|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 7/20/2017 Measured TD: 14144 ft. Vertical TD: 7607 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 7/20/2017 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 12/16/2017 | | Proposed Top PZ Location: | Sec:26 Twp: 1N 67W | Footage: 50 FNL 1590 FEL | | Bottom Hole Location: | Sec:14 Twp: 1N 67W | Footage: 700 FSL 1578 FEL | | Proposed Depth/Form: | 14121 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 480, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1800 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 710, Top: 0 ft., Bottom: 1800 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 14111 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 1456, Top: , Bottom: 14111 ft. |
| | |
| Wellbore Completed | | Completion Date: | 3/28/2017 | | Spud Date: | 1/4/2017 | Spud Date Is: | ACTUAL | | Measured TD: | 14144 ft. | Measured PB depth: | 14042 ft. | | True Vertical TD: | 7607 ft. | True Vertical PB depth: | 7614 ft. | | Top PZ Location: | Sec:26 Twp: 1N 67W | Footage: 38 FNL 1585 FEL | | Bottom Hole Location: | Sec:14 Twp: 1N 67W | Footage: 712 FSL 1599 FEL | | Log Types: | CBL, MWD, (CNL in 123-42573). | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 97 ft., Weight: 42 , Citings Type: ACTUAL | | Cement: | Sacks: 64, Top: 0 ft., Bottom: 97 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2232 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 873, Top: 0 ft., Bottom: 2232 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 14135 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 1900, Top: 122 ft., Bottom: 14135 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4826 ft. | | | | | SHARON SPRINGS | 7394 ft. | | | | | NIOBRARA | 7417 ft. | | | | | FORT HAYS | 8055 ft. | | | | | CODELL | 8567 ft. | | | | | CARLILE | 9299 ft. | | | |
Formation CARL Formation Classification: OW Status: CM - 8/14/2017 Interval Top: 9298 ft. Interval Bottom: 14033 ft.| Completed Information for Formation CARLILE | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CARLILE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 8/14/2017 | Treatment End Date: | N/A | | Treatment Summary: | CARLILE: 9298-13,349; 13,461-13,850; 13,994-14,033; | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CARL. |
| | Perforation Data: | | Interval Top: | 9298 ft. | # Of Holes: | 336 | | Interval Bottom: | 14033 ft. | Hole Size: | 0.44 in. |
|
Formation CODL Formation Classification: OW Status: CM - 8/14/2017 Interval Top: 8574 ft. Interval Bottom: 13994 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 8/14/2017 | Treatment End Date: | N/A | | Treatment Summary: | CODELL: 8574-9298; 13,349-13,461;13,850-13,994; | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 8574 ft. | # Of Holes: | 336 | | Interval Bottom: | 13994 ft. | Hole Size: | 0.44 in. |
|
Formation CLCDFH Formation Classification: OW Status: PR - 7/20/2017 Interval Top: 8168 ft. Interval Bottom: 14033 ft.| Completed Information for Formation CARLILE-CODELL-FORT HAYS | | 1st Production Date: | 7/8/2017 | Choke Size: | | | Formation Name: | CARLILE-CODELL-FORT HAYS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 6/8/2017 | Treatment End Date: | 6/11/2017 | | Treatment Summary: | "PERF AND FRAC FROM 8168-14,033.
143 BBL 7.5% HCL ACID, 2,970 BBL PUMP DOWN, 93,369 BBL SLICKWATER, - 96,482 TOTAL FLUID
2,835,550# 40/70 OTTAWA/ST. PETERS, - 2,835,550# TOTAL SAND.
| | Total fluid used in treatment (bbls): | 96482 | Max pressure during treatment (psi): | 7734 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 15 | | Total acid used in treatment (bbls): | 143 | Min frac gradient (psi/ft): | 0.87 | | Recycled water used in treatment (bbls): | 2445 | Total flowback volume recovered (bbls): | 2927 | | Fresh water used in treatment (bbls): | 93894 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 2835550 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/20/2017 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 100 | | BBLS_OIL | 79 | | BTU_GAS | 1288 | | CALC_BBLS_H2O | 100 | | CALC_BBLS_OIL | 79 | | CALC_GOR | 1557 | | CALC_MCF_GAS | 123 | | CASING_PRESS | 1850 | | GRAVITY_OIL | 52 | | MCF_GAS | 123 |
| | Perforation Data: | | Interval Top: | 8168 ft. | # Of Holes: | 336 | | Interval Bottom: | 14033 ft. | Hole Size: | 0.44 in. |
|
Formation FTHYS Formation Classification: OW Status: CM - 8/14/2017 Interval Top: 8168 ft. Interval Bottom: 8574 ft.| Completed Information for Formation FORT HAYS | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | FORT HAYS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 8/14/2017 | Treatment End Date: | N/A | | Treatment Summary: | FT HAYS: 8168-8574 | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation FTHYS. |
| | Perforation Data: | | Interval Top: | 8168 ft. | # Of Holes: | 336 | | Interval Bottom: | 8574 ft. | Hole Size: | 0.44 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 1735 |
| Total Gas Produced (MCF) | 53937 |
| GOR | 31087 |
| GOR Determination | MCFE |
| Average BOE per Day | 30.360 |
| Average MCFE per Day | 176.046 |
| Federal Financial Assurance | i | |
|
|