Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-42581
Well Classification: OW Status: PR - 7/20/2017
Well Name/No:GARFIELD #27C-14HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/20/2017
FacilityID:444357LocationID:444349
County:WELD #123Location:SWSE 23 1N67W 6
Field:WATTENBERG - #90750Elevation:4988 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:290FSL  1935 FELLat/Long: 40.030160 / -104.855286Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.030161 / -104.855283Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/8/2017
End Date: 6/11/2017
Reported: 7/18/2017
Days to report: 37
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 7/20/2017             Measured TD: 14144 ft.    Vertical TD: 7607 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 7/20/2017
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:12/16/2017
Proposed Top PZ Location:Sec:26 Twp: 1N 67W Footage: 50 FNL  1590 FEL
Bottom Hole Location:Sec:14 Twp: 1N 67W Footage: 700 FSL  1578 FEL
Proposed Depth/Form:14121 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 480, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1800 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 710, Top: 0 ft., Bottom: 1800 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 14111 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1456, Top: , Bottom: 14111 ft.

Wellbore Completed
Completion Date:3/28/2017
Spud Date:1/4/2017Spud Date Is:ACTUAL
Measured TD:14144 ft.Measured PB depth:14042 ft.
True Vertical TD:7607 ft.True Vertical PB depth:7614 ft.
Top PZ Location:Sec:26 Twp: 1N 67WFootage: 38 FNL  1585 FEL
Bottom Hole Location:Sec:14 Twp: 1N 67WFootage: 712 FSL  1599 FEL
Log Types:CBL, MWD, (CNL in 123-42573).
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 97 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 97 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2232 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 873, Top: 0 ft., Bottom: 2232 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 14135 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1900, Top: 122 ft., Bottom: 14135 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4826 ft.
SHARON SPRINGS7394 ft.
NIOBRARA7417 ft.
FORT HAYS8055 ft.
CODELL8567 ft.
CARLILE9299 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 8/14/2017                 Interval Top: 9298 ft.    Interval Bottom: 14033 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/14/2017Treatment End Date:N/A
Treatment Summary:CARLILE: 9298-13,349; 13,461-13,850; 13,994-14,033;
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:9298 ft.# Of Holes:336
Interval Bottom:14033 ft.Hole Size:0.44 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 8/14/2017                 Interval Top: 8574 ft.    Interval Bottom: 13994 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/14/2017Treatment End Date:N/A
Treatment Summary:CODELL: 8574-9298; 13,349-13,461;13,850-13,994;
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8574 ft.# Of Holes:336
Interval Bottom:13994 ft.Hole Size:0.44 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 7/20/2017                 Interval Top: 8168 ft.    Interval Bottom: 14033 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:7/8/2017Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/8/2017Treatment End Date:6/11/2017
Treatment Summary:"PERF AND FRAC FROM 8168-14,033. 143 BBL 7.5% HCL ACID, 2,970 BBL PUMP DOWN, 93,369 BBL SLICKWATER, - 96,482 TOTAL FLUID 2,835,550# 40/70 OTTAWA/ST. PETERS, - 2,835,550# TOTAL SAND.
Total fluid used in treatment (bbls):96482Max pressure during treatment (psi):7734
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:15
Total acid used in treatment (bbls):143Min frac gradient (psi/ft):0.87
Recycled water used in treatment (bbls):2445Total flowback volume recovered (bbls):2927
Fresh water used in treatment (bbls):93894Disposition method For flowback:RECYCLE
Total proppant used (lbs):2835550Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/20/2017Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 100
BBLS_OIL 79
BTU_GAS 1288
CALC_BBLS_H2O 100
CALC_BBLS_OIL 79
CALC_GOR 1557
CALC_MCF_GAS 123
CASING_PRESS 1850
GRAVITY_OIL 52
MCF_GAS 123
Perforation Data:
Interval Top:8168 ft.# Of Holes:336
Interval Bottom:14033 ft.Hole Size:0.44 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 8/14/2017                 Interval Top: 8168 ft.    Interval Bottom: 8574 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/14/2017Treatment End Date:N/A
Treatment Summary:FT HAYS: 8168-8574
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8168 ft.# Of Holes:336
Interval Bottom:8574 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)1735
Total Gas Produced (MCF)53937
GOR31087
GOR DeterminationMCFE
Average BOE per Day30.360
Average MCFE per Day176.046

 Federal Financial Assurance  i 

 Tribal Well  i No