,114,091 lbs 20/40; 258,385 bbls gel; Flowback determined from well test separator.
Total fluid used in treatment (bbls):261818Max pressure during treatment (psi):5345
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:61
Total acid used in treatment (bbls):3433Min frac gradient (psi/ft):0.92
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):13539
Fresh water used in treatment (bbls):258385Disposition method For flowback:DISPOSAL
Total proppant used (lbs):13918290Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.875 in.Tubing Setting Depth:8105 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/27/2016Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 421
BBLS_OIL 688
BTU_GAS 1293
CALC_BBLS_H2O 421
CALC_BBLS_OIL 688
CALC_GOR 1053
CALC_MCF_GAS 725
CASING_PRESS 2250
GRAVITY_OIL 42
MCF_GAS 725
TUBING_PRESS 1500
Perforation Data:
Interval Top:8462 ft.# Of Holes:1464
Interval Bottom:17562 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2023 - September 2024i
Total Oil Produced (Barrels)3142
Total Gas Produced (MCF)45389
GOR14445
GOR DeterminationBOE
Average BOE per Day29.970
Average MCFE per Day173.836

 Federal Financial Assurance  i 

 Tribal Well  i No